Planning application
Hammersmith Pumping Station Chancellors Road London W6 9RR
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of an electrical equipment kiosk at the Hammersmith Pumping Station worksite.
As published by the council, reference 2020/03124/FUL
Application record
- Reference
- 2020/03124/FUL
- Type
- Full Detailed Planning Application
- Status
- Pending Decision
- Received
- 26 Nov 2020
- Validated
- 27 Nov 2020
- Ward
- Fulham Reach
- Decision by
- Delegated Decision
- Postcode
- W6 9RR
Timeline
Dates from the published record
-
26 Nov 2020
Received by Hammersmith and Fulham
-
27 Nov 2020
Validated
Checked as complete and ready for consideration.
-
15 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 January 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
16 Holland House,Parr's Way,London,Hammersmith And Fulham,W6 9YJ
93% historically approved · decision due ~11 Sep
Display of 1no internally illuminated fascia lettering sign, 1no internally illuminated penguin logo sign and 1no. non-illuminated vinyl applied to shopfront glazing to western elevation of the building; display of 1no internally illuminated penguin logo sign to northern elevation of the building.
Awaiting decision Advertising Windows or glazing 16 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements HAMPS 6 (Specification of Access) & 8 (Detailed Design) and Full discharge of Schedule 3 Requirements HAMPS 7 (Surface Water Drainage) & 9 (Heritage Interpretation), at the worksite known as Hammersmith Pumping Station.
Granted 21 docs -
58 Chancellors Road London W6 9RS
97% historically approved · decision due ~21 Apr
rear garden Sycamore to be reduced
Awaiting decision Trees 3 docs -
60 Chancellors Road London W6 9RS
97% historically approved · decision due ~21 Apr
rear garden: 2 no. fully grown sycamore trees to be felled. (walnut, 2no. holly and laurel retained)
Awaiting decision Trees 3 docs -
54 Chancellors Road, London, W6 9RS
90% historically approved · decision due ~2 Oct
Replacement of existing timber framed double glazed folding doors with new timber framed double glazed bi-folding doors, to the rear elevation at lower ground floor level.
Awaiting decision Lawful development Windows or glazing 7 docs -
Hammersmith Embankment Site Known As 'Fulham Reach' Land Bounded By Chancellor's Road, Distillery Road And Winslow Road, Including Sections Of Thames Path, River Thames, Frank Banfield Park And Highway Land London W6
Change of use of the ground floor of Building H from retail (Class E) into 1 x studio, 1 x 1 bedroom and 4 x 2 bedroom self-contained flats (Class C3); formation of garden terraces with privacy screens, associated landscaping and external alterations.
Withdrawn Full applications New dwelling 24 docs
Other full applications applications
In Hammersmith and Fulham
-
P/2026/01173/FUL Granted
343 Fulham Palace Road, London, SW6 6TD
Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.
-
P/2026/01729/FR3 Granted
24-26 Matheson Road, London, W14 8SW
Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.
-
P/2026/01645/FUL Granted
10 Cathnor Road, London, W12 9JA
Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.
-
P/2026/01106/FUL Granted
44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS
Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.
-
P/2026/01614/FUL Granted
59A Chesson Road, London, W14 9QT
Erection of an additional floor at roof level.