Planning application
99 Bishopsgate London EC2M 3XD
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Submission of Construction Methodology and Construction Management Strategy pursuant to Condition 42 & 45 of planning permission 24/00836/FULEIA dated 28.10.2025.
As published by the council, reference 26/01551/MDC
Application record
- Reference
- 26/01551/MDC
- Status
- Under Consideration
- Received
- 30 Oct 2026
- Validated
- 30 Oct 2026
- Postcode
- EC2M 3XD
Site history
Applications at this address on the City of London register
This site has had 13 applications since 2021: 8 approved, 0 refused.
-
26/01663/PODC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of Local Procurement Strategy and the Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraphs 2.1 and 3.2 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
-
26/01549/MDC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of details of Site Condition and Proposed Ground Levels Plan pursuant to condition 80 of Planning Permission 24/00836/FULEIA dated 28.10.2025.
-
26/01519/NMA Awaiting decision
99 Bishopsgate London EC2M 3XD
Application for non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 24/00836/FULEIA (dated 28.10.2025) for the following works: (a) Amendment to condition 99 (Approved Drawings) for design changes including (i) adjustment to building location within the site (ii) changes to exit locations at ground level and associated alteration to City Market floorspace (iii) increase in height of cycle hub roof by 1.4m (iv) increase in height of main building by 400mm (v) removal of columns at ground floor (vi) introduction of new public route (vii) façade changes to structural beams, and (viii) other associated works; (b) Amendment to Description of Development to reflect proposed phasing of the development; (c) Introduction of new condition related to phasing of the development; (d) Amendment to Condition 3 (Servicing Bay Headroom) to reduce the headroom to 3.7m; (e) Amendment to Condition 61 (Building Height) to accommodate changes; (f) Amendment to Condition 87 (Fire Strategy) to update the document reference; (g) Amendment to Condition 88 (Approved Floorspace) to reflect the changes; and (h) Associated amendments to conditions 17, 20, 21, 22, 29, 34, 36, 37, 39, 40, 44, 45, 46, 48, 50, 52, 59, 73, 77, 78, 79, 80, 81, 82, 93, 94, and 95 to reflect the above changes.
-
26/01473/PODC Granted
99 Bishopsgate London EC2M 3XD
Submission of Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraphs 6.1 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
-
26/01201/ADVT Granted
99 Bishopsgate London EC2M 3XD
Installation and display of external window vinyls in relation to the National Gallery Faces of a City Exhibition.
-
26/00572/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a written scheme of investigation pursuant to condition 36 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00564/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a Desk Based Contamination Investigation and Factual Ground Investigation Report pursuant to condition 29 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00563/MDC Granted
99 Bishopsgate London EC2M 3XD
Submission of details of a Pre-demolition Audit pursuant to condition 46(a) of Planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00562/MDC Awaiting decision
99 Bishopsgate London EC2M 3XD
Submission of details of an Arboricultural Impact Assessment pursuant to condition 95 of planning permission 24/00836/FULEIA dated 28.10.2025.
-
26/00629/PODC Granted
99 Bishopsgate London EC2M 3XD
Submission of Television Interference Survey and Survey Area Map pursuant to Schedule 3 Paragraphs 12.1.1 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
Timeline
Dates from the published record
-
30 Oct 2026
Received by City of London
-
9 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of London took a median of 86 days over the applications it decided in the last year.
What happens while it is decided
This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London's median decision took 86 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
99 Bishopsgate London EC2M 3XD
99% historically approved · decision due ~11 Jan
Submission of Local Procurement Strategy and the Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraphs 2.1 and 3.2 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
Awaiting decision Demolition 3 docs -
99 Bishopsgate London EC2M 3XD
99% historically approved · decision due ~25 Dec
Submission of details of Site Condition and Proposed Ground Levels Plan pursuant to condition 80 of Planning Permission 24/00836/FULEIA dated 28.10.2025.
Awaiting decision -
99 Bishopsgate London EC2M 3XD
Installation and display of external window vinyls in relation to the National Gallery Faces of a City Exhibition.
Granted Windows or glazing -
99 Bishopsgate London EC2M 3XD
Submission of details of a Desk Based Contamination Investigation and Factual Ground Investigation Report pursuant to condition 29 of planning permission 24/00836/FULEIA dated 28.10.2025.
Granted 16 docs -
99 Bishopsgate London EC2M 3XD
Submission of details of a Pre-demolition Audit pursuant to condition 46(a) of Planning permission 24/00836/FULEIA dated 28.10.2025.
Granted Demolition 3 docs -
99 Bishopsgate London EC2M 3XD
Submission of Television Interference Survey and Survey Area Map pursuant to Schedule 3 Paragraphs 12.1.1 of the Section 106 Agreement dated 27 October 2025 (Planning Application Ref: 24/00836/FULEIA).
Granted 3 docs