Skip to content
PlanIndex Get alerts
Menu

Planning application

Riverside Worksite 27 Carnwath Road London

Awaiting decision Hammersmith and Fulham 2025/03325/TTT Thames Tideway Tunnel

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Use of land as a temporary vehicle storage facility and associated works for a period of 3 years.

As published by the council, reference 2025/03325/TTT

Application record

Reference
2025/03325/TTT
Type
Thames Tideway Tunnel
Status
Pending Consideration
Received
28 Nov 2025
Validated
1 Dec 2025
Ward
Palace And Hurlingham
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 28 Nov 2025

    Received by Hammersmith and Fulham

  2. 1 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 2025/03325/FUL Awaiting decision

    27 Carnwath Road, London, SW6 3HR

    Use of land as a temporary vehicle storage facility and associated works for a period of 3 years. (Please Note: Ignore previous Planning Ref: 2025/03325/TTT - USE Ref: 2025/03325/FUL IN ALL COMMUNICATIONS)

    Submitted 28 Nov 2025 Full applications

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,645 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham's median decision took 80 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Riverside Worksite Carnwath Road London

    2018/02633/TTTDR Submitted 31 Aug 2018 50 yards away

    Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) and CARRR2 of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Carnwath Road Riverside.

    Decided 6 docs
  • Riverside Worksite Carnwath Road London

    2018/03150/TTT Submitted 26 Sep 2018 50 yards away

    Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside

    Granted 10 docs
  • Riverside Worksite Carnwath Road London

    2019/00424/TTT Submitted 11 Feb 2019 50 yards away

    For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside

    Granted 3 docs
  • Riverside Worksite Carnwath Road, London

    2025/03333/TTTDET Submitted 28 Nov 2025 50 yards away

    Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 10 docs
  • Riverside Worksite Carnwath Road, London

    2025/02341/TTTDET Submitted 29 Aug 2025 50 yards away

    Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 4 docs
  • Riverside Worksite Carnwath Road London

    2018/02818/TTT Submitted 22 Aug 2018 50 yards away

    Partial discharge of Requirement PW6 and CARRR2 (Construction Logistics Plan) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) in regard to CoCP Part A Section 5.1.9, relating to the approval of the Phase 2 Worksite Construction Logistics Plan at Carnwath Road Riverside.CARRR C405CARRRPLNHAM071 V1 - CARRR6 CLP2 Addendum - Base Plug Pour - Cover Letter3170-BMBJV-CARRR-210-ZZ-EN-000001 REV P01 - CARRR Base Plug Pour - Logistics Pour Strategy Information

    Granted 9 docs