Skip to content
PlanIndex Get alerts
Menu

Planning application

The Acorns Harefield Drive Lympstone Devon EX8 5TT

Awaiting decision East Devon 26/1283/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 'granny annexe' in lieu of existing workshop

As published by the council, reference 26/1283/FUL

Application record

Reference
26/1283/FUL
Type
Full Application
Status
Awaiting decision
Received
26 Jun 2026
Validated
26 Jun 2026
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5TT

Timeline

Dates from the published record

  1. 26 Jun 2026

    Received by East Devon

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Darrell Willcocks Architects Ltd Agent, an architecture practice registered in Newton Abbot

Active · incorporated 2012 · Newton Abbot

17 applications on PlanIndex · across 2 councils · 67% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided full applications in a median of 50 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land North East Of Grange Close Lympstone EX8 5LD

    26/0101/DOC Submitted 19 Jan 2026 74m away

    97% historically approved · decision due ~16 Mar

    Discharge of condition for 25/0100/FUL: Condition 3 (Materials), Condition 15 (Water Butts) and Condition 16 (Sustainability Statement)

    Awaiting decision Conditions 8 docs
  • Land Adjacent To 21 Strawberry Hill Lympstone Devon EX8 5JZ

    25/1737/VAR Submitted 15 Sep 2025 151m away

    96% historically approved · decision due ~10 Nov

    Variation of conditions 2 (approved plans0, 3 (tree protection), 4 (finished floor levels) and 5 (earthworks) on Planning Permission 21/2317/VAR (Variation of condition 2 (approved plans) of 21/0490/FUL (Proposed new dwelling and car port) to allow an extension to the south eastern gable, infill of first floor void on south western elevation, enlargement of terrace are and alterations to landscaping

    Awaiting decision Amendments New dwelling Extension +1 13 docs
    Domestic
  • Byfield Longmeadow Road Lympstone EX8 5LE

    26/1462/CPL Submitted 20 Jul 2026 166m away

    Certificate of Proposed Lawful Development for the installation of roof lights to the front-facing pitched roof.

    Granted Lawful development Loft or dormer 8 docs
  • Byfield Longmeadow Road Lympstone Exmouth EX8 5LE

    25/2323/FUL Submitted 12 Nov 2025 168m away

    93% historically approved · decision due ~7 Jan

    Hip to gable roof alterations including rear first floor extension, removal and replacement of front dormer, removal and replacement of garage, installation of front decking and the addition of cladding.

    Awaiting decision Full applications Extension Loft or dormer +1 15 docs
  • 1 Birch Road Lympstone Devon EX8 5LB

    22/1691/FUL Submitted 9 Aug 2022 173m away

    Erection of a two storey 4-bed detached dwelling and demolition of existing dwelling as part of existing application No. 22/0445/FUL.

    Granted Full applications New dwelling Demolition 15 docs
    Domestic
  • Byfield Longmeadow Road Lympstone Exmouth EX8 5LE

    26/1775/DOC Submitted 1 Sep 2026 193m away

    Discharge of Condition for 25/2323/FUL: Condition 4 (external materials and finishes)

    Granted Conditions 3 docs

In East Devon

  • 26/1859/FUL Awaiting decision

    55 King Alfred Way Newton Poppleford Sidmouth EX10 0DG

    Installation of conservatory to the rear of the property.

    15 Sep 2026 Full applications
  • 26/1796/FUL Awaiting decision

    Popplefords Barn Nursery And Farm Shop Exeter Road Newton Poppleford EX10 0DE

    Proposed change of use, conversion of the existing spa building to provide staff/Care Home Manager's accommodation tied to Hillside House Residential Care Home; retention of the existing single-storey plant/store building and associated works.

    11 Sep 2026 Full applications
  • 26/1448/FUL Granted

    16 Bussel Close Exeter EX1 3GU

    Proposed single storey extension on north elevation

    11 Aug 2026 Full applications
  • 26/1059/FUL Granted

    Little Hayes Broadclyst Station Exeter EX5 3AX

    Replacement dwelling.

    9 Jun 2026 Full applications
  • 26/1601/FUL Awaiting decision

    31 Newlands Road Sidmouth EX10 9NL

    Construction of first floor studio over existing detached garage with external staircase.

    10 Sep 2026 Full applications