Skip to content
PlanIndex Get alerts
Menu

Planning application

65 Fleet Street London EC4Y 1HT

Granted City of London 24/00649/LBC Listed Building Consent

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External and Internal alterations to The Tipperary Pub including part demolition of the rear of the pub; erection of 1 storey roof extension containing student accommodation with associated expansion into northern block of 65 Fleet Street at fifth floor level. Works to improve access to Whitefriars Crypt with changes to the surrounding structure of the Crypt to allow for presentation and interpretation of the asset.

As published by the council, reference 24/00649/LBC

Application record

Reference
24/00649/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Approved
Received
21 Jun 2024
Validated
21 Jun 2024
Decided
20 Dec 2024
Ward
Castle Baynard
Decision by
Delegated
Postcode
EC4Y 1HT

Site history

Applications at this address on the City of London register

This site has had 39 applications since 2022: 31 approved, 0 refused.

  • 26/01309/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of details of all exposed flank or party walls pursuant to Condition 31 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 18 Sep 2026
  • 26/01080/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of Construction Logistics Plan and Construction Phase Plan pursuant to discharge of Condition 13 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 14 Oct 2026
  • 26/01038/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 6 (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 26/01036/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 7 parts (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 26/01009/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of drawings of room layouts pursuant to discharge of Condition 35 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 16 Jul 2026
  • 25/01765/PODC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).

    Submitted 5 Dec 2025
  • 25/01605/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01611/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 3 Mar 2026 Conditions
  • 25/01487/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a detailed Whole Life-Cycle Carbon assessment covering as-approved design stage pursuant to condition 8 (part A) of planning permission 24/00648/FULMAJ (as amended by 25/00663/NMA) dated 18/12/2024.

    Decided 14 Jan 2026 Conditions
  • 25/01490/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a method statement setting out the methodology for the safe removal, storage and reinstatement of the wooden panelling located on the rear wall of the ground floor bar of The Tipperary pursuant to condition 9 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development

Timeline

Dates from the published record

  1. 21 Jun 2024

    Received by City of London

  2. 20 Dec 2024

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

7 later applications on the register refer to this one:

  • 26/01038/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 6 (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 26/01036/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 7 parts (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 25/01605/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01490/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a method statement setting out the methodology for the safe removal, storage and reinstatement of the wooden panelling located on the rear wall of the ground floor bar of The Tipperary pursuant to condition 9 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01489/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the Tipperary Pub during the building work pursuant to condition 4 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01491/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect the windows during the building work, particularly the historic window glass, pursuant to condition 13 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01479/LDC Withdrawn

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the Tipperary Pub during the building work; a method statement setting out the methodology for the safe removal, storage and reinstatement of the wooden panelling located on the rear wall of the ground floor bar of The Tipperary; and details to ensure that precautions are taken to secure and protect the windows during the building work, particularly the historic window glass, pursuant to conditions 4, 9 and 13 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 18 Nov 2025 Lawful development
  • Application: 24/00648/FULMAJ (Decided)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,602 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Whitefriars Ltd Applicant

8 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

304 documents on file for this application

  • LISTED BUILDING CONSENT (CONDITIONAL) Decision · 20 Dec 2024
  • HIGH RES PHOTOGRAPHS Photograph · 08 Oct 2024
  • LANDSCAPE PLANNING STATEMENT Accompanying report · 08 Oct 2024
  • URBAN GREENING GROUND & LOWER GROUND Drawing · 08 Oct 2024
  • URBAN GREENING PBSA TERRACE & BROWN ROOF SYSTEMS Drawing · 08 Oct 2024
  • ILLUSTRATIVE PLAN ROOF LEVELS Drawing · 08 Oct 2024
  • LABELLED PHOTOGRAPHS Photograph · 08 Oct 2024
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 02 Oct 2024
  • LEVELLGPLANNINGPLAN-S2-P15 Drawing · 18 Sep 2024
  • LEVELB1PLANNINGPLAN-S2-P14 Drawing · 18 Sep 2024
  • LEVEL10PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL07PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL06PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL05PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL04PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL03PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL02PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL01PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL00PLANNINGPLAN-S2-P13 Drawing · 18 Sep 2024
  • LANDSCAPE DESIGN STATEMENT Delete Doc · 18 Sep 2024
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 18 Sep 2024
  • GATEWAY 1 FIRE STATEMENT FORM Other · 18 Sep 2024
  • PART 1 - DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 18 Sep 2024
  • LEVEL09PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL08PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • PLANNING FIRE STATEMENT FORM Other · 18 Sep 2024
  • PART 2 - DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 18 Sep 2024
  • COVER LETTER Cover Letter · 18 Sep 2024
  • HTVIA Accompanying report · 17 Sep 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Drawing · 17 Sep 2024
  • PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET Drawing · 17 Sep 2024
  • PLANNING STATEMENT Delete Doc · 17 Sep 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 17 Sep 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET Drawing · 17 Sep 2024
  • DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET Drawing · 17 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET Drawing · 17 Sep 2024
  • TIPPERARYPROPOSEDSECTION03-S2-P02 Drawing · 11 Sep 2024
  • TIPPERARYLEVEL00COMPOSITEDEMOLITIONPLANNINGPLAN-PL-P03 Drawing · 11 Sep 2024
  • SUBMISSION ADDENDUM LETTER 29.08.24 Correspondence In · 11 Sep 2024
  • TIPPERARYLEVEL00PLANNINGPLANS-S2-P05 Drawing · 11 Sep 2024
  • TIPPERARYDEMOLITIONSECTION03-S2-P02 Drawing · 11 Sep 2024
  • TIPPERARYPROPOSEDSECTION02-S2-P03 Drawing · 11 Sep 2024
  • TIPPERARYEXISTINGSECTION02-S2-P03 Drawing · 11 Sep 2024
  • SUBMISSION ADDENDUM LETTER Correspondence In · 30 Aug 2024
  • REVISED HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 30 Aug 2024
  • PLANNING FIRE STATEMENT FORM Accompanying report · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 07 PASSAGEWAY ELEVATIONS Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 00 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 02 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 03 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 04 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 05 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 06 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL LG PLANNING PLAN Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 08 PASSAGEWAY ELEVATIONS Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 30 Aug 2024
  • INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT Report - Daylight/Sunlight Report · 30 Aug 2024
  • FIRE STATEMENT FORM Other · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 01 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 08 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 09 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 10 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL B1 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LANDSCAPE PLANNING STATEMENT Accompanying report · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 07 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 06 Aug 2024
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 06 Aug 2024
  • TIPPERARYDEMOLITIONSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION03 Drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYEXISTINGSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYEXISTINGSECTION02 Superseded drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION02 Drawing · 25 Jul 2024
  • TIPPERARYEXISTINGSECTION03 Drawing · 25 Jul 2024
  • PART 3 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 1 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • THECRYPTEXISTINGFLOORPLANS Drawing · 15 Jul 2024
  • PART 8 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 7 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 5 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 4 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • SITELOCATIONPLAN Site Plan · 15 Jul 2024
  • TIPPERARYDEMOLITIONSECTION01 Superseded drawing · 15 Jul 2024
  • TIPPERARYEXISTINGSECTION03 Superseded drawing · 15 Jul 2024
  • TIPPERARYPROPOSEDSECTION03 Superseded drawing · 15 Jul 2024
  • PART 2 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • TIPPERARYEXISTINGSECTION02 Superseded drawing · 15 Jul 2024
  • TIPPERARYEXISTINGSECTION01 Superseded drawing · 15 Jul 2024
  • TIPPERARYPROPOSEDSECTION02 Superseded drawing · 15 Jul 2024
  • PART 6 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • THECRYPTFLOORPLANS Drawing · 15 Jul 2024
  • PART 1 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REPORT ADDENDUM Accompanying report · 15 Jul 2024
  • PART 2 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT REPORT ADDENDUM Accompanying report · 15 Jul 2024
  • EXISTINGSITEPLAN Site Plan · 15 Jul 2024
  • TIPPERARYPROPOSEDSECTION0 Superseded drawing · 15 Jul 2024
  • TIPPERARYLEVEL0405PLANNINGPLANS Drawing · 15 Jul 2024
  • OUTLINE SCHEDULE OF WORK Accompanying report · 15 Jul 2024
  • HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 01 Jul 2024
  • UTILITY INFRASTRUCTURE REPORT Accompanying report · 21 Jun 2024
  • OUTDOOR THERMAL COMFORT REPORT Accompanying report · 21 Jun 2024
  • WIND MICRO CLIMATE ASSESSMENT REPORT Accompanying report · 21 Jun 2024
  • CULTURAL PLAN Accompanying report · 21 Jun 2024
  • EQUALITIES IMPACT STATEMENT Accompanying report · 21 Jun 2024
  • HEALTH IMPACT ASSESSMENT FINAL Accompanying report · 21 Jun 2024
  • SOCIO-ECONOMIC STATEMENT Accompanying report · 21 Jun 2024
  • STUDENT MANAGEMENT PLAN (1) Accompanying report · 21 Jun 2024
  • SITE PLAN Drawing · 21 Jun 2024
  • LEVEL 00 EXISTING PLAN Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 00 EXISTING PLANS Drawing · 21 Jun 2024
  • LEVEL 00 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • TIPPERARY LEVEL 00 PLANNING PLANS Superseded drawing · 21 Jun 2024
  • TIPPERARY LEVEL 00 DEMOLITION PLANS Drawing · 21 Jun 2024
  • LEVEL 00 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 01 EXISTING PLAN Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 01 EXISTING PLANS Drawing · 21 Jun 2024
  • LEVEL 01 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • TIPPERARY LEVEL 01 PLANNING PLANS Drawing · 21 Jun 2024
  • LEVEL 02 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 03 EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL 03 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 03 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 04 EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL 04 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 04 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 05 EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL 05 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 05 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 06 EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL 06 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 06 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 07 EXISTING PLAN Drawing · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1.5 Accompanying report · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1.6 Accompanying report · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1 Accompanying report · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1.2-PDF Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART1 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 2 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 3 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 4 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 5 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART6 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 7 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 8 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 9 Accompanying report · 21 Jun 2024
  • LEVEL 04 GENERAL ARRANGENT Drawing · 21 Jun 2024
  • LEVEL 05 & 06 GENERAL ARRANGENT Drawing · 21 Jun 2024
  • LEVEL 07 GENERAL ARRANGEMENT Drawing · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART13 Accompanying report · 21 Jun 2024
  • ARCHAELOGICAL DESK BASED ASSESSMENT Accompanying report · 21 Jun 2024
  • ARCHAELOGICAL DESK BASED ASSESSMENT PART 2 Accompanying report · 21 Jun 2024
  • DESIGN ACCESS STATEMENT PART 1 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT - PART 3 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT -PART5 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT - PART 10 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN ACCESS STATEMENT - PART 11 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT - COMPRESSED PART 12 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT PART 4 Report - Design & Access Statement/Report · 21 Jun 2024
  • STUDENT NEED ASSESSMENT 12.06.2024V2 Accompanying report · 21 Jun 2024
  • CONSTRUCTION MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • CONSTRUCTION MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • FRAMEWORK TRAVEL PLAN Accompanying report · 21 Jun 2024
  • DELIVERY AND SERVICING MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • OPERATION WASTE MANAGEMENT STRATEGY Accompanying report · 21 Jun 2024
  • TRANSPORT ASSESSMENT Accompanying report · 21 Jun 2024
  • VENTILATION STRATEGY REV A Accompanying report · 21 Jun 2024
  • STATEMENT OF COMMUNITY INVOLVEMENT Accompanying report · 21 Jun 2024
  • FINANCIAL VIABILITY ASSESSMENT Accompanying report · 21 Jun 2024
  • SOLAR GLARE ASSESSMENT Accompanying report · 21 Jun 2024
  • DAYLIGHT, SUNLIGHT AND OVERSHADOWING Report - Daylight/Sunlight Report · 21 Jun 2024
  • DAYLIGHT, SUNLIGHT STATEMENT Accompanying report · 21 Jun 2024
  • SECURITY DAS Accompanying report · 21 Jun 2024
  • LIGHT CONCEPT FOR PLANNING Accompanying report · 21 Jun 2024
  • DEMOLION NORTH BLOCK FLEET STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH AND SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH AND SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION SOUTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION SOUTH BLOCK ASHENTREE COURTYARD ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH & SOUTH SECTION BLOCK AA Drawing · 21 Jun 2024
  • DEMOLITION NORTH & SOUTH BLOCK SECTIONS BB &CC Drawing · 21 Jun 2024
  • EXISTING NORTH BLOCK FLEET STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH AND SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH AND SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING SOUTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • EXISTING SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH AND SOUTH BLOCK SECTION AA Drawing · 21 Jun 2024
  • EXISTING NORTH AND SOUTH BLOCK SECTION BB AND CC Drawing · 21 Jun 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH AND SOUTH BLOCK WHITEFRIARS STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH AND SOUTH BLOCK BOUVERIE STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATIONS Superseded drawing · 21 Jun 2024
  • PROPOSED SOUTH BLOCK ELEVATION ASHENTREE COURTYARD ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATIONS Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH AND SOUTH BLOCK SECTION AA Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH AND SOUTH BLOCK SECTION BB AND CC Drawing · 21 Jun 2024
  • PROPOSED NORTH BUILDING CENTRAL LIGHTWELL ELEVATION Drawing · 21 Jun 2024
  • PROPOSED SOUTH BUILDING ATRIUM ELEVATIONS Drawing · 21 Jun 2024
  • TIPPERARY DEMOLITION SECTION 02 Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 01 DEMOLITION PLANS Drawing · 21 Jun 2024
  • LEVEL 01 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 02 EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL 02 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT - PART 6 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT PART 7 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN & ACCESS STATEMENT - PART 8 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN ACCESS STATEMENT - PART 9 Report - Design & Access Statement/Report · 21 Jun 2024
  • DESIGN AND ACCESS STATEMENT PART 2 Accompanying report · 21 Jun 2024
  • ENERGY AND SUSTAINABILITY ASSESSMENT Accompanying report · 21 Jun 2024
  • ENERGY STRATEGY REPORT PART 2 Accompanying report · 21 Jun 2024
  • ENERGY STRATEGY REPORT PART 3 Accompanying report · 21 Jun 2024
  • THE TIPPERARY_VISION Accompanying report · 21 Jun 2024
  • ACOUSTIC PLANNING REPORT Report - Acoustic/Noise Report · 21 Jun 2024
  • GIA AREA PLANS SCHEDULES Drawing · 21 Jun 2024
  • GEA AREA PLANS SCHEDULES Drawing · 21 Jun 2024
  • AIR QUALITY ASSESSMENT Accompanying report · 21 Jun 2024
  • ECOLOGICAL APPRAISAL Accompanying report · 21 Jun 2024
  • FIRE STATEMENT Accompanying report · 21 Jun 2024
  • PLANNING FIRE STATEMENT FORM Accompanying report · 21 Jun 2024
  • WHOLE LIFE CYCLE CARBON ASSESSMENT Accompanying report · 21 Jun 2024
  • WLCA_ASSESSMENT Accompanying report · 21 Jun 2024
  • CIRCULAR ECONOMY STATEMENT Accompanying report · 21 Jun 2024
  • TIPPERARY DEMOLITION SECTION 03 Superseded drawing · 21 Jun 2024
  • TIPPERARY LEVEL 0203 DEMOLITION PLANS Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 0405 DEMOLITIONPLANS Drawing · 21 Jun 2024
  • LEVEL 07 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 07 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL 08 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 08 ROOF DEMOLITIONPLAN Drawing · 21 Jun 2024
  • LEVEL 09 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL 10 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL RF PLANNING PLAN Drawing · 21 Jun 2024
  • LEVEL B1 EXISTING PLAN Drawing · 21 Jun 2024
  • TIPPERARY LEVEL B1 EXISTINGPLANS Drawing · 21 Jun 2024
  • LEVEL B1 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • TIPPERARY LEVEL B1 PLANNING PLANS-PL-P04 Drawing · 21 Jun 2024
  • TIPPERARY LEVEL B1 DEMOLITION PLANS Drawing · 21 Jun 2024
  • LEVEL B1 DEMOLITION PLAN Drawing · 21 Jun 2024
  • LEVEL LG EXISTING PLAN Drawing · 21 Jun 2024
  • LEVEL LG PLANNING PLAN Superseded drawing · 21 Jun 2024
  • LEVEL LG DEMOLITION PLAN Drawing · 21 Jun 2024
  • TRANSMITTALRECORD Accompanying report · 21 Jun 2024
  • TIPPERARY LEVEL 0203 EXISTING PLANS Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 0405 EXISTING PLANS Drawing · 21 Jun 2024
  • TIPPERARY LEVEL 0203 PLANNING PLANS Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1.3-PDF Accompanying report · 21 Jun 2024
  • LANDSCAPING DESIGN STATEMENT 1.4-PDF Accompanying report · 21 Jun 2024
  • AIR QUALITY ASSESSMENT Accompanying report · 21 Jun 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 20 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 65 Fleet Street London EC4Y 1HT

    24/00756/MDC Submitted 16 Jul 2024 50 yards away

    Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 5 of planning permission 21/00709/FULMAJ dated 17/05/2022.

    Granted Conditions 45 docs
  • 65 Fleet Street London EC4Y 1HT

    24/00757/MDC Submitted 16 Jul 2024 50 yards away

    Submission of a Deconstruction Logistics Plan to manage all freight vehicle movements to and from the site during deconstruction of the existing building(s) pursuant to condition 4 of planning permission 21/00709/FULMAJ dated 17/05/2022.

    Granted Conditions 46 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01605/LDC Submitted 17 Nov 2025 50 yards away

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.

    Granted Lawful development 3 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01611/MDC Submitted 17 Nov 2025 50 yards away

    Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Granted Conditions 11 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01765/PODC Submitted 5 Dec 2025 50 yards away

    99% historically approved · decision due ~30 Jan

    Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).

    Awaiting decision 3 docs
  • 65 Fleet Street London EC4Y 1HT

    24/00648/FULMAJ Submitted 21 Jun 2024 50 yards away

    Partial demolition and refurbishment and extension of buildings to provide: purpose-built student accommodation (Sui Generis) comprising 856 rooms; extension of up to two storeys for the north block (up to 37.24m AOD) and up to four storeys for the south block (up to 55.465m AOD) with provision of roof terraces; provision of cultural uses (learning and non-residential institution uses, Use Class F1); provision of commercial uses including retail (Use Class E); external alterations and extension to the Tipperary Pub (Sui Generis); enhancements to Whitefriars Crypt; public realm works including to passageway and Courtyard; hard and soft landscaping; and associated works.

    Granted Full applications Extension Demolition 343 docs
    Major scheme

In City of London

  • 24/01057/LBC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Installation of 2x lanterns with hub branding and one internally illuminated sign.

    Received 2 Oct, published by the council 21 Oct 2026 Heritage and listed buildings
  • 26/01222/LBC Granted

    Rising Sun Public House 61 Carter Lane London EC4V 5DY

    Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays

    Received 27 Aug, published by the council 8 Sep 2026 Heritage and listed buildings
  • 26/01179/LBC Granted

    Shaws Booksellers Public House 31 - 34 St Andrew's Hill London EC4V 5DE

    Alterations to a Listed building including: (i) installation of externally illuminated fascia signage, projecting signage and menu signs (ii) installation of nine awnings.

    Received 17 Aug, published by the council 26 Aug 2026 Heritage and listed buildings
  • 26/01167/LBC Granted

    4 Frederick's Place London EC2R 8AB

    1 x wall mounted non illuminated polished brass plaque.

    Received 13 Aug, published by the council 19 Aug 2026 Heritage and listed buildings
  • 26/00489/LBC Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Heritage and listed buildings