Planning application
65 Fleet Street London EC4Y 1HT
Works: Extension Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Partial demolition and refurbishment and extension of buildings to provide: purpose-built student accommodation (Sui Generis) comprising 856 rooms; extension of up to two storeys for the north block (up to 37.24m AOD) and up to four storeys for the south block (up to 55.465m AOD) with provision of roof terraces; provision of cultural uses (learning and non-residential institution uses, Use Class F1); provision of commercial uses including retail (Use Class E); external alterations and extension to the Tipperary Pub (Sui Generis); enhancements to Whitefriars Crypt; public realm works including to passageway and Courtyard; hard and soft landscaping; and associated works.
As published by the council, reference 24/00648/FULMAJ
Application record
- Reference
- 24/00648/FULMAJ
- Type
- Full Major Application
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 21 Jun 2024
- Validated
- 21 Jun 2024
- Decided
- 18 Dec 2024
- Ward
- Castle Baynard
- Decision by
- Delegated
- Postcode
- EC4Y 1HT
Site history
Applications at this address on the City of London register
This site has had 39 applications since 2022: 31 approved, 0 refused.
-
26/01309/MDC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of details of all exposed flank or party walls pursuant to Condition 31 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
26/01080/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of Construction Logistics Plan and Construction Phase Plan pursuant to discharge of Condition 13 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
26/01038/LDC Granted
65 Fleet Street London EC4Y 1HT
Submission of details of condition survey and method statement pursuant to Condition 6 (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.
-
26/01036/LDC Granted
65 Fleet Street London EC4Y 1HT
Submission of details of condition survey and method statement pursuant to Condition 7 parts (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.
-
26/01009/MDC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of drawings of room layouts pursuant to discharge of Condition 35 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
25/01765/PODC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).
-
25/01605/LDC Granted
65 Fleet Street London EC4Y 1HT
Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.
-
25/01611/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01487/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a detailed Whole Life-Cycle Carbon assessment covering as-approved design stage pursuant to condition 8 (part A) of planning permission 24/00648/FULMAJ (as amended by 25/00663/NMA) dated 18/12/2024.
-
25/01490/LDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a method statement setting out the methodology for the safe removal, storage and reinstatement of the wooden panelling located on the rear wall of the ground floor bar of The Tipperary pursuant to condition 9 of planning permission 24/00649/LBC dated 20/12/2024.
Timeline
Dates from the published record
-
21 Jun 2024
Received by City of London
-
18 Dec 2024
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
15+ later applications on the register refer to this one:
-
26/01309/MDC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of details of all exposed flank or party walls pursuant to Condition 31 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
26/01080/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of Construction Logistics Plan and Construction Phase Plan pursuant to discharge of Condition 13 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
26/01009/MDC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of drawings of room layouts pursuant to discharge of Condition 35 of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
25/01765/PODC Awaiting decision
65 Fleet Street London EC4Y 1HT
Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).
-
25/01611/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01487/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a detailed Whole Life-Cycle Carbon assessment covering as-approved design stage pursuant to condition 8 (part A) of planning permission 24/00648/FULMAJ (as amended by 25/00663/NMA) dated 18/12/2024.
-
25/01493/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a detailed Circular Economy Statement; and an updated detailed Circular Economy Statement, to include a site waste management plan pursuant to condition 4 (part B) and 6 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01492/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a Climate Change Resilience Sustainability Statement pursuant to condition 23 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01426/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of details of the utility connection requirements pursuant to condition 9 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01343/MDC Granted
65 Fleet Street London
Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 13 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01345/MDC Granted
65 Fleet Street London
Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects during construction pursuant to condition 5 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/01344/MDC Granted
65 Fleet Street London
Submission of details of all proposed internal lifts pursuant to condition 19 of planning permission 24/00648/FULMAJ dated 18/12/2024.
-
25/00999/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of Stage 4 Whole Life Carbon Assessment pursuant to discharge of Condition 8(b) as-approved design stage of planning permission 24/00648/FULMAJ dated 18.12.2024.
-
25/01000/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of Counter Terrorism Risk Assessment pursuant to discharge of Condition 16 planning permission 24/00648/FULMAJ dated 18.12.2024.
-
25/01004/MDC Granted
65 Fleet Street London EC4Y 1HT
Submission of a Drainage Statement pursuant to the discharge of Condition 24 of planning permission 24/00648/FULMAJ dated 18.12.2024.
- Application: 24/00649/LBC (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,604 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordWhitefriars Ltd Applicant
8 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
343 documents on file for this application
- SECTION 106 AGREEMENT
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- APPLICATION FORM
- PROPOSED NORTH BLOCK FLEET STREET ELEVATION
- NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- PROPOSED NORTH BLOCK COURTYARD ELEVATION
- PROPOSED NORTH BLOCK FLEET STREET ELEVATION
- PROPOSED SOUTH BLOCK COURTYARD ELEVATION
- PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION
- AGENT COMMENTS RE TFL
- REPRESENTATION - OLIVER SELLS
- REPRESENTATION - NHS LONDON HEALTHY URBAN DEVELOPMENT UNIT
- COMMENTS - CCAAC
- CIL FORM
- COMMENTS - THE GARDEN TRUST
- HIGH RES PHOTOGRAPHS
- LANDSCAPE PLANNING STATEMENT
- ILLUSTRATIVE PLAN ROOF LEVELS
- URBAN GREENING GROUND & LOWER GROUND
- URBAN GREENING PBSA TERRACE & BROWN ROOF SYSTEMS
- LABELLED PHOTOGRAPHS
- COMMENTS-HISTORIC ENGLAND
- REPRESENTATION - THE INNS OF COURT COLLEGE OF ADVOCACY
- COMMENTS - THAMES WATER
- COMMENTS - THAMES WATER
- APPLICANTS RESPONSE TO TFL COMMENTS
- PROPOSED NORTH BLOCK COURTYARD ELEVATION
- PROPOSED SOUTH BLOCK COURTYARD ELEVATION
- PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N
- PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT
- PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION
- PROPOSED NORTH BLOCK FLEET STREET ELEVATION
- PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD
- PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET
- PROPOSED NORTH BLOCK BAY STUDY 08 PASSAGEWAY ELEVATIONS
- PROPOSED NORTH BLOCK BAY STUDY 07 PASSAGEWAY ELEVATIONS
- PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET
- PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET
- PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET
- PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET
- PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD
- PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET
- PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET
- LEVELB1PLANNINGPLAN-S2-P14
- LEVEL10PLANNINGPLAN-S2-P10
- LEVEL09PLANNINGPLAN-S2-P09
- LEVEL08PLANNINGPLAN-S2-P09
- LEVEL07PLANNINGPLAN-S2-P10
- LEVEL06PLANNINGPLAN-S2-P10
- LEVEL05PLANNINGPLAN-S2-P10
- LEVEL04PLANNINGPLAN-S2-P09
- LEVEL00PLANNINGPLAN-S2-P13
- PART 1 - DESIGN & ACCESS STATEMENT ADDENDUM
- PART 2 - DESIGN & ACCESS STATEMENT ADDENDUM
- PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET
- LEVELLGPLANNINGPLAN-S2-P15
- LEVEL03PLANNINGPLAN-S2-P10
- LEVEL01PLANNINGPLAN-S2-P09
- GATEWAY 1 FIRE STATEMENT FORM
- COVER LETTER
- LEVEL02PLANNINGPLAN-S2-P10
- DAYLIGHT AND SUNLIGHT REPORT
- PLANNING FIRE STATEMENT FORM
- DESIGN AND ACCESS STATEMENT
- HTVIA
- PLANNING STATEMENT
- REPRESENTATION - FLEET STREET QUARTER
- COMMENTS - NATS
- TIPPERARYPROPOSEDSECTION02-S2-P03
- TIPPERARYLEVEL00COMPOSITEDEMOLITIONPLANNINGPLAN-PL-P03
- TIPPERARYDEMOLITIONSECTION03-S2-P02
- TIPPERARYPROPOSEDSECTION03-S2-P02-S2-P02
- TIPPERARYEXISTINGSECTION02-S2-P03
- TIPPERARYLEVEL00PLANNINGPLANS-S2-P05
- SUBMISSION ADDENDUM LETTER 29.08.24
- COMMENTS-HEALTH AND SAFETY EXECUTIVE
- REPRESENTATION - DR JOHNSON?S HOUSE
- HTVIA ADDITIONAL IMAGES 9
- HTVIA ADDITIONAL IMAGES 8
- HTVIA ADDITIONAL IMAGES 7
- HTVIA ADDITIONAL IMAGES 6
- HTVIA ADDITIONAL IMAGES 5
- HTVIA ADDITIONAL IMAGES 4
- HTVIA ADDITIONAL IMAGES 3
- HTVIA ADDITIONAL IMAGES 2
- HTVIA ADDITIONAL IMAGES 1
- REPRESENTATION - GUILDHALL SCHOOL OF MUSIC & DRAMA
- DESIGN & ACCESS STATEMENT ADDENDUM
- SUBMISSION ADDENDUM LETTER
- REVISED HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- FIRE STATEMENT FORM
- PLANNING FIRE STATEMENT FORM
- PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET
- PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET
- PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET
- PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD
- PROPOSED NORTH BLOCK BAY STUDY 08 PASSAGEWAY ELEVATIONS
- PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET
- PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET
- PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD
- PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT
- PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- PROPOSED NORTH BLOCK FLEET STREET ELEVATION
- PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- PROPOSED NORTH BLOCK COURTYARD ELEVATION
- LEVEL 03 PLANNING PLAN
- LEVEL 04 PLANNING PLAN
- LEVEL 06 PLANNING PLAN
- LEVEL 07 PLANNING PLAN
- PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET
- PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET
- PROPOSED NORTH BLOCK BAY STUDY 07 PASSAGEWAY ELEVATIONS
- PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N
- PROPOSED SOUTH BLOCK COURTYARD ELEVATION
- LEVEL 01 PLANNING PLAN
- LEVEL 02 PLANNING PLAN
- LEVEL 08 PLANNING PLAN
- LEVEL 09 PLANNING PLAN
- LANDSCAPE PLANNING STATEMENT
- LEVEL 00 PLANNING PLAN
- LEVEL B1 PLANNING PLAN
- PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION
- LEVEL 05 PLANNING PLAN
- LEVEL 10 PLANNING PLAN
- LEVEL LG PLANNING PLAN
- COMMENTS - TFL
- REPRESENTATION -RUBY KAUR
- COMMENTS-THE GARDENS TRUST
- REPRESENTATION-ASHLEY GRANT
- REPRESENTATION - CHARLIE O'DONNELL
- REPRESENTATION-KISHAN THAWRANI
- REPRESENTATION-MARTIN BARNETT
- REPRESENTATION-KENDAL ATHERTON
- COMMENTS - THAMES WATER
- COMMENTS - THAMES WATER
- REPRESENTATION - NAJIB HAQQI
- COMMENTS - HISTORIC ENGLAND
- AGENT - RESPONSE
- REPRESENTATION-ANDY CONWAY
- REPRESENTATION-JAMES LI
- REPRESENTATION-ARTUR MIHALCEAN
- REPRESENTATION-ARDIT GJOKA
- REPRESENTATION-MATT RYAN
- REPRESENTATION-TEODORA BAKARDZHIEVA
- REPRESENTATION-GILLIAN JUPP
- REPRESENTATION-ASHLEY GRANT
- REPRESENTATION - CELAL KANIDAGLI
- COMMENTS - HEALTH AND SAFETY EXECUTIVE
- TIPPERARYEXISTINGSECTION01
- TIPPERARYDEMOLITIONSECTION01
- TIPPERARYPROPOSEDSECTION03
- TIPPERARYPROPOSEDSECTION02
- TIPPERARYPROPOSEDSECTION01
- TIPPERARYEXISTINGSECTION03
- TIPPERARYEXISTINGSECTION02
- TIPPERARYLEVEL0405DEMOLITIONPLANS
- PART 1 - DESIGN & ACCESS STATEMENT
- PART 4 - DESIGN & ACCESS STATEMENT
- PART 5 - DESIGN & ACCESS STATEMENT
- PART 6 - DESIGN & ACCESS STATEMENT
- PART 7 - DESIGN & ACCESS STATEMENT
- PART 8 - DESIGN & ACCESS STATEMENT
- LEVEL01EXISTINGPLAN
- LEVEL00DEMOLITIONPLAN
- TIPPERARYLEVEL00EXISTINGPLANS
- LEVEL06DEMOLITIONPLAN
- LEVEL06PLANNINGPLAN
- LEVEL05DEMOLITIONPLAN
- TIPPERARYLEVELB1DEMOLITIONPLANS
- TIPPERARYLEVELB1PLANNINGPLANS
- LEVELB1PLANNINGPLAN
- LEVEL07PLANNINGPLAN
- LEVEL07EXISTINGPLAN
- TIPPERARYLEVEL0203EXISTINGPLANS
- LEVELLGDEMOLITIONPLAN
- PART 2 - DESIGN & ACCESS STATEMENT
- TIPPERARYLEVEL00DEMOLITIONPLANS
- LEVEL02PLANNINGPLAN
- LEVEL02EXISTINGPLAN
- LEVELB1EXISTINGPLAN
- TIPPERARYLEVEL0405PLANNINGPLANS
- TIPPERARYLEVEL0203PLANNINGPLANS
- TIPPERARYLEVEL0405EXISTINGPLANS
- LEVELLGPLANNINGPLAN
- LEVELLGEXISTINGPLAN
- PART 3 - DESIGN & ACCESS STATEMENT
- PART 1 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- LEVEL01DEMOLITIONPLAN
- TIPPERARYLEVEL01DEMOLITIONPLANS
- LEVEL01PLANNINGPLAN
- TIPPERARYLEVEL01EXISTINGPLANS
- TIPPERARYLEVEL00PLANNINGPLANS
- LEVEL00PLANNINGPLAN
- LEVEL00EXISTINGPLAN
- SITELOCATIONPLAN
- LEVEL06EXISTINGPLAN
- LEVEL05PLANNINGPLAN
- LEVEL05EXISTINGPLAN
- LEVEL04DEMOLITIONPLAN
- LEVEL04DEMOLITIONPLAN
- LEVEL04EXISTINGPLAN
- LEVEL03DEMOLITIONPLAN
- LEVEL03PLANNINGPLAN
- LEVEL03EXISTINGPLAN
- LEVELRFPLANNINGPLAN
- LEVEL10PLANNINGPLAN
- LEVEL09PLANNINGPLAN
- LEVEL08ROOFDEMOLITIONPLAN
- LEVEL08PLANNINGPLAN
- LEVEL07DEMOLITIONPLAN
- PART 2 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT
- TIPPERARYLEVEL01PLANNINGPLANS
- LEVEL02DEMOLITIONPLAN
- LEVELB1DEMOLITIONPLAN
- TIPPERARYLEVELB1EXISTINGPLANS
- TIPPERARYLEVEL0203DEMOLITIONPLANS
- PART O ASSESSMENT REPORT PART O ASSESSMENT REPORT
- ENERGY AND SUSTAINABILITY ASSESSMENT
- SUSTAINABILITY STATEMENT WITH BREEAM SCORECARD
- FIRE STATEMENT FORM
- FLEET STREET UTILITY INFRASTRUCTURE REPORT
- OUTDOOR THERMAL COMFORT REPORT
- WIND MICROCLIMATE ASSESSMENT (CFD)
- CULTURAL PLAN
- EQUALITIES IMPACT STATEMENT
- HEALTH IMPACT ASSESSMENT
- SOCIO-ECONOMIC STATEMENT FINAL 17.06.24
- STUDENT MANAGEMENT PLAN (1)
- STUDENT NEED ASSESSMENT 12.06.2024V2
- CONSTRUCTION MANAGEMENT PLAN
- CONSTRUCTION LOGISTICS PLAN
- FRAMEWORK TRAVEL PLAN
- DELIVERY AND SERVICING MANAGEMENT PLAN
- OPERATION WASTE MANAGEMENT PLAN
- TRANSPORT ASSESSMENT
- VENTILATION STRATEGY REVA
- STATEMENT OF COMMUNITY INVOLVEMENT
- FINANCIAL VIABILITY ASSESSMENT - 31.05.24 (2)
- DAYLIGHT & SUNLIGHT SOLAR GLARE ASSESSMENT
- INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT
- DAYLIGHT & SUNLIGHT REPORT
- SECURITY DAS
- LIGHT CONCEPT FOR PLANNING
- PLANNING ACCESS STATEMENT
- DRAWING REGISTER
- DEMOLITION NORTH BLOCK FLEET STREET ELEVATION
- DEMOLITION NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- DEMOLITION NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- DEMOLITION SOUTH BLOCK COURTYARD ELEVATION
- DEMOLITION NORTH BLOCK COURTYARD ELEVATION
- DEMOLITION NORTH & SOUTH BLOCK SECTION A A
- DEMOLITION NORTH AND SOUTH BLOCK SECTIONS BB & CC
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED PASSAGEWAY ELEVATIONS
- PROPOSED PASSAGEWAY ELEVATIONS
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- LANDSCAPE PLANNING STATEMENT (PART 3)
- LANDSCAPE PLANNING STATEMENT (PART 4)
- LANDSCAPE PLANNING STATEMENT (PART 5)
- LANDSCAPE PLANNING STATEMENT (PART 6)
- LANDSCAPE PLANNING STATEMENT (PART 1)
- LANDSCAPE PLANNING STATEMENT (PART 2)
- FLOOD RISK ASSESSMENT A AND DRAINAGE STRATEGY PART 1
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 2
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 3
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 4
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 5
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 6
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 8
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 9
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY (1) (1)_PART10
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART11
- GATEWAY 1 FIRE STATEMENT FORM
- R1 ISSUE 3 - PLANNING FIRE STATEMENT FORM
- WHOLE LIFE CARBON ASSESSMENT
- WLCA_ASSESSMENT_65_FLEET_STREET_PLANNING_-_25_MARCH_2022_01
- CIRCULAR ECONOMY STATEMENT - PLANNING STATEMENT
- DEMOLITION SOUTH BLOCK ASHENTREE COURT ELEVATIONS
- EXISTING NORTH BLOCK FLEET STREET ELEVATION
- EXISTING NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- EXISTING NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- EXISTING SOUTH BLOCK COURTYARD ELEVATION
- EXISTING SOUTH BLOCK ASHENTREE COURT ELEVATIONS
- EXISTING NORTH BLOCK COURTYARD ELEVATION
- EXISTING NORTH & SOUTH BLOCK SECTION AA
- EXISTING NORTH & SOUTH BLOCK SECTION BB & CC
- PROPOSED NORTH BLOCK FLEET STREET ELEVATION
- PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION
- PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION
- PROPOSED SOUTH BLOCK COURTYARD ELEVATION
- PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION
- PROPOSED NORTH BLOCK COURTYARD ELEVATION
- PROPOSED NORTH & SOUTH BLOCK SECTION AA
- PROPOSED NORTH & SOUTH BLOCK SECTIONS BB & CC
- PROPOSED NORTH BUILDING CENTRAL LIGHTWELL ELEVATIONS
- PROPOSED SOUTH BUILDING ATRIUM ELEVATIONS
- TIPPERARY DEMOLITION SECTION 02
- TIPPERARY DEMOLITION SECTION 03
- EXISTINGSITEPLAN-PL-P02
- SITEPLAN-PL-P02
- LEVEL 00 PLANNING PLAN
- TRANSMITTAL RECORD
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- PROPOSED NORTH ELEVATION FLEET STREET
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART12
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 13
- ARCHAELOGICAL DESK BASED ASSESSMENT
- ARCHAELOGICAL DESK BASED ASSESSMENT PART 2
- PLANNING STATEMENT
- COVER LETTER
- ENERGY STRATEGY REPORT REVA_PART1
- ENERGY STRATEGY REPORT REVA_PART 2
- ENERGY STRATEGY REPORT REVA_PART3
- THE TIPPERARY_VISION
- ACOUSTIC PLANNING REPORT
- GIA AREA PLANS SCHEDULES
- GEA AREA PLANS SCHEDULES
- AIR QUALITY ASSESSMENT
- AIR QUALITY ASSESSMENT PART 2
- ECOLOGICAL APPRAISAL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 18 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
65 Fleet Street London EC4Y 1HT
Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 5 of planning permission 21/00709/FULMAJ dated 17/05/2022.
Granted Conditions 45 docs -
65 Fleet Street London EC4Y 1HT
Submission of a Deconstruction Logistics Plan to manage all freight vehicle movements to and from the site during deconstruction of the existing building(s) pursuant to condition 4 of planning permission 21/00709/FULMAJ dated 17/05/2022.
Granted Conditions 46 docs -
65 Fleet Street London EC4Y 1HT
Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.
Granted Lawful development 3 docs -
65 Fleet Street London EC4Y 1HT
Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.
Granted Conditions 11 docs -
65 Fleet Street London EC4Y 1HT
99% historically approved · decision due ~30 Jan
Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).
Awaiting decision 3 docs -
65 Fleet Street London EC4Y 1HT
External and Internal alterations to The Tipperary Pub including part demolition of the rear of the pub; erection of 1 storey roof extension containing student accommodation with associated expansion into northern block of 65 Fleet Street at fifth floor level. Works to improve access to Whitefriars Crypt with changes to the surrounding structure of the Crypt to allow for presentation and interpretation of the asset.
Granted Heritage and listed buildings Extension Demolition 304 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass