Archive · Shetland Islands · 2025
Planning applications in Shetland Islands, October 2025
Shetland Islands recorded 28 planning applications in October 2025, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, October 2025
Newest first
-
2025/282/PPF Granted
Kiandra Symbister Whalsay Shetland ZE2 9AG
To demolish existing dwelling house and to construct new single storey dwelling house. Section of land change of use.
-
2025/281/PPF Granted
Lower Voe Voe Shetland
Erect Agricultural Shed 24M x 11M
-
2025/280/PPF Granted
Stakkadale Bigton Shetland ZE2 9JA
Install 2 x Roof Mounted Stainless Steel Flues for Coffee Roastery Machine to Existing Building.
-
`2025/280/PPF Granted
Stakkadale Bigton Shetland ZE2 9JA
Install 2 x Roof Mounted Stainless Steel Flues for Coffee Roastery Machine to Existing Building.
-
2022/246/DCON1 Withdrawn
Bonhoga Veensgarth Tingwall Shetland ZE2 9SE
Application for consent, agreement or approval required by planning Condition: 04 (Surface water soakaway position) of planning application 2022/246/PPF
-
2025/279/ECUCON Decided
Northern Shetland 220kV To Kergord 132kV
To run overhead line between North of Kergord Converter Station running generally parallel to the A970 before passing Voe and running alongside the A968 towards the Toft / Scatsta area.
-
2024/071/DCON1 Granted
Plot 1 Whalsay Shetland
Application for consent, agreement or approval required by planning condition 4 (Species Protection Plan) of planning permission 2024/071/PPF
-
2024/136/DCON1 Granted
Easthouse Croft Duncansclate Burra Shetland ZE2 9LD
Application for consent, agreement or approval required by planning conditions 2 (colour roof) & Condition 6 (window details) of planning permission 2024/136/LBC
-
2025/278/PPF Granted
Plots 9 & 10 Catfirth Skellister South Nesting Shetland
Erection of two single storey properties, formation of vehicular access, erection of 1m post and wire boundary fence and associated landscaping and drainage works.
-
2025/276/PPF Granted
Abon-Da-Bod Nesbister Whiteness Shetland ZE2 9LJ
Erect steel frame garage
-
2025/275/PPF Granted
Blacksness Pier Blacksness Scalloway Shetland
Proposed new factory building for fish processing including parking facilities.
-
2025/277/PAN Decided
Tag Dale Gremista Lerwick
Proposal of Application Notice - Proposed Green Ammonia Facility
-
2025/268/PPF Granted
38 St Olaf Street Lerwick Shetland ZE1 0DA
External alterations including replacement of 2 no. External doors and installation of 2 no. extract vents
-
2025/269/CAC Granted
7, 7a, 9, 9a, 22, 22a, 24, 24A Pitt Lane, Lerwick Shetland ZE1 0YP
Conservation Area Consent for the demolition of two buildings comprising eight flatted dwellings.
-
2025/266/PN Refused
Patriks Croft South Califf Gott Shetland ZE2 9SF
Prior Notification for Farm-related Building Works (Non-residential).
-
2025/267/PPF Granted
Plot Symbister Whalsay Shetland
Proposed demolition of existing agricultural outbuilding and erection of new two bedroom dwellinghouse with decking, with parking and associated services including change of use to private garden land from agricultural land and air source heat pump.
-
2025/097/DCON1 Granted
Plot Ollaberry Shetland ZE2 9RX
Application for consent, agreement or approval required by planning Condition: 02 of planning application 2025/097/LBC.
-
2025/265/PPF Granted
Static Caravan Cunningsburgh Shetland ZE2 9HF
To site portable static mobile home
-
2025/264/PPF Granted
North Haven Care Centre Brae Shetland ZE2 9TY
To install a new 86kVA rapid charger to serve two parking spaces at North Haven Care Centre supplied by a new dedicated electricity supply.
-
2025/263/LBC Granted
Fetlar Kirk
Internal alterations including conversion of existing vestry to provide new accessible toilet, alterations to store walls; remove 3 no. rows of pews in church hall; carry out ceiling & cornicing repairs; install replacement cornicing and lath; install new floor, wall and ceiling insulation; essential ceiling repairs. External alterations including installation of replacement door, replacement roof lights; new conservation rooflight; install replacement roof finish; install new gravel path to access the new toilet; carryout essential wall, window and roof repairs, install new roof insulation, and retrospective removal of cornice and repairs to coomb ceiling.
-
2025/262/PPF Granted
Gorwel Meal Burra Shetland ZE2 9LB
To site new glamping pod; create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2025/261/LBC Granted
Voxter Outdoor Centre Voxter Brae Shetland ZE2 9QP
To replace existing single glazed timber sash and case windows with new timber sash and case units.
-
2025/260/PPF Granted
Soothend Storage Unit Cunningsburgh Industrial Estate Cunningsburgh Shetland
Change of Use from Workshop/Office/Storage Shed to Gymnastics Facility (Class 11 Assembly & Leisure).
-
2025/259/PPF Granted
Lower Field Adjacent To Ollaberry Bay Ollaberry Shetland ZE2 9RT
To install 2no. mobile saunas on grassed field including changing vestibule and installation of timber-lined benches and a stove; upgrade of parking area for visitors.
-
2025/258/PPF Awaiting decision
South-West Of Nordavatn Lerwick Shetland ZE1 0JF
To create new bus parking area with adjacent fuelling and washing bays; install fuel tank and other facilities; erect new staff welfare building.
-
2025/257/PPP Refused
Plot Trondra Shetland
To erect 7 detached dwellinghouses; install associated drainage and road infrastructure (Planning Permission in Principle).
-
2025/256/PPF Granted
Annfield Sand Garderhouse Shetland ZE2 9NQ
To refurbishment existing dwellinghouse including replacement of roof covering to main house & existing extension; erect porch extension to north-east elevation.
-
2025/255/PPF Granted
St Albern Sandwick Shetland ZE2 9HW
To convert an existing single-storey garage to form a single-storey self-contained residential unit, including the construction of a single-storey porch and the installation of a surface water drainage system.
Other months in 2025
- January 2025 3
- February 2025 1
- April 2025 1
- May 2025 1
- July 2025 7
- August 2025 33
- September 2025 39
- October 2025 28
- November 2025 22
- December 2025 28