Planning application
Sizewell C And Associated Development Sites
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)
As published by the council, reference DC/26/1096/DRR42
Application record
- Reference
- DC/26/1096/DRR42
- Type
- Discharge of Requirements (42 days)
- Status
- Awaiting decision
- Received
- 20 Mar 2026
- Validated
- 20 Mar 2026
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
Site history
Applications at this address on the East Suffolk register
This site has had 17 applications since 2024: 15 approved, 0 refused.
-
DC/26/2447/DRR Awaiting decision
Sizewell C And Associated Development Sites
Development Consent Order Requirement 4 - Project wide: Terrestrial ecology monitoring and mitigation plan of the Sizewell C Development Consent Order
-
DC/26/0535/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Yoxford Roundabout (AD BMP 13 Rev 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order.
-
DC/26/0393/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Rail Works March 2026 - November 2026 (AD BMP 14 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/26/0391/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Northern Park and Ride (AD BMP 4 Rev 5), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4819/DRR28 Granted
Sizewell C And Associated Development Sites
Sizewell C Deed of Obligation, Noise Mitigation Scheme - Schedule 12 Annex W: Junction South of Bramfield, Refreshed Noise Assessment
-
DC/25/3731/DRR Granted
Sizewell C And Associated Development Sites
Discharge of Requirement 26 (Main development site: Wet woodland) - Pakenham (Work No. 18) of the Sizewell C Development Consent Order
-
DC/25/2790/DRR42 Granted
Sizewell C And Associated Development Sites
Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order
-
DC/25/2665/CON Granted
Sizewell C And Associated Development Sites
Consultation - Marine Environmental Monitoring Plan (MEMP), pursuant to Condition 15(1) of the Sizewell C Deemed Marine License
-
DC/25/2591/CCC Granted
Sizewell C And Associated Development Sites
Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION
-
DC/25/2580/DRR Granted
Sizewell C And Associated Development Sites
Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order
Timeline
Dates from the published record
-
20 Mar 2026
Received by East Suffolk
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
East Suffolk took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with East Suffolk for determination, against a statutory target of eight weeks. Over the last year East Suffolk decided condition discharge and variation applications in a median of 51 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Sizewell C And Associated Development Sites
Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION
Granted Outline 2 docs -
Sizewell C And Associated Development Sites
Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order
Granted Conditions 17 docs -
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) ACA/LEEIE Works (MDS BMP 6), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Granted Conditions 7 docs -
Sizewell C And Associated Development Sites
Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order
Granted Conditions 16 docs -
Sizewell C And Associated Development Sites
Partial Discharge of Requirement 36 Associated Developments: Highway Landscape Works - Friday Street Roundabout (Work No. 11b) of the Sizewell C Development Consent Order
Granted Conditions 21 docs -
Sizewell C And Associated Development Sites
Discharge of Requirement 33 (Associated development sites: Buildings, structures and landscape) Partial discharge for Northern Park and Ride of the Sizewell C Development Consent Order
Granted Conditions 15 docs
Other condition discharge and variation applications
In East Suffolk
-
DC/26/1893/DRC Granted
The Workshop Brick Kiln Lane Melton Woodbridge Suffolk IP12 2PB
Discharge of conditions 7 and 10 of DC/23/2365/FUL - Demolition of existing workshop buildings, erection of replacement workshop, authorisation of existing workshop extensions, associated works. - Condition 7 - Construction Management Plan; Condition 10 - Noise Management Plan
-
DC/26/2573/DRC Granted
North Suffolk Skills Academy Harrisons Lane Halesworth Suffolk IP19 8PY
Discharge of condition Nos. 14, 19 & 26 of DC/21/0007/FUL - Change of use to sports facilities comprising new grass football pitch adjacent to Harrisons Lane and construction of a new artificial football pitch with associated parking, access, lighting, acoustic fencing and drainage adjacent to the Apollo Youth Centre and adjacent field to the south. - 14 - Construction Mngt Plan, 19 - Construction and Phasing Plan and 26 - Surface Water
-
DC/26/2736/DRC Granted
Land Adj School Road Church Road Ringsfield Suffolk
Discharge of Condition No. 10 of DC/25/3030/VOC - Variation of Condition No. 2 of DC/17/2934/VOC - Construction of 10 No.Holiday Lodges, 1 No. retail unit and 1 No. self contained flat. This application is seeking modification to the appearance and layout of the originally approved lodges - discharge of surface water
-
DC/26/3165/DRC Awaiting decision
Timber Mill Barns Sizewell Hall Road Leiston Suffolk IP16 4TT
Discharge of Condition Nos. 18, 21 and 23 of DC/25/1355/FUL - Alterations to the existing structure & external envelope as part of the formation of two residential dwellings from agricultural barn - 18. Construction Method Statement 21. Emergency Demolition/Construction Manangement Plan 23. Radiation Emergency Contingency Plan.
-
DC/26/3167/DRC Awaiting decision
St Michaels Church Church Street Framlingham Suffolk IP13 9BQ
Discharge of Condition No. 3 of DC/26/1993/FUL - Rebuilding of a brick bounday wall - Archaeological Monitoring