Planning application
Hammersmith Pumping Station Chancellors Road London W6 9RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Hammersmith Pumping Station.
As published by the council, reference 2018/03156/TTT
Application record
- Reference
- 2018/03156/TTT
- Type
- Thames Tideway Tunnel
- Status
- Application Approved
- Decision
- Granted As published: Application Approved
- Received
- 26 Sep 2018
- Validated
- 26 Sep 2018
- Decided
- 17 Dec 2018
- Ward
- Fulham Reach
- Decision by
- Delegated Decision
- Postcode
- W6 9RR
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 6 applications since 2018: 3 approved, 0 refused.
-
2020/03124/FUL Awaiting decision
Hammersmith Pumping Station Chancellors Road London W6 9RR
Erection of an electrical equipment kiosk at the Hammersmith Pumping Station worksite.
-
2019/00445/TTT Granted
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements HAMPS 6 (Specification of Access) & 8 (Detailed Design) and Full discharge of Schedule 3 Requirements HAMPS 7 (Surface Water Drainage) & 9 (Heritage Interpretation), at the worksite known as Hammersmith Pumping Station.
-
2018/03465/TTTDR Decided
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the discharge of Requirement HAMPS 6, 7, 8 & 9 relating to the Specification of accesses (operational), Surface water drainage, Detailed design approval for permanent above ground structures and Heritage interpretation.
-
2018/03208/TTT Granted
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Air Quality Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 7.1.2, at the worksite known as Hammersmith Pumping Station.
-
2018/02629/TTTDR Decided
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Hammersmith Pumping Station.
Timeline
Dates from the published record
-
26 Sep 2018
Received by Hammersmith and Fulham
-
17 Dec 2018
Decision issued: Application Approved
-
21 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 17 December 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hammersmith Pumping Station Chancellors Road London W6 9RR
Partial discharge of Schedule 3 Requirements PW6 and HAMPS1 (Air Quality Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 7.1.2, at the worksite known as Hammersmith Pumping Station.
Granted 5 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the discharge of Requirement HAMPS 6, 7, 8 & 9 relating to the Specification of accesses (operational), Surface water drainage, Detailed design approval for permanent above ground structures and Heritage interpretation.
Decided 28 docs -
Riverside Worksite Carnwath Road London
Partial discharge of Schedule 3 Requirements PW6 and CARRR2 (Noise and Vibration Management Plan - Phase 2) relating to compliance with the Code of Construction Practice Part A Section 6, at the worksite known as Carnwath Road Riverside.
Granted 4 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
Draft submission for the partial discharge of Requirement PW6 (Code of Construction Practice Part A) of Schedule 3 of the Thames Water Utilities Ltd (Thames Tideway Tunnel) Order 2014 (as amended) relating to the approval of the Noise and Vibration Management Plan at Hammersmith Pumping Station.
Decided 4 docs -
Hammersmith Pumping Station Chancellors Road London W6 9RR
98% historically approved · decision due ~22 Jan
Erection of an electrical equipment kiosk at the Hammersmith Pumping Station worksite.
Awaiting decision Full applications 30 docs -
Carnwath Road Riverside Worksite London SW6
Partial discharge of the Schedule 3 Requirements CARRR 9 (Specification of accesses (operational)) and the FULL discharge of CARRR 1 (Detailed design approval for permanent above ground structures), CARRR 5 (Landscaping works), CARRR 10 (Surface water drainage) and CARRR 11(Lighting (Operational)).
Decided 63 docs