Proposal
Application for non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 24/00836/FULEIA (dated 28.10.2025) for the following works: (a) Amendment to condition 99 (Approved Drawings) for design changes including (i) adjustment to building location within the site (ii) changes to exit locations at ground level and associated alteration to City Market floorspace (iii) increase in height of cycle hub roof by 1.4m (iv) increase in height of main building by 400mm (v) removal of columns at ground floor (vi) introduction of new public route (vii) façade changes to structural beams, and (viii) other associated works; (b) Amendment to Description of Development to reflect proposed phasing of the development; (c) Introduction of new condition related to phasing of the development; (d) Amendment to Condition 3 (Servicing Bay Headroom) to reduce the headroom to 3.7m; (e) Amendment to Condition 61 (Building Height) to accommodate changes; (f) Amendment to Condition 87 (Fire Strategy) to update the document reference; (g) Amendment to Condition 88 (Approved Floorspace) to reflect the changes; and (h) Associated amendments to conditions 17, 20, 21, 22, 29, 34, 36, 37, 39, 40, 44, 45, 46, 48, 50, 52, 59, 73, 77, 78, 79, 80, 81, 82, 93, 94, and 95 to reflect the above changes.
As published by the council, reference 26/01519/NMA
Application record
- Reference
- 26/01519/NMA
- Category
- Amendments
- Status
- Under Consideration
- Received
- 26 Oct 2026
- Validated
- 26 Oct 2026
- Ward
- Cornhill
- Decision by
- Delegated
- Postcode
- EC2M 3XD
Comment by 7 December 2026
The council is taking comments on this application until then. Comments go to City of London through their own planning portal.
Site history
Applications at this address on the City of London register
This site has had 13 applications since 2021: 8 approved, 0 refused.
-
26/01663/PODC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of Local Procurement Strategy and the Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraphs 2.1 and 3.2 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
-
26/01551/MDC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of Construction Methodology and Construction Management Strategy pursuant to Condition 42 & 45 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/01549/MDC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of details of Site Condition and Proposed Ground Levels Plan pursuant to condition 80 of Planning Permission 24/00836/FULEIA dated 28.10.2025.
-
26/01473/PODC Granted
99 Bishopsgate London EC2M 3XD
Submission of Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraphs 6.1 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
-
26/01201/ADVT Granted
99 Bishopsgate London EC2M 3XD
Installation and display of external window vinyls in relation to the National Gallery Faces of a City Exhibition.
-
26/00572/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a written scheme of investigation pursuant to condition 36 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00564/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a Desk Based Contamination Investigation and Factual Ground Investigation Report pursuant to condition 29 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00563/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a Pre-demolition Audit pursuant to condition 46(a) of Planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00562/MDC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of details of an Arboricultural Impact Assessment pursuant to condition 95 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00629/PODC Granted
99 Bishopsgate London EC2M 3XD
Submission of Television Interference Survey and Survey Area Map pursuant to Schedule 3 Paragraphs 12.1.1 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
Timeline
Dates from the published record
-
26 Oct 2026
Received by City of London
-
9 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 86 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
3,255 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track record99 Bishopsgate Real Estate SARL Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
104 documents on file for this application
Drawings (91)
- Level 51 plan proposed
- Level 49 plan proposed
- Level 54 plan proposed
- Level 56 plan proposed
- Level 34 plan proposed
- Level 33 plan proposed
- Level 32 plan proposed
- Level 35 plan proposed
- Level 37 plan proposed
- Level 40 plan proposed
- Level 41 plan proposed
- Level 42 plan proposed
- Level 43 plan proposed
- Level 44 plan proposed
- Level 45 plan proposed
- Level 47 plan proposed
- Level 46 plan proposed
- Level 48 plan proposed
- Level 53 plan proposed
- Level 28 plan proposed
- Level 29 plan proposed
- Level 30 plan proposed
- Level 31 plan proposed
- Level 57 plan proposed
- Level 58 plan proposed
- Basement level 2 plan general arrangement proposed
- Level 08 plan proposed
- Level 09 plan proposed
- Level 07 plan proposed
- Level 10 plan proposed
- Level 11 plan proposed
- Level 12 plan proposed
- Level 15 plan proposed
- Level 14 plan proposed
- Level 13 plan proposed
- Level 16 plan proposed
- Level 19 plan proposed
- Level 22 plan proposed
- Level 24 plan proposed
- Level 25 plan proposed
- Level 26 plan proposed
- Level 27 plan proposed
- Level 38 plan proposed
- Level 52 plan proposed
- Level 50 plan proposed
- Level 55 plan proposed
- Basement level 3 plan general arrangement proposed
- Basement level 1 plan general arrangement proposed
- Level 01 plan proposed
- Level 02 plan proposed
- Ground floor plan general arrangement proposed
- Level 04 plan proposed
- Level 03 plan proposed
- Level 06 plan proposed
- Level 05 plan proposed
- Level 21 plan proposed
- Level 23 plan proposed
- Level 20 plan proposed
- Level 18 plan proposed
- Level 17 plan proposed
- Level 36 plan proposed
- Level 39 plan proposed
- South elevation external core proposed
- East elevation external core interfaces proposed
- South elevation external core proposed
- North elevation typical floor external terrace proposed
- North elevation typical floors proposed
- North elevation typical floor high level terrace proposed
- Northeast elevation cycle hub proposed
- Detail bay north elevation lower levels proposed
- Detail bay south elevation external core proposed
- Proposed east elevation
- Proposed west elevation
- Proposed north elevation
- Proposed south elevation
- Proposed elevation in context north
- Proposed elevation in context north
- Proposed elevation in context south west
- Section bb proposed
- Section aa proposed
- Section winter gardens proposed
- Roof plan proposed
- Public arcade soffits proposed
- Pavilion and cycle hub elevation
- Rshp-p
- Phase 2 phasing plan
- Phase 1 early implementation works plan
- Phase 0 early implementation works plan
- Phase 2 early implementation works plan
- Phase 0 phasing plan
- Phase 1 phasing plan
Everything on file (104)
- DECISION NOTICE WITH TRACKED CHANGES
- DECISION NOTICE
- 99BG_SECTION 96 ISSUE DIS
- PHASE 2 PHASING PLAN
- RSHP-P-0003-RP-XX_LOW RES_PAGE 33-57
- LEVEL 51 PLAN GA PROPOSED
- LEVEL 49 PLAN GA PROPOSED
- LEVEL 54 PLAN GA PROPOSED
- LEVEL 56 PLAN GA PROPOSED
- ROOF PLAN GA PROPOSED
- LEVEL 34 PLAN GA PROPOSED
- LEVEL 33 PLAN GA PROPOSED
- LEVEL 32 PLAN GA PROPOSED
- LEVEL 35 PLAN GA PROPOSED
- LEVEL 37 PLAN GA PROPOSED
- LEVEL 40 PLAN GA PROPOSED
- LEVEL 41 PLAN GA PROPOSED
- LEVEL 42 PLAN GA PROPOSED
- LEVEL 43 PLAN GA PROPOSED
- LEVEL 44 PLAN GA PROPOSED
- LEVEL 45 PLAN GA PROPOSED
- LEVEL 47 PLAN GA PROPOSED
- LEVEL 46 PLAN GA PROPOSED
- LEVEL 48 PLAN GA PROPOSED
- 99BG NMA 1 COVER LETTER
- APPLICATIONFORMREDACTED
- RSHP-P-0003-RP-XX_LOW RES_PAGE 1-26
- RSHP-P-0003-RP-XX_LOW RES_PAGE 58-86
- SOUTH ELEVATION EXTERNAL CORE PROPOSED
- SECTION BB PROPOSED
- SECTION AA PROPOSED
- SECTION WINTER GARDENS PROPOSED
- LEVEL 53 PLAN GA PROPOSED
- LEVEL 28 PLAN GA PROPOSED
- LEVEL 29 PLAN GA PROPOSED
- LEVEL 30 PLAN GA PROPOSED
- LEVEL 31 PLAN GA PROPOSED
- RSHP-P-0003-RP-XX_LOW RES_PAGE 27-32
- 99 BISHOPSGATE NMA_EIA CONFORMITY LETTER
- 261023_99 BG_NMA TRANSPORT NOTE_2.0
- EAST ELEVATION EXTERNAL CORE INTERFACES PROPOSED
- SOUTH ELEVATION EXTERNAL CORE PROPOSED
- NORTH ELEVATION TYPICAL FLOOR EXTERNAL TERRACE PROPOSED
- NORTH ELEVATION TYPICAL FLOORS PROPOSED
- NORTH ELEVATION TYPICAL FLOOR -HIGH LEVEL TERRACE PROPOSED
- NORTHEAST ELEVATION CYCLE HUB PROPOSED
- DETAIL BAY NORTH ELEVATION LOWER LEVELS PROPOSED
- DETAIL BAY SOUTH ELEVATION EXTERNAL CORE PROPOSED
- PAVILION AND CYCLE HUB ELEVATION
- PROPOSED EAST ELEVATION
- LEVEL 57 PLAN GA PROPOSED
- LEVEL 58 PLAN GA PROPOSED
- PUBLIC ARCADE SOFFITS GA PROPOSED
- RSHP-P-3000-P-00
- BASEMENT LEVEL 2 PLAN GENERAL ARRANGEMENT PROPOSED
- LEVEL 08 PLAN GA PROPOSED
- LEVEL 09 PLAN GA PROPOSED
- LEVEL 07 PLAN GA PROPOSED
- LEVEL 10 PLAN GA PROPOSED
- LEVEL 11 PLAN GA PROPOSED
- LEVEL 12 PLAN GA PROPOSED
- LEVEL 15 PLAN GA PROPOSED
- LEVEL 14 PLAN GA PROPOSED
- LEVEL 13 PLAN GA PROPOSED
- LEVEL 16 PLAN GA PROPOSED
- LEVEL 19 PLAN GA PROPOSED
- LEVEL 22 PLAN GA PROPOSED
- LEVEL 24 PLAN GA PROPOSED
- LEVEL 25 PLAN GA PROPOSED
- LEVEL 26 PLAN GA PROPOSED
- LEVEL 27 PLAN GA PROPOSED
- LEVEL 38 PLAN GA PROPOSED
- 261021-R02-LO23120-99 BISHOPSGATE LONDON PLAN FIRE STATEMENT-OF-CIC
- PHASE 1 EARLY IMPLEMENTATION WORKS PLAN
- PHASE 0 EARLY IMPLEMENTATION WORKS PLAN
- PHASE 2 EARLY IMPLEMENTATION WORKS PLAN
- PHASE 0 PHASING PLAN
- PHASE 1 PHASING PLAN
- PROPOSED WEST ELEVATION
- PROPOSED NORTH ELEVATION
- PROPOSED SOUTH ELEVATION
- PROPOSED ELEVATION IN CONTEXT NORTH
- PROPOSED ELEVATION IN CONTEXT NORTH
- PROPOSED ELEVATION IN CONTEXT SOUTH WEST
- LEVEL 52 PLAN GA PROPOSED
- LEVEL 50 PLAN GA PROPOSED
- LEVEL 55 PLAN GA PROPOSED
- BASEMENT LEVEL 3 PLAN GENERAL ARRANGEMENT PROPOSED
- BASEMENT LEVEL 1 PLAN GENERAL ARRANGEMENT PROPOSED
- LEVEL 01 PLAN GA PROPOSED
- LEVEL 02 PLAN GA PROPOSED
- GROUND FLOOR PLAN GENERAL ARRANGEMENT PROPOSED
- LEVEL 04 PLAN GA PROPOSED
- LEVEL 03 PLAN GA PROPOSED
- LEVEL 06 PLAN GA PROPOSED
- LEVEL 05 PLAN GA PROPOSED
- LEVEL 21 PLAN GA PROPOSED
- LEVEL 23 PLAN GA PROPOSED
- LEVEL 20 PLAN GA PROPOSED
- LEVEL 18 PLAN GA PROPOSED
- LEVEL 17 PLAN GA PROPOSED
- LEVEL 36 PLAN GA PROPOSED
- LEVEL 39 PLAN GA PROPOSED
- 99BG NMA CIL FORM 1
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided amendment applications in a median of 71 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
99 Bishopsgate London EC2M 3XD
99% historically approved · decision due ~11 Jan
Submission of Local Procurement Strategy and the Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraphs 2.1 and 3.2 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
Awaiting decision Demolition 3 docs -
99 Bishopsgate London EC2M 3XD
99% historically approved · decision due ~25 Dec
Submission of Construction Methodology and Construction Management Strategy pursuant to Condition 42 & 45 of planning permission 24/00836/FULEIA dated 28.10.2025.
Awaiting decision -
99 Bishopsgate London EC2M 3XD
99% historically approved · decision due ~25 Dec
Submission of details of Site Condition and Proposed Ground Levels Plan pursuant to condition 80 of Planning Permission 24/00836/FULEIA dated 28.10.2025.
Awaiting decision -
99 Bishopsgate London EC2M 3XD
Installation and display of external window vinyls in relation to the National Gallery Faces of a City Exhibition.
Granted Windows or glazing -
99 Bishopsgate London EC2M 3XD
Submission of details of a Desk Based Contamination Investigation and Factual Ground Investigation Report pursuant to condition 29 of planning permission 24/00836/FULEIA dated 28.10.2025.
Granted 16 docs -
99 Bishopsgate London EC2M 3XD
Submission of details of a Pre-demolition Audit pursuant to condition 46(a) of Planning permission 24/00836/FULEIA dated 28.10.2025.
Granted Demolition 3 docs
Other amendment applications
In City of London
-
26/01138/NMA Granted
63 St Mary Axe London EC3A 8AA
Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 25/00223/FULEIA dated 19th December 2025 to allow for the introduction of a phasing plan consisting of three phases (including early works) via an additional condition and the amendment of Conditions 9, 10, 15, 16, 18, 23, 24, 26, 28, 30, 31, 34, 36, 45, 53, 57, 66, 68 and 77 to reference the proposed phasing plan and to amend conditions 49 (Cycle Parking), 76 (Uses) and 79 (Approved Drawings) to allow for design changes including: (i) reduction in basement extent from 6 to 4 levels, (ii) alterations to plant, (iii) reduction in long stay cycle parking; (iv) façade alterations; (v) and all associated changes.
-
26/01377/NMA Granted
London Stock Exchange 10 Paternoster Square London EC4M 7DY
Application for non-material amendment under S96A of the Town and Country Planning Act 1990 (as amended) of planning permission ref. 25/01245/FULL dated 6 February 2026 to make the following amendments: adjustments to the northern and southern entrances, revisions to the balconies, amendments to the rooftop extensions, reconfiguration of roof level plant and associated landscaping, and revisions to the basement layout and associated works.
-
26/01453/NMA Granted
1 Appold Street London EC2A 2UU
Non-material amendment under s.96A of the Town and Country Planning Act 1990 (as amended) to amend Condition 63 (Approved Drawings) of Planning permission ref: 22/01200/FULMAJ dated 07.10.2024 [as amended by ref: 25/00941/NMA, dated 24.07.2025; ref: 25/01361/NMA, dated 25.11.2025; and ref: 26/00376/NMA, dated 23.03.2026] to accommodate design changes including: replacement of five existing sliding doors to the private balconies with one sliding door and the introduction of pass doors to the balconies on levels 3 - 12.
-
26/01508/NMA Granted
Barbican Centre And Pavement Outside The Service Road Entrance Silk Street London EC2Y 8DS
Non-Material Amendment under Section 96a of the Town and Country Planning Act (1990) (as amended) to planning permission Ref. 25/00917/FULL dated 24 February 2026 to amend condition 22 (TfL Infrastructure) to enable a phased discharge of the condition.
-
26/01602/NMA Awaiting decision
59 Carter Lane London EC4V 5AQ
Non-Material Amendment under S96A of the Town and Country Planning Act 1990 (as amended) to planning permission 24/01004/FULL dated 18.03.2025 (as amended by permission ref. 26/00990/NMA, 30.09.2026) to vary Condition 17 (approved plans) in order to allow the relocation of the refuse and recycling storage to the top of the now redundant vehicular ramp.