Planning application
EPF/0934/25
Peacocks Cottage, Epping Long Green, Epping Upland, Epping, CM16 6QN
Proposal
Change of use and conversion of curtilage building to single dwelling house.
As published by the council, reference EPF/0934/25
Timeline
Dates from the published record
-
30 Apr 2025
Received by Epping Forest
-
12 Aug 2025
Validated
Checked as complete and ready for consideration.
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
EPF/1157/26 Awaiting decision
The Willows, Epping Long Green, Epping Upland, Epping, CM16 6QN
Proposed extension including raising of ridge and provision of rooms in the roof.
-
EPF/1936/25 Granted
Rose Cottage, Epping Long Green, Epping Upland, Epping, CM16 6QN
Approval of Details Reserved by Condition 4 of EPF/1536/25 Construction Method Statement (Variation of condition 2 `Plan numbers' of EPF/0924/23 (Demolition of existing stables and hardstanding, construction of detached bungalow, alterations to vehicular access, provision of parking and landscaping)).
-
EPF/1011/26 Refused
Rose Cottage, Epping Long Green, Epping Upland, Epping, CM16 6QN
Non-Material Amendment to EPF/0924/23 (Demolition of existing stables and hardstanding, construction of detached bungalow, alterations to vehicular access, provision of parking and landscaping).
-
EPF/1290/26 Awaiting decision
Stables Opposite Rose Cottage, Epping, CM16 6QN
Demolition of Existing Buildings and Hardstanding and Construction of New Dwelling with Associated Parking and Landscaping (Revised Application Following Refusal of EPF/0130/26).
-
EPF/1194/26 Awaiting decision
Rose Cottage, Epping Long Green, Epping Upland, Epping, CM16 6QN
Certificate of Lawful Development for proposed garden room.
Other full applications applications
In Epping Forest
-
EPF/1139/26 Refused
Land to rear of Gables, Church Lane, Sheering, Harlow, CM22 7NR
Stable building.
-
EPF/1468/26 Awaiting decision
Sedge Gate Nursery, Sedge Green, Nazeing, Waltham Abbey, EN9 2PA
Retrospective reinstatement of the northern vehicular access from Sedge Green to serve as the access and egress for Units 12–31 Leaside Industrial Park (formerly Sedge Gate Nursery).
-
EPF/0874/26 Refused
Petrol Filling Station, Chelmsford Rd, Norton Heath, Ingatestone CM4 0LQ
Retrospective application for erection of extension to existing building, new bin store area and 2 EV charging spaces with associated infrastructure.
-
EPF/1454/26 Awaiting decision
58, Queens Road, Buckhurst Hill, IG9 5BY
Retrospective application for the erection and retention of an extractor flue to the rear elevation and containers to rear of outrigger.
-
EPF/1031/26 Granted
Abbess Roding Hall, Green Hill Road, Ongar, CM5 0PA
Construction of a single self-build residential dwelling alongside associated development.