Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjacent To 21 Strawberry Hill Lympstone Devon EX8 5JZ

Awaiting decision East Devon 25/1737/VAR Variation of Condition

Works: New dwelling Extension Trees Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Variation of conditions 2 (approved plans0, 3 (tree protection), 4 (finished floor levels) and 5 (earthworks) on Planning Permission 21/2317/VAR (Variation of condition 2 (approved plans) of 21/0490/FUL (Proposed new dwelling and car port) to allow an extension to the south eastern gable, infill of first floor void on south western elevation, enlargement of terrace are and alterations to landscaping

As published by the council, reference 25/1737/VAR

Application record

Reference
25/1737/VAR
Type
Variation of Condition
Status
Awaiting decision
Received
15 Sep 2025
Validated
15 Sep 2025
Ward
Woodbury And Lympstone
Parish
Lympstone
Postcode
EX8 5JZ

Timeline

Dates from the published record

  1. 15 Sep 2025

    Received by East Devon

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 10 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    East Devon took a median of 42 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Exeter

21 applications on PlanIndex · across 6 councils · 69% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with East Devon for determination, against a statutory target of eight weeks. Over the last year East Devon decided amendment applications in a median of 36 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land North East Of Grange Close Lympstone EX8 5LD

    26/0101/DOC Submitted 19 Jan 2026 81m away

    95% historically approved · decision due ~16 Mar

    Discharge of condition for 25/0100/FUL: Condition 3 (Materials), Condition 15 (Water Butts) and Condition 16 (Sustainability Statement)

    Awaiting decision Conditions 8 docs
  • The Acorns Harefield Drive Lympstone Devon EX8 5TT

    26/1283/FUL Submitted 26 Jun 2026 151m away

    93% historically approved · decision due ~21 Aug

    Erection of 'granny annexe' in lieu of existing workshop

    Awaiting decision Full applications 7 docs
  • 34 Jackson Meadow Lympstone Exmouth EX8 5GZ

    21/0409/FUL Submitted 17 Feb 2021 182m away

    Construction of single storey rear extension

    Granted Full applications Extension 7 docs
    Small domestic
  • 1 Birch Road Lympstone Devon EX8 5LB

    22/1691/FUL Submitted 9 Aug 2022 205m away

    Erection of a two storey 4-bed detached dwelling and demolition of existing dwelling as part of existing application No. 22/0445/FUL.

    Granted Full applications New dwelling Demolition 15 docs
    Domestic
  • Byfield Longmeadow Road Lympstone EX8 5LE

    26/1462/CPL Submitted 20 Jul 2026 243m away

    Certificate of Proposed Lawful Development for the installation of roof lights to the front-facing pitched roof.

    Granted Lawful development Loft or dormer 8 docs
  • Byfield Longmeadow Road Lympstone Exmouth EX8 5LE

    25/2323/FUL Submitted 12 Nov 2025 246m away

    93% historically approved · decision due ~7 Jan

    Hip to gable roof alterations including rear first floor extension, removal and replacement of front dormer, removal and replacement of garage, installation of front decking and the addition of cladding.

    Awaiting decision Full applications Extension Loft or dormer +1 15 docs

In East Devon

  • 26/1694/NMA Awaiting decision

    Land South Of Windmill Lane West Hill

    Minor amendment for 23/1143/MFUL : Change to porch details from metal to wood - plots 2, 12, 22, 23 and 24.

    20 Aug 2026 Amendments
  • 26/1196/NMA Decided

    Unit 1 Heathpark Way Heathpark Industrial Estate Honiton Devon EX14 1BB

    Minor amendment for 25/0021/FUL : Amendment to parking layout

    15 Jun 2026 Amendments
  • 26/1466/NMA Decided

    Units 2 + 3 Heathpark Way Heathpark Industrial Estate Honiton EX14 1BB

    Minor amendment to 26/0711/VAR : update drawing references

    20 Jul 2026 Amendments
  • 26/1611/VAR Awaiting decision

    3 Bakers Cottages Longmeadow Road Lympstone Devon EX8 5LP

    Variation of Condition Numbers 2 (Approved Plans), 3 (Rooflight) and 4 (Materials) on Planning permission 25/2493/LBC (Removal of existing extension and conservatory and the construction of new single storey extension on rear), for changes to roof pitch, materials and rooflight design.

    11 Aug 2026 Amendments
  • 26/1603/NMA Awaiting decision

    Land North Of Old Tithebarn Lane Clyst Honiton

    Non-material Amendment for 24/2399/MRES: Removal of front roof light to Greenwood Housetype in Phases 4 and 5

    7 Aug 2026 Amendments