Planning application

Riverside Worksite Carnwath Road London

Granted Hammersmith and Fulham 2018/02818/TTT Thames Tideway Tunnel

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial discharge of Requirement PW6 and CARRR2 (Construction Logistics Plan) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) in regard to CoCP Part A Section 5.1.9, relating to the approval of the Phase 2 Worksite Construction Logistics Plan at Carnwath Road Riverside.CARRR C405CARRRPLNHAM071 V1 - CARRR6 CLP2 Addendum - Base Plug Pour - Cover Letter3170-BMBJV-CARRR-210-ZZ-EN-000001 REV P01 - CARRR Base Plug Pour - Logistics Pour Strategy Information

As published by the council, reference 2018/02818/TTT

Application record

Reference
2018/02818/TTT
Type
Thames Tideway Tunnel
Status
Application Approved
Decision
Granted As published: Application Approved
Received
22 Aug 2018
Validated
22 Aug 2018
Decided
30 Aug 2018
Ward
Sands End
Decision by
Delegated Decision

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 7 applications since 2018: 6 approved, 0 refused.

  • Riverside Worksite Carnwath Road, London

    Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Decided 18 Jun 2026 Conditions
  • Riverside Worksite Carnwath Road, London

    Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Decided 24 Oct 2025 Conditions
  • 2019/00424/TTT Granted

    Riverside Worksite Carnwath Road London

    For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside

    Decided 26 Feb 2019
  • 2018/03150/TTT Granted

    Riverside Worksite Carnwath Road London

    Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside

    Decided 31 Jan 2019
  • 2018/03174/TTT Granted

    Riverside Worksite Carnwath Road London

    Partial discharge of Schedule 3 Requirements PW6 and CARRR2 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Carnwath Road Riverside.

    Decided 17 Dec 2018
  • Riverside Worksite Carnwath Road London

    Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) and CARRR2 of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Carnwath Road Riverside.

    Decided 19 Sep 2018

Timeline

Dates from the published record

  1. 22 Aug 2018

    Received by Hammersmith and Fulham

  2. 30 Aug 2018

    Decision issued: Application Approved

  3. 21 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 30 August 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Riverside Worksite Carnwath Road, London

    2025/03333/TTTDET Submitted 28 Nov 2025 50 yards away

    Discharge of Schedule 3 Requirement CARRR3 - Contaminated Land - Part (3) - Verification Report - and Part (4) - Long Term Monitoring and Maintenance Plan at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 10 docs
  • Riverside Worksite Carnwath Road, London

    2025/02341/TTTDET Submitted 29 Aug 2025 50 yards away

    Partial discharge of Schedule 3 Requirement CARRR5 (Landscaping Works - Thames Path Planting) regarding the design relating to the permanent design at the worksite known as Carnwath Road Riverside as part of the Tideway Project.

    Granted Conditions 4 docs
  • Riverside Worksite Carnwath Road London

    2018/02633/TTTDR Submitted 31 Aug 2018 50 yards away

    Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) and CARRR2 of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Carnwath Road Riverside.

    Decided 6 docs
  • Riverside Worksite Carnwath Road London

    2018/03150/TTT Submitted 26 Sep 2018 50 yards away

    Partial discharge of Schedule 3 Requirements PW6 and CARRR2 relating to compliance with the Code of Construction Practice Part A Section 7.1.2 which requires the submission of an Air Quality Management Plan - Phase 2, at the worksite known as Carnwath Road Riverside

    Granted 10 docs
  • Riverside Worksite Carnwath Road London

    2019/00424/TTT Submitted 11 Feb 2019 50 yards away

    For Information - Requirement PW4 (Phasing) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the site specific phasing at Carnwath Road Riverside

    Granted 3 docs
  • Riverside Worksite 27 Carnwath Road London

    2025/03325/TTT Submitted 28 Nov 2025 50 yards away

    96% historically approved · decision due ~26 Jan

    Use of land as a temporary vehicle storage facility and associated works for a period of 3 years.

    Awaiting decision 13 docs