Skip to content
PlanIndex Get alerts
Menu

Planning application

Voxter Outdoor Centre Voxter Brae Shetland ZE2 9QP

Granted Shetland Islands 2025/261/LBC Listed Building Consent

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

To replace existing single glazed timber sash and case windows with new timber sash and case units.

As published by the council, reference 2025/261/LBC

Application record

Reference
2025/261/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Grant subject to conditions
Received
8 Oct 2025
Validated
8 Oct 2025
Decided
12 Nov 2025
Ward
Delting
Parish
DELTING
Decision by
Delegated Decision
Postcode
ZE2 9QP

Site history

Applications at this address on the Shetland Islands register

This site has had 3 applications since 2025: 3 approved, 0 refused.

  • 2026/072/LBC Granted

    Voxter Outdoor Centre Voxter Brae Shetland ZE2 9QP

    Installation of lead flashings to roof skews. Localised like-for-like replacement of damaged slates

    Decided 13 Jul 2026 Heritage and listed buildings
  • 2025/315/PPF Granted

    Voxter Outdoor Centre Voxter Brae Shetland ZE2 9QP

    Replace failing septic tank with new treatment plant and partial soakaway.

    Decided 4 Mar 2026 Full applications

Timeline

Dates from the published record

  1. 8 Oct 2025

    Received by Shetland Islands

  2. 12 Nov 2025

    Decision issued: Grant subject to conditions

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • MATERIALS DETAILS Approved Detail · 13 Nov 2025
  • EXISTING ELEVATIONS Approved Plans · 13 Nov 2025
  • PROPOSED ELEVATIONS Approved Plans · 13 Nov 2025
  • LOCATION PLAN Approved Plans · 13 Nov 2025
  • DELEGATED REPORT OF HANDLING Delegated Report of Handling · 13 Nov 2025
  • LISTED BUILDING CONSENT Decision · 13 Nov 2025
  • HES - COMMENTS Consultee Comment · 10 Nov 2025
  • EDINBURGH GAZETTE - EIA ADVERT Advert · 17 Oct 2025
  • SHETLAND TIMES ADVERT Advert · 16 Oct 2025
  • WINDOW STRUCTURAL INSPECTION REPORT Supporting Documents · 08 Oct 2025
  • APPLICATION FORM Application Form · 08 Oct 2025
  • SUPPORTING STATEMENT WITH REASON FOR WINDOW REPLACEMENT Supporting Documents · 08 Oct 2025
  • OLD ELEVATION DRAWINGS NO CHANGE PROPOSED Superseded Drawing · 08 Oct 2025
  • SUPERSEDED REPLACEMENT WINDOW DETAILS Superseded Drawing · 08 Oct 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Shetland Islands granted permission on 12 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Shetland Islands

  • 2026/119/LBC Decided

    1 Veensgarth Gott Tingwall Shetland ZE2 9SB

    Replace all existing double glazed sash and case windows with Nordan triple glazed lookalike sash and case windows

    Received 3 Jun, published by the council 28 Jul 2026 Heritage and listed buildings
  • 2026/139/LBC Decided

    Bruce Hostel Twageos Road Lerwick Shetland ZE1 0BA

    Alterations to former hostel building including removal of chimneys, reinstatement of window opening on NW elevation, removal and replacement of harling, reconfiguration of internal layout to form 8no. flats, construction of roof over central courtyard, construction of new accessible entrance door, lift and fire/access stair, alterations to existing stairs, replacement doors and windows, demolition of block-built fire-stair extension & outbuilding stores / garage. Alteration and extension of former groundskeepers cottage to form one residential unit.

    Received 30 Jun, published by the council 28 Jul 2026 Heritage and listed buildings
  • 2026/166/LBC Awaiting decision

    Sandlodge Sandwick Shetland ZE2 9HP

    Works to dormer windows including removal of existing leadwork, replacement of timber sarking and structure with new treated timber, fitting new breather membrane and backing paper with necessary air gaps and fitting new lead with original lead roll in centre of roof, insulation to be fitted within the timber structure to roof and dormer sides and replacement of stone roof with lead roof.

    Received 13 Aug, published by the council 14 Aug 2026 Heritage and listed buildings
  • 2026/106/LBC Granted

    5 Annsbrae House Annsbrae Place Lerwick Shetland ZE1 0BP

    Strip existing roof, replace damaged structural roof timbers and natural roof slate covering.

    Received 26 May, published by the council 28 Jul 2026 Heritage and listed buildings
  • 2026/094/LBC Granted

    The Old Church Hall Mid Yell Yell Shetland ZE2 9BT

    Installation of 9no. PV panels to existing roof.

    Received 13 May, published by the council 28 Jul 2026 Heritage and listed buildings