Planning application
Stroudwater Canal Phase 1B Eastington Gloucestershire
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Discharge of condition 32 (flood mitigation) from S.19/0291/FUL. (Site wide).
As published by the council, reference S.24/1889/DISCON
Application record
- Reference
- S.24/1889/DISCON
- Type
- Discharge of Condition
- Status
- Application Withdrawn
- Decision
- Withdrawn
- Received
- 18 Oct 2024
- Validated
- 1 Nov 2024
- Decided
- 5 Dec 2024
- Ward
- Severn Ward
- Parish
- Eastington Parish Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Stroud register
This site has had 13 applications since 2024: 1 approved, 0 refused.
-
S.26/0130/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
-
S.26/0143/VAR Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
-
S.26/0081/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.
-
S.25/2466/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
-
S.25/2313/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.
-
S.25/2109/TCA Granted
Stroudwater Canal Phase 1B Eastington Gloucestershire
Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack willow & bramble scrub. T3 - 3 x 10m & 4 x 8m crack willow & scrub. T4 - 12m crack willow 4 trunks from one base.
-
S.25/2078/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.
-
S.25/0252/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
-
S.24/1947/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
-
S.24/1925/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL. (Site wide).
Timeline
Dates from the published record
-
18 Oct 2024
Received by Stroud
-
1 Nov 2024
Validated
Checked as complete and ready for consideration.
-
5 Dec 2024
Decision issued: Withdrawn
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Stroud decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
Decided Conditions 9 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
Decided Conditions 8 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.
Decided Conditions 4 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
Decided Conditions 5 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
Decided Conditions 3 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
Decided Amendments 12 docs
Other condition discharge and variation applications
In Stroud
-
S.26/0641/DISCON Decided
Beech House Church Street Kings Stanley Stonehouse Gloucestershire GL10 3HW
Discharge of condition 3 (rooflight), 4 (internal works) and 5 (schedule of repairs) from S.25/2132/LBC.
-
S.25/2089/DISCON Withdrawn
Parcel H3 - H5 Box Road Cam Gloucestershire
Partial discharge of condition 19 (cycle path) from S.15/2804/OUT for parcels H3 - H5.
-
S.26/0610/DISCON Decided
Eastington Trading Estate Churchend Eastington Gloucestershire GL10 3RZ
Discharge of condition 5 (lighting design strategy) and 6 (biodiversity enhancement) from S.22/0273/FUL.
-
S.26/1003/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 5 (biodiversity enhancement) from S.26/0203/LBC.
-
S.26/0909/DISCON Decided
Parcel LC1A Phase 1 Land West Of Stonehouse Grove Lane Westend Stonehouse Gloucestershire
Discharge of condition 21 (public transport infrastructure), 28 (fire hydrants), 29 (management and maintenance of streets), 32 (foul and surface water disposal), 37 (CMS and transport plan) and 38 (CEMP) from S.14/0810/OUT.