Planning application
Abon-Da-Bod Nesbister Whiteness Shetland ZE2 9LJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erect steel frame garage
As published by the council, reference 2025/276/PPF
Application record
- Reference
- 2025/276/PPF
- Type
- Planning Permission Full
- Status
- Decided
- Decision
- Grant subject to conditions
- Received
- 20 Oct 2025
- Validated
- 23 Oct 2025
- Decided
- 9 Jan 2026
- Ward
- Tingwall, Whiteness & Weisdale
- Parish
- TINGWALL, WHITENESS & WEISDALE
- Decision by
- Delegated Decision
- Postcode
- ZE2 9LJ
Site history
Applications at this address on the Shetland Islands register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
2025/276/DCON Granted
Abon-Da-Bod Nesbister Whiteness Shetland ZE2 9LJ
Application for consent, agreement or approval required by planning Condition: 04 (attenuation) of planning application 2025/276/PPF.
Timeline
Dates from the published record
-
20 Oct 2025
Received by Shetland Islands
-
23 Oct 2025
Validated
Checked as complete and ready for consideration.
-
9 Jan 2026
Decision issued: Grant subject to conditions
-
28 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
2025/276/DCON Granted
Abon-Da-Bod Nesbister Whiteness Shetland ZE2 9LJ
Application for consent, agreement or approval required by planning Condition: 04 (attenuation) of planning application 2025/276/PPF.
- Scottishbuildingwarrant: BW/2026/026 (Pending Consideration)
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
- DELEGATED REPORT OF HANDLING
- DISCHARGE OF CONDITION - APPROVED
- SOAKAWAY
- LOCATION PLAN
- EXISTING SITE PLAN
- ELEVATIONS
- EXTERNAL FINISHES
- PHOTO SITE LEVELS
- SHED SPEC
- DECISION NOTICE
- PROPOSED SITE PLAN
- CONFIRMATION OF EXTERNAL MATERIALS FROM APPLICANT
- COVER EMAIL FROM APPLICANT
- CONSULTATION RESPONSE - DRAINAGE
- ROADS - COMMENTS
- DRAIN/FLOOD - COMMENTS
- LOCATION PLAN
- PROPOSED SITE PLAN
- APPLICATION PDF
Trade members open them from here.
Open the documentsWhat this grant of permission means
Shetland Islands granted permission on 9 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Plot Nesbister Whiteness Shetland
Erection of 3no dwelling houses (to be used as holiday rental properties), formation of vehicular access, 1.2M boundary fence, associated landscaping and drainage works.
Granted Full applications 31 docsSeveral homes -
Sudragarth Nesbister Whiteness Shetland ZE2 9LJ
To site 1no. glamping pod with associated formation of new access, earthworks, soft and hard landscaping. Erection of workshop, surface water soakaway and foul drainage alterations.
Granted Full applications 23 docs -
Sudragarth Nesbister Whiteness Shetland ZE2 9LJ
Application for consent, agreement or approval required by planning Condition: 03 (Biodiversity) of planning application 2026/023/DCON.
Granted Conditions 4 docs -
Site North Of 'Kalna', Nesbister, Shetland.
Erection of one and a half storey 4 bed dwellinghouse with attached garage, ASHP, associated access and boundary fence.
Granted Full applications 21 docsSmall domestic
Other full applications
In Shetland Islands
-
2026/081/PPF Granted
The site is on the west side of the road into Challister, Whalsay, Shetland, ZE1 9AN
To construct a timber frame building to house an accessible toilet for public use and a storage room; install SUDS device; and carry out associated ground works.
-
2026/103/PPF Granted
Mossy Hill Wind Farm Lerwick Shetland
To construct a temporary access track approximately 210 meters in length to link Mossy Hill Windfarm with Staneyhill Quarry
-
2026/052/PPF Granted
Land To The East Of A970, Hill Of Wethersta, Shetland.
The erection of 2 no. wind turbines (each with a generating capacity of up to 5MW), with a maximum hub height of 67 metres and a maximum blade tip height of 107 metres, and erection of substation building and associated infrastructure.
-
2026/093/PPF Granted
Whirlie Sandwick Shetland ZE2 9HN
To construct Cabin with ASHP for family use only, create new car parking area; connect to existing septic tank; install surface water soakaway.
-
2026/116/PPF Granted
Cunningsburgh FC Changing Room Da Moors Cunningsburgh Shetland ZE2 9HB
7.4m x 4.7m extension to changing facility