Planning application
S.26/0143/VAR
Stroudwater Canal Phase 1B Eastington Gloucestershire
Proposal
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
As published by the council, reference S.26/0143/VAR
Timeline
Dates from the published record
-
21 Jan 2026
Received by Stroud
-
5 Mar 2026
Validated
Checked as complete and ready for consideration.
-
15 Jun 2026
Decision issued: Permission
-
27 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
S.25/2466/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
-
S.25/0252/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
-
S.24/1947/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application S.19/0291/FUL.
-
S.26/0130/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR.
-
S.25/2313/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and 12 from S.24/2311/VAR.
-
S.26/0081/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR.
Other amendments applications
In Stroud
-
S.26/1231/MINAM Granted
15 Dr Browns Close Minchinhampton Stroud Gloucestershire GL6 9DW
Non-material amendment to S.25/2217/HHOLD - alteration to walling material on south elevation.
-
S.26/1081/MINAM Granted
Land Adjoining Stroud Road Whaddon Gloucester Gloucestershire
Non-material amendment to S.24/0609/FUL - layout amendments
-
S.26/1127/MINAM Granted
The Willows Tinkley Lane Nympsfield Stonehouse Gloucestershire GL10 3UH
Non-material amendment to S.25/0694/HHOLD (Erection of a two storey side extension & installation of solar panels to roof) - front & side elevation door/window changes to improve layout; Changing recon stone walling to render, matching tooled finish.
-
S.26/1289/MINAM Awaiting decision
Thomas Keble School Eastcombe Stroud Gloucestershire GL6 7DY
Non-material amendment to S.26/0436/VAR - Correct reference in Condition 1 from 137059/WWA-00-ZZ-DR-0011 P06 to 13709-WWA-00-ZZ-DR-L-0144 P06, and change colour reference in Condition 3 from dark green, to dark green and blue.
-
S.26/1264/MINAM Awaiting decision
Beechwood Park Burleigh Stroud Gloucestershire GL5 2PH
Non-material amendment to S.25/0590/HHOLD - installation of new windows