Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Carnwath Road, London, SW6 3HR

Awaiting decision Hammersmith and Fulham 2025/03325/FUL Full Planning Application

Relates to 2025/03325/TTT

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Use of land as a temporary vehicle storage facility and associated works for a period of 3 years. (Please Note: Ignore previous Planning Ref: 2025/03325/TTT - USE Ref: 2025/03325/FUL IN ALL COMMUNICATIONS)

As published by the council, reference 2025/03325/FUL

Application record

Reference
2025/03325/FUL
Type
Full Planning Application
Status
Pending As published: REGISTERED: Pending recommendation
Received
28 Nov 2025
Validated
2 Dec 2025
Ward
Palace And Hurlingham
Postcode
SW6 3HR

Timeline

Dates from the published record

  1. 28 Nov 2025

    Received by Hammersmith and Fulham

  2. 2 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2025/03325/TTT Awaiting decision

    Riverside Worksite 27 Carnwath Road London

    Use of land as a temporary vehicle storage facility and associated works for a period of 3 years.

    Submitted 28 Nov 2025

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided full applications in a median of 105 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Riverside Worksite Carnwath Road London

    2018/02633/TTTDR Submitted 31 Aug 2018 50 yards away

    Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) and CARRR2 of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Carnwath Road Riverside.

    Decided 6 docs
  • Riverside Worksite Carnwath Road London

    2018/03150/TTT Submitted 26 Sep 2018 50 yards away

    Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside

    Granted 10 docs
  • Riverside Worksite Carnwath Road London

    2019/00424/TTT Submitted 11 Feb 2019 50 yards away

    For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside

    Granted 3 docs
  • Riverside Worksite 27 Carnwath Road London

    2025/03325/TTT Submitted 28 Nov 2025 50 yards away

    96% historically approved · decision due ~26 Jan

    Use of land as a temporary vehicle storage facility and associated works for a period of 3 years.

    Awaiting decision 13 docs
  • Riverside Worksite Carnwath Road, London

    2025/03333/TTTDET Submitted 28 Nov 2025 100 yards away

    Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 10 docs
  • Riverside Worksite Carnwath Road, London

    2025/02341/TTTDET Submitted 29 Aug 2025 100 yards away

    Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 4 docs

In Hammersmith and Fulham

  • 6 Flat B First And Second Floors,Hetley Road,London,Hammersmith And Fulham,W12 8BB

    Raising of parapet wall and erection of steel posts and glass balustrades around the flat roof of the two storey rear back addition at second floor level, in connection with its use as a roof terrace; installation of French doors to replace the existing sash window at second floor level to the rear elevation.

    Received 17 Mar, published by the council 24 Jul 2026 Full applications
  • P/2026/02559/FUL Awaiting decision

    34 Oaklands Grove, London, W12 0JA

    Erection of a rear roof extension, involving an increase in the ridge height by 300mm, and including the installation of French doors and a Juliet balcony; erection of a single storey rear extension, to the side and rear of the existing back addition; installation of 2no. roof lights in the front roof slope; installation of French doors and a Juliet balcony to replace existing window to the rear elevation of the existing back addition at second floor level; formation of a roof terrace to the rear elevation at first floor level, enclosing part of the flat roof of the proposed single storey rear extension with a 1.7 metre high obscured glazed screen;

    Received 6 Oct, published by the council 11 Oct 2026 Full applications
  • Flat 1 Maisonette Basement And Ground Floor, 41 Addison Gardens, London, W14 0DP

    Erection of an external staircase to the rear elevation from upper ground to lower ground floor level; and installation of a French door following the removal of an existing window, to the rear elevation at upper ground floor level.

    Received 23 Jun, published by the council 24 Jul 2026 Full applications
  • 2026/00333/FUL Granted

    Flat B First And Second Floors, 6 Hetley Road, London, W12 8BB

    Replacement of 1no existing window with new double glazed timber framed windows at second floor level to the front and rear elevations; replacement of 1no existing single window and 1no bay window comprising of 3no window glazing with new double glazed timber framed windows to the front elevation, and replacement of 1no existing window with a new double glazed timber framed window to the rear elevation at first floor level.

    Received 7 Feb, published by the council 24 Jul 2026 Full applications
  • 74 Flat Ground Floor,Townmead Road,London,Hammersmith And Fulham,SW6 2RU

    Erection of a single storey rear extension, to the side and rear of the existing back addition following the demolition of existing conservatory at the rear of the property. Replace window on main rear wall at ground floor level with glazed door and Juliet balcony.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications