Details to partially discharge Condition 75 (shopfronts) of Unit 4, Phases 1b and 1c (Development Plots A2 and A3), of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

As published by the council, reference 2025/02287/DET

Timeline

Dates from the published record

  1. 22 Aug 2025

    Received by Hammersmith and Fulham

  2. 28 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jun 2026

    Decision issued: APPLICATION APPROVED

  4. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 2025/00651/FUL Granted

    Fulham Gas Works Imperial Road London

    Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

    7 Mar 2025 0m away Full applications
  • 2025/00650/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    7 Mar 2025 0m away Conditions
  • 2025/00057/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    10 Jan 2025 0m away Conditions
  • 2025/00056/DLBC Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.

    10 Jan 2025 0m away Conditions
  • 2025/00058/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    10 Jan 2025 0m away Conditions
  • 2026/00322/DET Granted

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89

    6 Feb 2026 0m away Conditions

In Hammersmith and Fulham

  • P/2026/01938/DET Awaiting decision

    421 A North End Road,London,Hammersmith And Fulham,SW6 1NY

    Submission of details of full postal address pursuant to condition 9; parking permit scheme pursuant to condition 11; water efficient appliances pursuant to condition 13; mechanical ventilation system pursuant to condition 14; Ultra Low Nox Gas fired boilers to be provided for space heating and domestic hot water pursuant to condition 15; construction logistics plan pursuant to condition 17 of planning permission ref: 2017/03185/FUL granted 19th October 2017.

    29 Jul 2026 Conditions
  • Former Bbc Television Centre Wood Lane, London

    Details to discharge Condition 58 ( Car Parking Management Plan ) for Plot E & G1, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.

    30 Apr 2026 Conditions
  • P/2026/01913/DET Awaiting decision

    11 Farm Lane, London, SW6 1PU

    Submission of details of the installation/commissioning reports of the Zero Emission MCS certified Air Source Heat Pumps to be provided for space heating and hot water for the thirty-one self-contained residential units, pursuant to Condition 18 of planning permission reference: 2022/03329/FR3 dated 19th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01912/DET Awaiting decision

    43 Brook Green, London, W6 7EF

    Submission of details of a post construction BREEAM assessment pursuant to condition 35 of planning permission ref: 2022/00949/FUL granted 13th July 2023.

    27 Jul 2026 Conditions
  • P/2026/01906/DET Awaiting decision

    156 Munster Road, London, SW6 5RA

    Submission of details of details of the following external facing materials (including manufacturer's specifications, photographs) pursuant to condition 3; preliminary risk assessment report pursuant to condition 10; site investigation scheme pursuant to condition 11; quantitative risk assessment report pursuant to condition 12; remediation method statement pursuant to condition 13; verification report pursuant to condition 14; onward long-term monitoring methodology report pursuant to condition 15; enhanced sound insulation value DnT,w + Ctr L'nT,w of at least 10dB above the Building Regulations value, for the floor/ceil-ing /wall structures separating different types of rooms/ uses in adjoining dwellings, namely [eg. living room and kitchen above bedroom of separate dwelling] pursuant to condition 16; sound insulation of the floor/ ceiling/walls separating the commercial parts of the premises from dwellings pursuant to condition 17; detailed Demolition and Construction Logistics Plan... read more

    25 Jul 2026 Conditions