2025/02148/FUL

Fulham Gas Works Imperial Road London

Granted Hammersmith and Fulham Full Planning Application

Proposal

Construction of a Ring Main Unit enclosure to facilitate the Fulham Gasworks redevelopment and other associated works.

As published by the council, reference 2025/02148/FUL

Timeline

Dates from the published record

  1. 6 Aug 2025

    Received by Hammersmith and Fulham

  2. 19 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jul 2026

    Decision issued: APPLICATION APPROVED

  4. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/00651/FUL Granted

    Fulham Gas Works Imperial Road London

    Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

    7 Mar 2025 0m away Full applications
  • 2025/00650/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    7 Mar 2025 0m away Conditions
  • 2025/00057/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    10 Jan 2025 0m away Conditions
  • 2025/00056/DLBC Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.

    10 Jan 2025 0m away Conditions
  • 2025/00058/DET Awaiting decision

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    10 Jan 2025 0m away Conditions
  • 2026/00322/DET Granted

    Fulham Gas Works Imperial Road London

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89

    6 Feb 2026 0m away Conditions

In Hammersmith and Fulham

  • P/2026/01929/FUL Awaiting decision

    Peabody Estate Blocks J-R Fulham Palace Road London W6 9QQ

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    29 Jul 2026 Full applications
  • 770 Fulham Road, London, SW6 5SJ

    Erection of a 1.7 metre high obscured glazed screen around part of the flat roof of the existing single storey rear extension, in connection with the creation of a roof terrace.

    1 Jun 2026 Full applications
  • 2025/01323/FUL Refused

    Pavement Adjacent To 1 Hammersmith Broadway London W6 9DL

    Installation of a "Pulse Smart Hub" consisting of a free-standing structure featuring a fully accessible interactive tablet along with integrated digital display screens on two sides and emergency functionality including provision of defibrillators.

    13 May 2025 Full applications
  • P/2026/01915/FUL Awaiting decision

    Peabody Estate, Block S, T And U Fulham Palace Road London W6 9QY

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    27 Jul 2026 Full applications
  • P/2026/01907/FUL Awaiting decision

    47, Kings Court Hamlet Gardens, London, W6 0RN

    Replacement of 3no. existing single glazed Crittall steel windows with new double glazed Crittall steel windows, to the side elevation at second floor level (Flat 47).

    26 Jul 2026 Full applications