Skip to content
PlanIndex Get alerts
Menu

Planning application

Fulham Gas Works Imperial Road London

Granted Hammersmith and Fulham 2025/00568/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

As published by the council, reference 2025/00568/LBC

Application record

Reference
2025/00568/LBC
Type
Listed Building Consent
Status
Granted As published: Decided: APPLICATION APPROVED
Decision
Granted As published: APPLICATION APPROVED
Received
28 Feb 2025
Validated
19 Mar 2025
Decided
23 Jul 2026
Ward
Sands End

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 118 applications since 2017: 39 approved, 0 refused.

  • P/2026/02356/NMAT Awaiting decision

    Fulham Gas Works Imperial Road London

    Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of the description of development to change it from "Planning Application (part-detailed, part-outline) for demolition of existing buildings and structures (excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings" to "Planning Application (part-detailed, part-outline) for demolition of selected existing buildings and structures and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings", specifically allowing the insertion of "selected" and the deletion of "(excl. No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Research Laboratory, 1920 WWI War Memorial and WW2 War Memorial)"

    Submitted 11 Sep 2026 Amendments
  • P/2026/02015/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 5 Aug 2026 Conditions
  • P/2026/01772/NMAT Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.

    Submitted 13 Jul 2026 Amendments
  • Fulham Gas Works Imperial Road London

    Details of paint finishes, in compliance with Condition 3 of Listed Building Consent (ref: 2025/00568/LBC) dated 23 July 2026.

    Decided 17 Sep 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Decided 21 Jul 2026 Conditions
  • P/2026/01890/VAR Awaiting decision

    Fulham Gas Works Imperial Road London

    Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more

    Submitted 15 May 2026 Amendments
  • P/2026/01214/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 6 May 2026 Conditions
  • Fulham Gas Works Imperial Road London

    Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1

    Decided 3 Jul 2026 Advertising
  • P/2026/01024/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).

    Submitted 16 Apr 2026 Conditions
  • P/2026/01008/DET Awaiting decision

    Fulham Gas Works,Imperial Road,London

    Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)

    Submitted 14 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 28 Feb 2025

    Received by Hammersmith and Fulham

  2. 19 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Decision issued: APPLICATION APPROVED

  4. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • Fulham Gas Works Imperial Road London

    Details of paint finishes, in compliance with Condition 3 of Listed Building Consent (ref: 2025/00568/LBC) dated 23 July 2026.

    Decided 17 Sep 2026 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

74 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 23 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Fulham Gas Works Imperial Road London

    2025/00651/FUL Submitted 7 Mar 2025 50 yards away

    Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

    Granted Full applications 73 docs
  • Gas Holder Imperial Road, London

    2025/00650/DET Submitted 7 Mar 2025 50 yards away

    Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Granted Conditions 51 docs
  • Fulham Gas Works Imperial Road London

    2025/00057/DET Submitted 10 Jan 2025 50 yards away

    95% historically approved · decision due ~12 Mar

    Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    2025/00056/DLBC Submitted 10 Jan 2025 50 yards away

    95% historically approved · decision due ~17 Mar

    Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.

    Awaiting decision Conditions 3 docs
  • Fulham Gas Works Imperial Road London

    2025/00058/DET Submitted 10 Jan 2025 50 yards away

    95% historically approved · decision due ~12 Mar

    Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Awaiting decision Conditions 3 docs
  • Fulham Gas Works Imperial Road London

    2026/00322/DET Submitted 6 Feb 2026 50 yards away

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89

    Granted Conditions 6 docs

In Hammersmith and Fulham

  • P/2026/02560/LBC Awaiting decision

    12 And 13 Hammersmith Terrace, London, W6 9TS

    Replacement of 3no. existing single glazed timber framed sash windows with new double glazed timber framed sash windows, to the rear elevation at second floor level (no.13); internal alterations to include: removal of modern cupboard/former WC to northern wall, construction of a partition wall and doorway with four-panelled timber door between hallway and front (northern) room, and removal of modern glazed door and surrounding plasterboard nibs between front and rear rooms at ground floor level; removal of partition wall between rear (southern) bedrooms at second floor level; and associated external and internal alterations (no.13).

    Received 1 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • The Grampians Shepherd'S Bush Road, London, W6 7LN

    Installation of approximately 120 metres of new telecommunications cabling between the internal network entry point and the existing rooftop telecommunications cabinet, including a new cable upturn, new internal and external trunking, one new drilled penetration through an external wall, utilisation of existing cable trays, existing roof penetration and termination within the existing Network Termination Point (NTP); associated internal and external alterations.

    Received 29 Jul, published by the council 9 Aug 2026 Heritage and listed buildings
  • P/2026/02505/LBC Awaiting decision

    Langford Primary School Gilstead Road, London, SW6 2LG

    Alterations to the Langford Primary School (Courtyard Building) to include; installation of new foul water connections, to include minor groundworks and small diameter service penetrations through external walls; installation of CCTV cameras and associated cabling and conduit; repairs to roof; repair of existing accessible toilet to include replacement of plywood floorboards, vinyl flooring, and wall plasterboard, and installation of new pipes/gully; repair of internal timber arches; repairs to damaged plasterboard; associated external and internal works.

    Received 11 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • P/2026/02507/LBC Awaiting decision

    The Glass House 11-12 Lettice Street, London, SW6 4EH

    External alterations to include; installation of 6no. rooflights in the rear roofslope and 2no. rooflights in the side roofslope; installation of 2no. air conditioning condenser units, and a like-for-like replacement of an existing timber framed window to the rear elevation at first floor level; internal alterations to include; creation of a mezzanine floor at second floor, reconfiguration of the existing floorspace at first floor level, incorporating the lowering of an existing mezzanine at first floor level and the addition of new internal stairs and walkways, including glazed partitions and screening, works to the existing roof structure to facilitate a thermal upgrade; associated internal and external alterations.

    Received 11 Sep, published by the council 6 Oct 2026 Heritage and listed buildings
  • Queen Adelaide, 412 Uxbridge Road, London, W12 0NR

    Replacement of existing projecting sign with new double sided externally illuminated projecting sign to southern elevation of the building; replacement of linolite lighting with warm white illumination (below 300 cd/m²), re-lamping of 3 lanterns (low luminance), retention of menu case and directional lighting, retention and repainting of boundary planters to southern elevation of the building; retention of menu case and directional lighting (to the corner elevation facing and Uxbridge Road and Adelaide Grove).

    Received 28 Apr, published by the council 24 Jul 2026 Heritage and listed buildings