Planning application
Hammersmith Pumping Station Chancellors Road London W6 9RR
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Draft submission for the discharge of Requirement HAMPS 6, 7, 8 & 9 relating to the Specification of accesses (operational), Surface water drainage, Detailed design approval for permanent above ground structures and Heritage interpretation.
As published by the council, reference 2018/03465/TTTDR
Application record
- Reference
- 2018/03465/TTTDR
- Type
- Thames Tideway Tunnel Draft
- Status
- Opinion Issued
- Decision
- Opinion Issued
- Received
- 23 Oct 2018
- Validated
- 23 Oct 2018
- Decided
- 30 Nov 2018
- Ward
- Fulham Reach
- Decision by
- Delegated Decision
- Postcode
- W6 9RR
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 6 applications since 2018: 3 approved, 0 refused.
-
2020/03124/FUL Awaiting decision
Hammersmith Pumping Station Chancellors Road London W6 9RR
Erection of an electrical equipment kiosk at the Hammersmith Pumping Station worksite.
-
2019/00445/TTT Granted
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements HAMPS 6 (Specification of Access) & 8 (Detailed Design) and Full discharge of Schedule 3 Requirements HAMPS 7 (Surface Water Drainage) & 9 (Heritage Interpretation), at the worksite known as Hammersmith Pumping Station.
-
2018/03208/TTT Granted
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Air Quality Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 7.1.2, at the worksite known as Hammersmith Pumping Station.
-
2018/03156/TTT Granted
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Hammersmith Pumping Station.
-
2018/02629/TTTDR Decided
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Hammersmith Pumping Station.
Timeline
Dates from the published record
-
23 Oct 2018
Received by Hammersmith and Fulham
-
30 Nov 2018
Decision issued: Opinion Issued
-
21 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Planning Consents Lead (West) Agent, a planning consultancy
3 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Hammersmith and Fulham has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Air Quality Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 7.1.2, at the worksite known as Hammersmith Pumping Station.
Granted 5 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Hammersmith Pumping Station.
Granted 7 docs -
Riverside Worksite Carnwath Road London
Partial discharge of Schedule 3 Requirements PW6 and CARRR2 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Carnwath Road Riverside.
Granted 4 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Hammersmith Pumping Station.
Decided 4 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
98% historically approved · decision due ~22 Jan
Erection of an electrical equipment kiosk at the Hammersmith Pumping Station worksite.
Awaiting decision Full applications 30 docs -
Carnwath Road Riverside Worksite London SW6
Partial discharge of the Schedule 3 Requirements CARRR 9 (Specification of accesses (operational)) and the FULL discharge of CARRR 1 (Detailed design approval for permanent above ground structures), CARRR 5 (Landscaping works), CARRR 10 (Surface water drainage) and CARRR 11(Lighting (Operational)).
Decided 63 docs