Fulham Gasworks Imperial Road London

Granted Hammersmith and Fulham 2019/01064/DET Details to Meet Conditions Full/Outline

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details submitted to discharge Condition 14 (Demolition Logistic Plan) and Condition 15 (Demolition Environmental Management Plan) for Phases 1, 2, 3, 4, 5 and 6 of planning permission 2018/02100/COMB dated 8th February 2019.

As published by the council, reference 2019/01064/DET

Application record

Reference
2019/01064/DET
Type
Details to Meet Conditions Full/Outline
Status
Decided: APPLICATION APPROVED
Decision
APPLICATION APPROVED
Received
5 Apr 2019
Validated
23 Apr 2019
Decided
3 Jul 2019
Ward
Parsons Green And Walham

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 16 applications since 2019: 8 approved, 0 refused.

  • 2020/01850/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of temporary fencing and/or enclosure, in compliance with Condition 8 of planning permission (ref. 2018/02100/COMB) dated 8 February 2019.

    Submitted 20 Jul 2020 Conditions
  • 2020/01185/ADV Awaiting decision

    Fulham Gasworks Imperial Road London

    Display of externally illuminated advertisement on dibond panels; affixed to hoardings along Michael Road, Sands End Lane.

    Submitted 12 May 2020 Advertising
  • 2020/01088/NMAT Awaiting decision

    Fulham Gasworks Imperial Road London

    Non-material amendment to permission 2018/02100/COMB, 8 Feb 2019, to remove figures / unit numbers from description; amend ground floor of Phases 1a 1b 1c; amend Condition 10 (Floorspace) to increase ancillary residential by 1,622 sqm to 3,420 sqm and reduce D1/D2 use by 1,622 sqm to 2,710 sqm. Planning Application for demolition of existing buildings and structures (excluding No.2 Gasholder, 1856 Chief Engineer's Office, 1927 Former Research Laboratory, 1920 WW1 War Memorial and WW2 War Memorial) and redevelopment to provide a residential-led mixed use development comprising the erection of new buildings ranging from 1 to 37 storeys to provide residential units and ancillary residential facilities (C3 Use) and non-residential floorspace in Use Classes A1, A2, A3, A4, B1, D1 and D2, the provision of a new publicly accessible open space, new pedestrian and vehicle routes, accesses and amenity areas, basement level car park with integral servicing areas, interim works and other associated works: 1) Detailed planning application for residential floorspace together with ancillary residential facilities (C3 Use); flexible commercial floorspace (A1, A2, A3, A4 Uses); community and leisure floorspace (D1/D2 Use); provision of a basement; new pedestrian and vehicular access; provision of amenity space, landscaping, car/cycle parking, refuse storage, energy centre, servicing area, and other associated infrastructure works.2) Outline planning application (with all matters reserved) for residential floorspace and ancillary residential facilities (C3 Use); non-residential floorspace comprising flexible commercial retail (A1, A2, A3, A4 Uses), office (B1 Use), community (D1 Use) and leisure (D2 Use) floorspace; provision of new basement level; new pedestrian and vehicular access; and associated amenity space, publicly accessible open space, landscaping, car/cycle parking, refuse storage, energy centres, servicing area, and other associated infrastructure works.

    Submitted 30 Apr 2020 Amendments
  • 2020/00523/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of green infrastructure - air quality, in compliance with condition 46 in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 Febraury 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00524/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details to discharge condition 33 (green/brown/blue roofs); condition 61 (roads, footways, footpaths and cycleways); condition 81 (urban greening strategy); condition 90 (floodlights, security lights and decorative external lights); condition 92 (soft and hard landscaping); condition 96 (outdoor play spaces) and condition 102 (urban realm strategy) in relation to Development Plots A1, A2, and A3 (Phases 1a, 1b, and 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00525/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of ventilation strategy, in compliance with condition 42 (a) & (b); details of combustion plant, in compliance with condition 45 (a) & (b) in relation to Development Plots A1, A2 & A3 (Phase 1a, 1b & 1c) of planning permission 2018/02100/COMB dated 8 February 2019.

    Submitted 21 Feb 2020 Conditions
  • 2020/00184/LBC Awaiting decision

    Fulham Gasworks Imperial Road London

    Proposed works to Gasholder No.2 (Grade II* listed) located within Phase 4a of planning permission 2018/02100/COMB granted 8 February 2019. Works would comprise of intrusive works to facilitate access to de-water, remove sludge, decontaminate, investigate, assess and record the condition of Gasholder No.2.

    Submitted 22 Jan 2020 Heritage and listed buildings
  • 2019/03747/DET Awaiting decision

    Fulham Gasworks Imperial Road London

    Details of Intrusive Condition Survey Methodology, in compliance with condition 104 dated 8 February 2019.

    Submitted 17 Dec 2019 Conditions
  • 2019/01070/DET Granted

    Fulham Gasworks Imperial Road London

    Details of Air Quality Dust Management Plan (AQDMP); in compliance with condition 44 for Phase 0 (Site Wide Demolition) and Phases 1a, 1b, 1c, 2a and 2b; of planning permission (ref: 2018/02100/COMB) dated 8th February 2019.

    Decided 11 Jul 2019 Conditions
  • 2019/01069/DET Granted

    Fulham Gasworks Imperial Road London

    Details of Demolition, Ground and Enabling Works, in compliance with condition 7 of planning permission 2018/02100/COMB dated 8th February 2019.

    Decided 14 May 2019 Conditions

Timeline

Dates from the published record

  1. 5 Apr 2019

    Received by Hammersmith and Fulham

  2. 23 Apr 2019

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jul 2019

    Decision issued: APPLICATION APPROVED

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 3 July 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Fulham Gas Works Imperial Road London

    2025/00651/FUL Submitted 7 Mar 2025 0m away

    Works to Gasholder No.2 comprising: (i) bell and tank wall stabilisation works including concrete pours; (ii) the recording of the existing structure, the dismantling and off-site refurbishment and restoration of part of the existing structure, (iii) the permanent removal of roof sheeting, metal tank walls and infilling of existing void, (iv) the incorporation of replacement components where the original components are degraded beyond repair, and (v) the repainting and erection of the restored and replacement components of the gasholder in a new configuration with required alterations to facilitate the use of the salvaged elements of the gasholder as an integrated feature of the wider landscaped park, including introduction of a water feature and new seating and other associated works.

    Granted Full applications 73 docs
  • Fulham Gas Works Imperial Road London

    2025/00650/DET Submitted 7 Mar 2025 0m away

    95% historically approved · decision due ~6 May

    Details to discharge Condition 105 (Gasholder No.2 Proposals) of Planning Permission (ref. 2018/02100/COMB) dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Awaiting decision Conditions 49 docs
  • Fulham Gas Works Imperial Road London

    2025/00057/DET Submitted 10 Jan 2025 0m away

    95% historically approved · decision due ~12 Mar

    Details to discharge Condition 73 (Details and Materials); Condition 74 (1:20 details) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Awaiting decision Conditions 4 docs
  • Fulham Gas Works Imperial Road London

    2025/00056/DLBC Submitted 10 Jan 2025 0m away

    95% historically approved · decision due ~17 Mar

    Details to discharge Condition 3 (Method Statement) and Condition 4 (External Materials) of Listed Building Consent 2023/01147/LBC dated 30 May 2024.

    Awaiting decision Conditions 3 docs
  • Fulham Gas Works Imperial Road London

    2025/00058/DET Submitted 10 Jan 2025 0m away

    95% historically approved · decision due ~12 Mar

    Details to discharge Condition 82 (Roof Enclosure) in relation to Phases 3e, 3f of Development Plots G1 of Planning Permission 2018/02100/COMB dated 8 February 2019 (as amended by 2024/00961/VAR dated 3 December 2024).

    Awaiting decision Conditions 3 docs
  • Fulham Gas Works Imperial Road London

    2026/00322/DET Submitted 6 Feb 2026 0m away

    Details to discharge Condition 88 (Secure by Design (Basement)) and Condition 89 (Secure By Design (Above Ground)) for development Development Plot E1 (Phase 3b) pursuant to Planning Permission (ref: 2018/02100/COMB) dated 8 February 2019 as varied by (ref: 2024/00961/VAR dated 23 December 2024). KRP - Phase 3 - Block E1 - Planning Note C88 and C89

    Granted Conditions 6 docs

In Hammersmith and Fulham

  • 25 St Peter'S Square, London, W6 9NW

    Submission of details of Full details, including photographs of physical samples, of materials to be used on the external surfaces of the building, boundary walls and ground surfaces pursuant to condition 3 of planning application ref: 2025/02038/LBC granted 2nd July 2026.

    3 Jul 2026 Conditions
  • 517-523 Fulham Road, London, SW6 1HD

    Submission of details pursuant to Condition 7 (Anti-Vibration) of the planning permission reference: 2024/02201/FUL dated 24th September 2025.

    18 Jun 2026 Conditions
  • 3 Shortlands, London, W6 8DA

    Submission of details of secured by design pursuant to condition 31 of planning permission ref: 2025/01723/FUL granted 1st July 2026.

    7 Jul 2026 Conditions
  • 11 Farm Lane, London, SW6 1PU

    Submission of details of a post installation compliance report of the approved ventilation strategy, pursuant to Condition 17 of the planning permission reference: 2022/03329/FR3 dated 19th July 2023.

    6 Jul 2026 Conditions
  • 20 Avonmore Road, London, W14 8RR

    Submission of details on the use of tall plant/scaffolding, in consultation with TFL Infrastructure Protection, pursuant to Condition 19 of planning permission reference: 2024/01752/FUL dated 10th December 2025.

    22 Jun 2026 Conditions