Planning application

Sparlings, Epping Road, Nazeing, Waltham Abbey, EN9 2DH

Awaiting decision Epping Forest EPF/0762/26 Full planning permission

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Partial demolition of existing house and erection of a self-build detached dwelling to the side (Resubmission following dismissal of appeal ref 6002623).

As published by the council, reference EPF/0762/26

Application record

Reference
EPF/0762/26
Type
Full planning permission
Status
Under Consultation
Received
17 Apr 2026
Validated
5 May 2026
Ward
Epping West and Rural
Parish
Roydon
Decision by
Delegated Decision
Postcode
EN9 2DH

Comment by 25 September 2026

The council is taking comments on this application until then. Comments go to Epping Forest through their own planning portal.

Site history

Applications at this address on the Epping Forest register

This site has had 2 applications since 2021: 1 approved, 0 refused.

  • EPF/2497/21 Granted

    Sparlings Epping Road Nazeing Waltham Abbey EN9 2DH

    Nazeing & South Roydon Conservation Area 53 x Leyland Cypress - Fell.

    Decided 22 Oct 2021 Trees

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Epping Forest

  2. 5 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epping Forest took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Epping Forest for determination, against a statutory target of eight weeks. Over the last year Epping Forest decided full applications in a median of 82 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Epping Forest

  • EPF/1194/25 Refused

    28, Wayletts, London Road, Stanford Rivers, Ongar, CM5 9QD

    Change of industrial use (B2 Use Class) land to leisure, with introduction of 3 new padel courts with flood lights.

    10 Jun 2025 Full applications
  • EPF/1707/26 Awaiting decision

    Leverton County Gm Junior And Infant School, Honey Lane, Waltham Abbey, EN9 3BE

    Proposed removal of existing brick slip cladding which is defective to existing modular building, to be replaced with textured plank cladding system

    7 Sep 2026 Full applications
  • EPF/1692/26 Awaiting decision

    Bronte House, 58-62 High Street, Epping, CM16 4AE

    Insertion of 2 new windows on 2nd floor on SW elevation.

    4 Sep 2026 Full applications
  • EPF/0414/25 Refused

    Land off, Honey Lane, Waltham Abbey, EN9 3AY

    A mixed-use development comprising a care home (Use Class C2) and six residential (Specialist Supported living accommodation for adult with complex learning difficulties) (Use Class C2) dwellings together with open space, car parking, landscaping and means of access.

    27 Feb 2025 Full applications
  • EPF/0533/26 Granted

    32, Piercing Hill, Theydon Bois, Epping, CM16 7JW

    Replacement dwelling with basement level.

    16 Mar 2026 Full applications