Planning application
Fulham Gas Works Imperial Road London
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to planning permission (ref: 2018/02100/COMB) dated 8 February 2019, to reconfigure the consented commercial floorspace at ground floor level to allow the provision of 2No. additional commercial units (6No. total commercial units) in respect of Phases 1b and 1c (Development Plots A2 and A3)
As published by the council, reference 2025/02962/NMAT
Application record
- Reference
- 2025/02962/NMAT
- Type
- Non-Material Amendment Submission
- Status
- Granted As published: Decided: APPLICATION APPROVED
- Decision
- Granted As published: APPLICATION APPROVED
- Received
- 23 Oct 2025
- Validated
- 29 Oct 2025
- Decided
- 17 Jul 2026
- Ward
- Sands End
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 112 applications since 2018: 33 approved, 0 refused.
-
P/2026/02015/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 62 (Road Safety Audit) for Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01772/NMAT Awaiting decision
Fulham Gas Works,Imperial Road,London
Non-Material Amendment to Planning Permission (ref: 2018/02100/COMB ) dated 8 February 2019 (as amended by ref: 2024/00961/VAR dated 3 December 2024), in respect of Condition 73 (details and materials). The proposed amendment being the requirement of a mock up to be provided remotely for review by officers rather than on site.
-
P/2026/01754/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details of paint finishes, in compliance with Condition 3 of Listed Building consent 2025/00568/LBC dated 23 July 2026.
-
P/2026/01473/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 20 (Verification Report) for Phases 3b, 3c and 3d (Development Plots E1 and E2) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01890/VAR Awaiting decision
Fulham Gas Works Imperial Road London
Variation of Condition 1 (Drawings) of reserved matters details relating to the approval of access; appearance; landscaping; layout and scale in respect of Phases 4b, 4c and 4d (Development Plots H1 and H2); for the erection of two buildings comprising residential and non-residential floorspace with associated landscaping approved under 2024/01420/RES granted 17 January 2025 of planning permission 2018/02100/COMB granted 8 February 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). As varied by 2024/00961/VAR variation of Condition 4 (Drawings) and Condition 5 (Design Codes and Parameter Plans) of planning permission 2018/02100/COMB granted 8 Feb 2019 (as amended by refs 2020/01088/NMAT and 2024/00818/NMAT). The proposed amendments to Phase 4b Development Plot H1 comprise: (a) revisions to tower and shoulder terrace heights within consented maximum parameter heights (comprising an increase in shoulder height and reduction in tower height); (b) changes to the arrangemen... read more
-
P/2026/01214/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 16 (Preliminary Risk Assessment) for Development Phases 3a, 4a, 5a, 5b and 6 pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01125/ADV Granted
Fulham Gas Works Imperial Road London
Display of 1no. internally illuminated fascia sign and 2no. non-illuminated projecting signs to Unit 4a, phase 1
-
P/2026/01024/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 87 (Materials) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
-
P/2026/01008/DET Awaiting decision
Fulham Gas Works,Imperial Road,London
Details to discharge Condition 74 (1:20 details) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024)
-
P/2026/01009/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 89 (Secured by Design - Ground Level) for development Development Plot H1 (Phase 4b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024).
Timeline
Dates from the published record
-
23 Oct 2025
Received by Hammersmith and Fulham
-
29 Oct 2025
Validated
Checked as complete and ready for consideration.
-
17 Jul 2026
Decision issued: APPLICATION APPROVED
-
25 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 17 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fulham Gas Works Imperial Road London
Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.
Granted Full applications 73 docs -
Gas Holder Imperial Road, London
Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Granted Conditions 51 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~12 Mar
Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Awaiting decision Conditions 4 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~17 Mar
Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.
Awaiting decision Conditions 3 docs -
Fulham Gas Works Imperial Road London
95% historically approved · decision due ~12 Mar
Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
Awaiting decision Conditions 3 docs -
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89
Granted Conditions 6 docs
Other amendment applications
In Hammersmith and Fulham
-
P/2026/02105/NMAT Granted
26 Sedlescombe Road, London, SW6 1RD
Non-material amendment to planning permission ref:2026/00143/FUL granted 10th April 2026 for the 'Erection of a single storey rear extension, to the side and rear of the existing back addition following partial demolition of the lower ground floor back addition; demolition of the existing chimney stack above the roof of first floor rear back addition; replacement of existing uPVC framed windows with new double glazed timber framed windows at first floor level to the side and rear elevations'. Amendments sought to allow the extension walls to be constructed with London Yellow stock instead of red bricks as approved in the consent 2026/00143/FUL
-
P/2026/00738/VAR Granted
58 And 60 Ravenscourt Gardens London W6 0TU
Variation of Condition 2 (approved drawings) of the planning permission reference: 2025/00506/FUL dated 12th September 2025 for the "Erection of a rear extension at first floor level on top of the existing back addition, and installation of a window to the side elevation at first floor level to nos.58 and 60; demolition of existing conservatory and erection of a replacement single storey lean-to rear extension to the side of existing back addition to no.60; associated alterations." Amendment sought to extend the proposed single storey lean-to rear extension to the side of existing back addition to no.60.
-
P/2026/02358/NMAT Awaiting decision
13 Ashington Road, London, SW6 3QJ
Non-material amendment to planning permission reference: 2023/01734/FUL dated 26th September 2023 for the "Erection of a rear extension at second floor level, over part of the existing back addition; installation of a rooflight, on top of the main flat roof at roof level; installation of a new window following the removal of existing, to the rear elevation of existing rear roof extension." Amendments sought to include; removal and infilling of 1no. existing window at second-floor level to the rear elevation; addition of 1no. new double-glazed timber sash window at second-floor level to the rear elevation, aligned with the existing window below; omission of 1no. approved window from the rear elevation; re-sizing and repositioning of 1no. approved rooflight on the main flat roof; addition of 1no. rooflight to the main flat roof; and omission of 1no. approved rooflight from the pod flat roof.
-
P/2026/01466/NMAT Granted
12 Flat A Basement,Coverdale Road,London,Hammersmith And Fulham,W12 8JL
Non-material amendment to planning permission ref: 2024/01570/FUL granted 21st August 2024 for the 'Erection of a single storey rear extension to the side of the existing back addition; installation of a new window to replace the existing door at lower ground floor level to the rear elevation' to allow amendments to the rear elevation of the lower ground floor extension to include the installation of timber framed double glazed French doors in place of aluminium framed bi-folding doors to the rear of kitchen, the installation of a timber framed double glazed single door in place of the window to the rear of bedroom 2 and the omission of parapet to north/ side elevation (revised description).
-
P/2026/02099/NMAT Granted
95 Flat Second Floor,Edith Road,London,Hammersmith And Fulham,W14 0TJ
Non-material amendment to planning permission ref: 2021/03989/FUL granted 14th April 2023 for the 'Replacement of the existing metal railings on the rear-side elevations with 1.7m high obscure-glazed screening; upgrading the existing metal railings on the rear elevation to increase the height to 1.1m from the new floor level at second floor level; and the installation of new timber decking to the existing second floor roof terrace' to allow amendments to the approved drawings to include: retention and upgrading the existing metal balustrades with the previously approved 1.7m high obscure-glazed screening to be installed behind the retained balustrades.