Planning application
North Haven Care Centre Brae Shetland ZE2 9TY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To install a new 86kVA rapid charger to serve two parking spaces at North Haven Care Centre supplied by a new dedicated electricity supply.
As published by the council, reference 2025/264/PPF
Application record
- Reference
- 2025/264/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Grant subject to conditions
- Received
- 10 Oct 2025
- Validated
- 16 Oct 2025
- Decided
- 9 Dec 2025
- Ward
- Delting
- Parish
- DELTING
- Decision by
- Delegated Decision
- Postcode
- ZE2 9TY
Timeline
Dates from the published record
-
10 Oct 2025
Received by Shetland Islands
-
16 Oct 2025
Validated
Checked as complete and ready for consideration.
-
9 Dec 2025
Decision issued: Grant subject to conditions
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
- BIODIVERSITY ENHANCEMENT PLAN
- REVISED SITE AND LOCATION PLAN
- DECISION NOTICE
- DELEGATED REPORT OF HANDLING
- COMMUNITY COUNCIL - COMMENTS
- ROADS - COMMENTS
- CONSULTATION RESPONSE - DRAINAGE
- SUPERSEDED SITE AND LOCATION PLAN
- APPLICATION PDF
- DATA SHEET
- SITE PHOTO
- SITE PHOTO
- SITE PHOTO
- SITE PHOTO
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 9 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1 Grindahoul Brae Shetland ZE2 9XS
Erect single storey extension to existing dwelling house and change of use of land to north west of dwelling house to land within domestic curtilage
Granted Full applications Extension 17 docsSmall domestic -
Brae High School Brae Shetland ZE2 9QJ
Screening Opinion in respect of proposed new school buildings with associated playground and sports facilities
Decided Outline 3 docs
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility