Planning application
Sizewell C And Associated Development Sites
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Consultation - Initial Programme of Works to the MMO for it's review and potential discharge relating to Condition 7(1) of the Deemed Marine Licence (DML).
As published by the council, reference DC/24/2929/CON
Application record
- Reference
- DC/24/2929/CON
- Type
- Other Consultation
- Status
- Responded
- Decision
- No Objections
- Received
- 14 Aug 2024
- Validated
- 14 Aug 2024
- Decided
- 10 Sep 2024
- Ward
- Aldeburgh And Leiston
- Parish
- Leiston Cum Sizewell
- Decision by
- Delegated Decision
Site history
Applications at this address on the East Suffolk register
This site has had 17 applications since 2024: 15 approved, 0 refused.
-
DC/26/2447/DRR Awaiting decision
Sizewell C And Associated Development Sites
Development Consent Order Requirement 4 - Project wide: Terrestrial ecology monitoring and mitigation plan of the Sizewell C Development Consent Order
-
DC/26/1096/DRR42 Awaiting decision
Sizewell C And Associated Development Sites
Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)
-
DC/26/0535/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Yoxford Roundabout (AD BMP 13 Rev 7), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order.
-
DC/26/0393/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Rail Works March 2026 - November 2026 (AD BMP 14 Rev 4), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/26/0391/DRR28 Granted
Sizewell C And Associated Development Sites
Bespoke Mitigation Plan (Noise and Vibration) Northern Park and Ride (AD BMP 4 Rev 5), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
-
DC/25/4819/DRR28 Granted
Sizewell C And Associated Development Sites
Sizewell C Deed of Obligation, Noise Mitigation Scheme - Schedule 12 Annex W: Junction South of Bramfield, Refreshed Noise Assessment
-
DC/25/3731/DRR Granted
Sizewell C And Associated Development Sites
Discharge of Requirement 26 (Main development site: Wet woodland) - Pakenham (Work No. 18) of the Sizewell C Development Consent Order
-
DC/25/2790/DRR42 Granted
Sizewell C And Associated Development Sites
Development Consent Order Requirement 30 (Accommodation campus: Buildings and Structures) of the Sizewell C Development Consent Order
-
DC/25/2665/CON Granted
Sizewell C And Associated Development Sites
Consultation - Marine Environmental Monitoring Plan (MEMP), pursuant to Condition 15(1) of the Sizewell C Deemed Marine License
-
DC/25/2591/CCC Granted
Sizewell C And Associated Development Sites
Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION
Timeline
Dates from the published record
-
14 Aug 2024
Received by East Suffolk
-
10 Sep 2024
Decision issued: No Objections
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
East Suffolk granted permission on 10 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Sizewell C And Associated Development Sites
Consultation - Marine Environmental Monitoring Plan (MEMP), pursuant to Condition 15(1) of the Sizewell C Deemed Marine License
Granted Outline 2 docs -
Sizewell C And Associated Development Sites Saxmundham To Leiston Branch Line And New Green Rail Route Leiston Suffolk
Bespoke Mitigation Plan (Noise and Vibration) Rail Works September 2025 - February 2026 (AD BMP 14 - updated), secured by the Noise Monitoring and Management Plan under Requirement 2 (Code of Construction Practice) of the Sizewell C Development Consent Order
Granted Conditions 7 docs -
Proposed Sizewell C Sizewell Power Station Road Sizewell Leiston Suffolk
99% historically approved · decision due ~29 Jan
Discharge of Requirement 31 (Rail infrastructure) - Green Rail Route of the Sizewell C Development Consent Order
Awaiting decision Conditions 5 docs -
Sizewell C And Associated Development Sites
Consultation - DISCHARGE OF REQUIREMENT 23 MAIN DEVELOPMENT SITE HIGHWAY WORKS NO. 1C (LEISTON DRAIN BRIDLEWAY BRIDGE) IN RESPECT OF SZC Co. SIZEWELL C NUCLEAR POWER STATION
Granted Outline 2 docs -
Sizewell C And Associated Development Sites
Discharge of Requirement 5 (Project wide: Surface and Foul Water Drainage) Partial discharge for Southern Park and Ride (Work No. 10) of Sizewell C Development Consent Order
Granted Conditions 17 docs -
Sizewell C And Associated Development Sites
99% historically approved · decision due ~15 May
Discharge of Requirement 9 (Main development site: Site clearance) of the Sizewell C Development Consent Order Application Type: discharge of requirement - 42 days (/DRR)
Awaiting decision Conditions 5 docs
Other outline applications
In East Suffolk
-
DC/26/3197/EIA Awaiting decision
Part Land South East Of Grimseys Lane Leiston Suffolk
EIA Screening Opinion - Reservoir Extension to Sizewell Estate
-
DC/26/2832/CON Granted
Land To North Of Railway Line Henley Road Ipswich Suffolk
Consultation - Submission of Reserved Matters (appearance, layout, landscaping, and scale) for part of Phase 4a and Phase 4b (Part of Phase 5 of approved Phasing Strategy) of the development at Henley Gate comprising 121 dwellings, roads, parking, open space, landscaping, drainage, and other associated works; pursuant to Outline Planning Permission IP/16/00608/OUT comprising up to 1,100 dwellings, local centre, country park, open space, sustainable urban drainage systems, access points from Henley Road and associated engineering works. IP/16/00608/OUT was an EIA development and an Environmental Statement was submitted with the application under the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations 2011 (as amended).
-
DC/26/3120/CON Awaiting decision
Suffolk Water Recycling Transfer And Storage Project Suffolk
Consultation - Request for Scoping Opinion under Regulation 10 of The Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 and Regulation 13 of The Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended in 2017)
-
DC/26/2886/CON Granted
Land At Silverlace Green Benhall Suffolk IP17 1JH
Consultation - To facilitate a new connection it has become necessary for Eastern Power Networks plc to upgrade the existing pole mounted transformer to 50kVa.
-
DC/26/2965/CCC Granted
Land At Foxburrow Farm Brightwell Suffolk
County Council Consultation - Retrospective extension to an existing recycling facility for the importation, storage, treatment and recycling of inert waste and storage of building materials, with parking, office, storage facilities and associated infrastructure.