Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Birch Road Lympstone Devon EX8 5LB

Granted East Devon 22/1691/FUL Full Application

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a two storey 4-bed detached dwelling and demolition of existing dwelling as part of existing application No. 22/0445/FUL.

As published by the council, reference 22/1691/FUL

Application record

Reference
22/1691/FUL
Type
Full Application
Status
Approved
Decision
Approval with conditions
Received
9 Aug 2022
Validated
9 Aug 2022
Decided
8 Nov 2022
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5LB

Timeline

Dates from the published record

  1. 9 Aug 2022

    Received by East Devon

  2. 8 Nov 2022

    Decision issued: Approval with conditions

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Byfield Longmeadow Road Lympstone EX8 5LE

    26/1462/CPL Submitted 20 Jul 2026 66m away

    Certificate of Proposed Lawful Development for the installation of roof lights to the front-facing pitched roof.

    Granted Lawful development Loft or dormer 8 docs
  • Byfield Longmeadow Road Lympstone Exmouth EX8 5LE

    25/2323/FUL Submitted 12 Nov 2025 68m away

    93% historically approved · decision due ~7 Jan

    Hip to gable roof alterations including rear first floor extension, removal and replacement of front dormer, removal and replacement of garage, installation of front decking and the addition of cladding.

    Awaiting decision Full applications Extension Loft or dormer +1 15 docs
  • Abbotsford Longmeadow Road Lympstone EX8 5LE

    26/0645/FUL Submitted 14 Apr 2026 83m away

    Creation of a new two storey detached dwelling.

    Granted Full applications New dwelling 23 docs
    Domestic
  • Abbotsford Longmeadow Road Lympstone Devon EX8 5LE

    25/1595/FUL Submitted 29 Aug 2025 86m away

    Demolition of existing single storey extension and detached garage to facilitate creation of a new two storey detached dwelling

    Refused Full applications New dwelling Extension +1 23 docs
    Small domestic
  • Monterey Strawberry Hill Lympstone Devon EX8 5JZ

    25/1870/TRE Submitted 9 Sep 2025 101m away

    T314, Noble Fir : reduce height by up to 3m. G1 Fell two Eucalyptus trees

    Granted Trees 5 docs
  • Byfield Longmeadow Road Lympstone Exmouth EX8 5LE

    26/1775/DOC Submitted 1 Sep 2026 113m away

    Discharge of Condition for 25/2323/FUL: Condition 4 (external materials and finishes)

    Granted Conditions 3 docs

In East Devon

  • 26/1714/FUL Awaiting decision

    5 Long Copp Budleigh Salterton Devon EX9 6DY

    Detached double garage with first-floor ancillary gym/office accommodation and shower room, within the residential curtilage. The development is ancillary to the existing dwelling and does not create an additional dwelling or independent residential planning unit

    4 Sep 2026 Full applications
  • 26/1565/FUL Granted

    1 Hillymead Seaton EX12 2LF

    Retrospective permission for re-landscaping the drive area

    4 Aug 2026 Full applications
  • 26/1757/FUL Awaiting decision

    Annexe Leustona Longmeadow Road Lympstone Exmouth EX8 5LL

    New porch

    3 Sep 2026 Full applications
  • 26/1571/FUL Granted

    Hillsboro 44 Marlpit Lane Seaton EX12 2HL

    Construction of two-storey side extension

    5 Aug 2026 Full applications
  • 26/1536/FUL Granted

    Bramblings Smallridge Axminster EX13 7JL

    Single storey extension to the east elevation and raised patio.

    4 Aug 2026 Full applications