Planning application
2025/02148/FUL
Fulham Gas Works Imperial Road London
Proposal
Construction of a Ring Main Unit enclosure to facilitate the Fulham Gasworks redevelopment and other associated works.
As published by the council, reference 2025/02148/FUL
Timeline
Dates from the published record
-
6 Aug 2025
Received by Hammersmith and Fulham
-
19 Aug 2025
Validated
Checked as complete and ready for consideration.
-
3 Jul 2026
Decision issued: APPLICATION APPROVED
-
25 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/00651/FUL Granted
Fulham Gas Works Imperial Road London
Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.
-
2025/00650/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
-
2025/00057/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
-
2025/00056/DLBC Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.
-
2025/00058/DET Awaiting decision
Fulham Gas Works Imperial Road London
Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).
-
2026/00322/DET Granted
Fulham Gas Works Imperial Road London
Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89
Other full applications applications
In Hammersmith and Fulham
-
P/2026/01929/FUL Awaiting decision
Peabody Estate Blocks J-R Fulham Palace Road London W6 9QQ
Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.
-
P/2026/01410/FUL Granted
770 Fulham Road, London, SW6 5SJ
Erection of a 1.7 metre high obscured glazed screen around part of the flat roof of the existing single storey rear extension, in connection with the creation of a roof terrace.
-
2025/01323/FUL Refused
Pavement Adjacent To 1 Hammersmith Broadway London W6 9DL
Installation of a "Pulse Smart Hub" consisting of a free-standing structure featuring a fully accessible interactive tablet along with integrated digital display screens on two sides and emergency functionality including provision of defibrillators.
-
P/2026/01915/FUL Awaiting decision
Peabody Estate, Block S, T And U Fulham Palace Road London W6 9QY
Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.
-
P/2026/01907/FUL Awaiting decision
47, Kings Court Hamlet Gardens, London, W6 0RN
Replacement of 3no. existing single glazed Crittall steel windows with new double glazed Crittall steel windows, to the side elevation at second floor level (Flat 47).