Skip to content
PlanIndex Get alerts
Menu

Planning application

Stroudwater Canal Phase 1B Eastington Gloucestershire

Withdrawn Stroud S.24/1889/DISCON Discharge of Condition

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Discharge of condition 32 (flood mitigation) from S.19/0291/FUL. (Site wide).

As published by the council, reference S.24/1889/DISCON

Application record

Reference
S.24/1889/DISCON
Type
Discharge of Condition
Status
Application Withdrawn
Decision
Withdrawn
Received
18 Oct 2024
Validated
1 Nov 2024
Decided
5 Dec 2024
Ward
Severn Ward
Parish
Eastington Parish Council
Decision by
Delegated Decision

Site history

Applications at this address on the Stroud register

This site has had 13 applications since 2024: 1 approved, 0 refused.

  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • S.26/0143/VAR Decided

    Stroudwater Canal Phase 1B Eastington Gloucestershire

    Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.

    Decided 15 Jun 2026 Amendments
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.

    Decided 13 May 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).

    Decided 10 Apr 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • S.25/2109/TCA Granted

    Stroudwater Canal Phase 1B Eastington Gloucestershire

    Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack willow & bramble scrub. T3 - 3 x 10m & 4 x 8m crack willow & scrub. T4 - 12m crack willow 4 trunks from one base.

    Decided 3 Dec 2025 Trees
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.

    Decided 22 Apr 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.

    Decided 1 Jul 2026 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.

    Decided 8 Nov 2024 Conditions
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL. (Site wide).

    Decided 19 Dec 2024 Conditions

Timeline

Dates from the published record

  1. 18 Oct 2024

    Received by Stroud

  2. 1 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 5 Dec 2024

    Decision issued: Withdrawn

  4. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Stroud decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/2466/DISCON Submitted 15 Dec 2025 0m away

    Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).

    Decided Conditions 9 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/0252/DISCON Submitted 10 Feb 2025 0m away

    Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.

    Decided Conditions 8 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.25/2078/DISCON Submitted 24 Oct 2025 0m away

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/2311/VAR.

    Decided Conditions 4 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.24/1947/DISCON Submitted 25 Oct 2024 0m away

    Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.

    Decided Conditions 5 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.26/0130/DISCON Submitted 21 Jan 2026 0m away

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.

    Decided Conditions 3 docs
  • Stroudwater Canal Phase 1B Eastington Gloucestershire

    S.26/0143/VAR Submitted 21 Jan 2026 0m away

    Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.

    Decided Amendments 12 docs

In Stroud

  • Beech House Church Street Kings Stanley Stonehouse Gloucestershire GL10 3HW

    Discharge of condition 3 (rooflight), 4 (internal works) and 5 (schedule of repairs) from S.25/2132/LBC.

    13 Apr 2026 Conditions
  • S.25/2089/DISCON Withdrawn

    Parcel H3 - H5 Box Road Cam Gloucestershire

    Partial discharge of condition 19 (cycle path) from S.15/2804/OUT for parcels H3 - H5.

    29 Oct 2025 Conditions
  • Eastington Trading Estate Churchend Eastington Gloucestershire GL10 3RZ

    Discharge of condition 5 (lighting design strategy) and 6 (biodiversity enhancement) from S.22/0273/FUL.

    7 Apr 2026 Conditions
  • The White House Cam Dursley Gloucestershire GL11 5JA

    Discharge of condition 5 (biodiversity enhancement) from S.26/0203/LBC.

    3 Jun 2026 Conditions
  • Parcel LC1A Phase 1 Land West Of Stonehouse Grove Lane Westend Stonehouse Gloucestershire

    Discharge of condition 21 (public transport infrastructure), 28 (fire hydrants), 29 (management and maintenance of streets), 32 (foul and surface water disposal), 37 (CMS and transport plan) and 38 (CEMP) from S.14/0810/OUT.

    27 May 2026 Conditions