Planning application
Riverside Worksite Carnwath Road London
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) and CARRR2 of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Carnwath Road Riverside.
As published by the council, reference 2018/02633/TTTDR
Application record
- Reference
- 2018/02633/TTTDR
- Type
- Thames Tideway Tunnel Draft
- Status
- Opinion Issued
- Decision
- Opinion Issued
- Received
- 31 Aug 2018
- Validated
- 31 Aug 2018
- Decided
- 19 Sep 2018
- Ward
- Sands End
- Decision by
- Delegated Decision
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 7 applications since 2018: 6 approved, 0 refused.
-
2025/03333/TTTDET Granted
Riverside Worksite Carnwath Road, London
Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.
-
2025/02341/TTTDET Granted
Riverside Worksite Carnwath Road, London
Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.
-
2019/00424/TTT Granted
Riverside Worksite Carnwath Road London
For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside
-
2018/03150/TTT Granted
Riverside Worksite Carnwath Road London
Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside
-
2018/03174/TTT Granted
Riverside Worksite Carnwath Road London
Partial discharge of Schedule 3 Requirements PW6 and CARRR2 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Carnwath Road Riverside.
-
2018/02818/TTT Granted
Riverside Worksite Carnwath Road London
Partial discharge of Requirement PW6 and CARRR2 (Construction Logistics Plan) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) in regard to CoCP Part A Section 5.1.9, relating to the approval of the Phase 2 Worksite Construction Logistics Plan at Carnwath Road Riverside.CARRR C405CARRRPLNHAM071 V1 - CARRR6 CLP2 Addendum - Base Plug Pour - Cover Letter3170-BMBJV-CARRR-210-ZZ-EN-000001 REV P01 - CARRR Base Plug Pour - Logistics Pour Strategy Information
Timeline
Dates from the published record
-
31 Aug 2018
Received by Hammersmith and Fulham
-
19 Sep 2018
Decision issued: Opinion Issued
-
21 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Planning Consents Lead (West) Agent, a planning consultancy
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Hammersmith and Fulham has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Riverside Worksite Carnwath Road London
Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside
Granted 10 docs -
Riverside Worksite Carnwath Road London
For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside
Granted 3 docs -
Riverside Worksite 27 Carnwath Road London
96% historically approved · decision due ~26 Jan
Use of land as a temporary vehicle storage facility and associated works for a period of 3 years.
Awaiting decision 13 docs -
Riverside Worksite Carnwath Road, London
Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.
Granted Conditions 10 docs -
Riverside Worksite Carnwath Road, London
Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.
Granted Conditions 4 docs -
Riverside Worksite Carnwath Road London
Partial discharge of Requirement PW6 and CARRR2 (Construction Logistics Plan) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) in regard to CoCP Part A Section 5.1.9, relating to the approval of the Phase 2 Worksite Construction Logistics Plan at Carnwath Road Riverside.CARRR C405CARRRPLNHAM071 V1 - CARRR6 CLP2 Addendum - Base Plug Pour - Cover Letter3170-BMBJV-CARRR-210-ZZ-EN-000001 REV P01 - CARRR Base Plug Pour - Logistics Pour Strategy Information
Granted 9 docs