Planning application
Sizewell C And Associated Development Sites
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION
As published by the council, reference DC/25/2591/CCC
Application record
- Reference
- DC/25/2591/CCC
- Type
- Consultation by County Council
- Status
- Responded
- Decision
- Granted As published: No Objections
- Received
- 30 Jun 2025
- Validated
- 30 Jun 2025
- Decided
- 29 Sep 2025
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 17 applications since 2024: 15 approved, 0 refused.
-
DC/26/2447/DRR Awaiting decision
Sizewell C And Associated Development Sites
Development Consent Order Requirement 4 - Project wide: Terrestrial ecology monitoring and mitigation plan of the Sizewell C Development Consent Order
-
DC/26/1096/DRR42 Awaiting decision
Sizewell C And Associated Development Sites
Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)
-
DC/26/0535/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Yoxford Roundabout (AD BMP 13 Rev 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order.
-
DC/26/0393/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Rail Works March 2026 - November 2026 (AD BMP 14 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/26/0391/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Northern Park and Ride (AD BMP 4 Rev 5), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4819/DRR28 Granted
Sizewell C And Associated Development Sites
Sizewell C Deed of Obligation, Noise Mitigation Scheme - Schedule 12 Annex W: Junction South of Bramfield, Refreshed Noise Assessment
-
DC/25/3731/DRR Granted
Sizewell C And Associated Development Sites
Discharge of Requirement 26 (Main development site: Wet woodland) - Pakenham (Work No. 18) of the Sizewell C Development Consent Order
-
DC/25/2790/DRR42 Granted
Sizewell C And Associated Development Sites
Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order
-
DC/25/2665/CON Granted
Sizewell C And Associated Development Sites
Consultation - Marine Environmental Monitoring Plan (MEMP), pursuant to Condition 15(1) of the Sizewell C Deemed Marine License
-
DC/25/2580/DRR Granted
Sizewell C And Associated Development Sites
Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order
Timeline
Dates from the published record
-
30 Jun 2025
Received by East Suffolk
-
29 Sep 2025
Decision issued: No Objections
-
2 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 29 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Sizewell C And Associated Development Sites
Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order
Granted Conditions 17 docs -
Sizewell C And Associated Development Sites
99% historically approved · decision due ~15 May
Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)
Awaiting decision Conditions 5 docs -
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) ACA/LEEIE Works (MDS BMP 6), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Granted Conditions 7 docs -
Sizewell C And Associated Development Sites
Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order
Granted Conditions 16 docs -
Sizewell C And Associated Development Sites
Partial Discharge of Requirement 36 Associated Developments: Highway Landscape Works - Friday Street Roundabout (Work No. 11b) of the Sizewell C Development Consent Order
Granted Conditions 21 docs -
Sizewell C And Associated Development Sites
Discharge of Requirement 33 (Associated development sites: Buildings, structures and landscape) Partial discharge for Northern Park and Ride of the Sizewell C Development Consent Order
Granted Conditions 15 docs
Other outline applications
In East Suffolk
-
DC/26/3004/CCC Granted
A12 Between Junctions 58 (Seven Hills) And Woods Lane Roundabout Woodbridge Suffolk
County Council Consultation - Transport improvements to the A12 from Junction 58 (Seven Hills, Ipswich) to Woods Lane Roundabout, Woodbridge including the upgrade from a single carriageway to dual carriageway between A12 / B1438 and the A12 / B1078, Construction of a new pedestrian bridge and other highways and pedestrian improvements.
-
DC/26/3240/PDN Granted
Proposed Substation Adjacent Broombank Saxmundham Road Aldeburgh Suffolk
Installation of a substation within a land plot of 3m x 3m located near Saxmudham Road, Aldeburgh
-
DC/26/3256/CON Granted
Bank And Premises Exchange Square Beccles Suffolk NR34 9HH
Consultation - New Pavement Licence for Pascolo Lounge, Beccles 4 tables and 8 chairs Front of the premises: left-hand side 1.6m x 3.5m, right-hand side 1.6m x 2.5m Monday to Sunday 08:00 to 23:00
-
DC/26/3255/CON Granted
YouDrink Bottleshop & Taproom 4 Thoroughfare Halesworth Suffolk IP19 8AH
Consultation - RENEWAL of pavement licence - 2 tables 4 chairs, Area infront of the premises - 5.2m x 2.5m, Monday to Sunday 09:00 until 23:00
-
DC/26/3431/CON Awaiting decision
Black Barn Farm Monewden Road Charsfield Woodbridge Suffolk IP13 7QE
Consultation - To install electronic communications apparatus/development ancillary to radio equipment housing on behalf of Cornerstone.