Skip to content
PlanIndex Get alerts
Menu

Planning application

65 Fleet Street London EC4Y 1HT

Granted City of London 24/00648/FULMAJ Full Major Application

Works: Extension Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial demolition and refurbishment and extension of buildings to provide: purpose-built student accommodation (Sui Generis) comprising 856 rooms; extension of up to two storeys for the north block (up to 37.24m AOD) and up to four storeys for the south block (up to 55.465m AOD) with provision of roof terraces; provision of cultural uses (learning and non-residential institution uses, Use Class F1); provision of commercial uses including retail (Use Class E); external alterations and extension to the Tipperary Pub (Sui Generis); enhancements to Whitefriars Crypt; public realm works including to passageway and Courtyard; hard and soft landscaping; and associated works.

As published by the council, reference 24/00648/FULMAJ

Application record

Reference
24/00648/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Granted As published: Approved
Received
21 Jun 2024
Validated
21 Jun 2024
Decided
18 Dec 2024
Ward
Castle Baynard
Decision by
Delegated
Postcode
EC4Y 1HT

Site history

Applications at this address on the City of London register

This site has had 39 applications since 2022: 31 approved, 0 refused.

  • 26/01309/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of details of all exposed flank or party walls pursuant to Condition 31 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 18 Sep 2026
  • 26/01080/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of Construction Logistics Plan and Construction Phase Plan pursuant to discharge of Condition 13 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 14 Oct 2026
  • 26/01038/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 6 (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 26/01036/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of condition survey and method statement pursuant to Condition 7 parts (b) and (c) of Listed Building Consent 24/00649/LBC dated 20.12.2024.

    Decided 26 Aug 2026 Lawful development
  • 26/01009/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of drawings of room layouts pursuant to discharge of Condition 35 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 16 Jul 2026
  • 25/01765/PODC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).

    Submitted 5 Dec 2025
  • 25/01605/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development
  • 25/01611/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 3 Mar 2026 Conditions
  • 25/01487/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a detailed Whole Life-Cycle Carbon assessment covering as-approved design stage pursuant to condition 8 (part A) of planning permission 24/00648/FULMAJ (as amended by 25/00663/NMA) dated 18/12/2024.

    Decided 14 Jan 2026 Conditions
  • 25/01490/LDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a method statement setting out the methodology for the safe removal, storage and reinstatement of the wooden panelling located on the rear wall of the ground floor bar of The Tipperary pursuant to condition 9 of planning permission 24/00649/LBC dated 20/12/2024.

    Decided 14 Jan 2026 Lawful development

Timeline

Dates from the published record

  1. 21 Jun 2024

    Received by City of London

  2. 18 Dec 2024

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

15+ later applications on the register refer to this one:

  • 26/01309/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of details of all exposed flank or party walls pursuant to Condition 31 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 18 Sep 2026
  • 26/01080/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of Construction Logistics Plan and Construction Phase Plan pursuant to discharge of Condition 13 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 14 Oct 2026
  • 26/01009/MDC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of drawings of room layouts pursuant to discharge of Condition 35 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Submitted 16 Jul 2026
  • 25/01765/PODC Awaiting decision

    65 Fleet Street London EC4Y 1HT

    Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).

    Submitted 5 Dec 2025
  • 25/01611/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 3 Mar 2026 Conditions
  • 25/01487/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a detailed Whole Life-Cycle Carbon assessment covering as-approved design stage pursuant to condition 8 (part A) of planning permission 24/00648/FULMAJ (as amended by 25/00663/NMA) dated 18/12/2024.

    Decided 14 Jan 2026 Conditions
  • 25/01493/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a detailed Circular Economy Statement; and an updated detailed Circular Economy Statement, to include a site waste management plan pursuant to condition 4 (part B) and 6 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 7 Apr 2026 Conditions
  • 25/01492/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a Climate Change Resilience Sustainability Statement pursuant to condition 23 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 22 Apr 2026 Conditions
  • 25/01426/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of details of the utility connection requirements pursuant to condition 9 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 14 Jan 2026 Conditions
  • 25/01343/MDC Granted

    65 Fleet Street London

    Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 13 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 25 Nov 2025 Conditions
  • 25/01345/MDC Granted

    65 Fleet Street London

    Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects during construction pursuant to condition 5 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 28 Oct 2025 Conditions
  • 25/01344/MDC Granted

    65 Fleet Street London

    Submission of details of all proposed internal lifts pursuant to condition 19 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Decided 22 Apr 2026 Conditions
  • 25/00999/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of Stage 4 Whole Life Carbon Assessment pursuant to discharge of Condition 8(b) as-approved design stage of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 27 Aug 2025 Conditions
  • 25/01000/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of Counter Terrorism Risk Assessment pursuant to discharge of Condition 16 planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 2 Oct 2025 Conditions
  • 25/01004/MDC Granted

    65 Fleet Street London EC4Y 1HT

    Submission of a Drainage Statement pursuant to the discharge of Condition 24 of planning permission 24/00648/FULMAJ dated 18.12.2024.

    Decided 19 Jan 2026 Conditions
  • Application: 24/00649/LBC (Decided)

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,604 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Whitefriars Ltd Applicant

8 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

343 documents on file for this application

  • SECTION 106 AGREEMENT S106 Agreement · 06 Jan 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 18 Dec 2024
  • APPLICATION FORM Application Form · 18 Oct 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Drawing · 17 Oct 2024
  • NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 17 Oct 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Drawing · 17 Oct 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Drawing · 17 Oct 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Drawing · 17 Oct 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 17 Oct 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 17 Oct 2024
  • AGENT COMMENTS RE TFL Correspondence In · 16 Oct 2024
  • REPRESENTATION - OLIVER SELLS Public Comment · 16 Oct 2024
  • REPRESENTATION - NHS LONDON HEALTHY URBAN DEVELOPMENT UNIT Public Comment · 15 Oct 2024
  • COMMENTS - CCAAC Consultee Comment · 11 Oct 2024
  • CIL FORM Other · 11 Oct 2024
  • COMMENTS - THE GARDEN TRUST Consultee Comment · 10 Oct 2024
  • HIGH RES PHOTOGRAPHS Photograph · 08 Oct 2024
  • LANDSCAPE PLANNING STATEMENT Accompanying report · 08 Oct 2024
  • ILLUSTRATIVE PLAN ROOF LEVELS Drawing · 08 Oct 2024
  • URBAN GREENING GROUND & LOWER GROUND Drawing · 08 Oct 2024
  • URBAN GREENING PBSA TERRACE & BROWN ROOF SYSTEMS Drawing · 08 Oct 2024
  • LABELLED PHOTOGRAPHS Photograph · 08 Oct 2024
  • COMMENTS-HISTORIC ENGLAND Consultee Comment · 02 Oct 2024
  • REPRESENTATION - THE INNS OF COURT COLLEGE OF ADVOCACY Public Comment · 24 Sep 2024
  • COMMENTS - THAMES WATER Consultee Comment · 20 Sep 2024
  • COMMENTS - THAMES WATER Consultee Comment · 20 Sep 2024
  • APPLICANTS RESPONSE TO TFL COMMENTS Public Comment · 18 Sep 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Drawing · 18 Sep 2024
  • PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 18 Sep 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 08 PASSAGEWAY ELEVATIONS Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 07 PASSAGEWAY ELEVATIONS Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET Drawing · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET Drawing · 18 Sep 2024
  • LEVELB1PLANNINGPLAN-S2-P14 Drawing · 18 Sep 2024
  • LEVEL10PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL09PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL08PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL07PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL06PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL05PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL04PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • LEVEL00PLANNINGPLAN-S2-P13 Drawing · 18 Sep 2024
  • PART 1 - DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 18 Sep 2024
  • PART 2 - DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 18 Sep 2024
  • PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET Drawing · 18 Sep 2024
  • LEVELLGPLANNINGPLAN-S2-P15 Drawing · 18 Sep 2024
  • LEVEL03PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • LEVEL01PLANNINGPLAN-S2-P09 Drawing · 18 Sep 2024
  • GATEWAY 1 FIRE STATEMENT FORM Other · 18 Sep 2024
  • COVER LETTER Cover Letter · 18 Sep 2024
  • LEVEL02PLANNINGPLAN-S2-P10 Drawing · 18 Sep 2024
  • DAYLIGHT AND SUNLIGHT REPORT Report - Daylight/Sunlight Report · 18 Sep 2024
  • PLANNING FIRE STATEMENT FORM Other · 18 Sep 2024
  • DESIGN AND ACCESS STATEMENT Report - Design & Access Statement/Report · 17 Sep 2024
  • HTVIA Accompanying report · 17 Sep 2024
  • PLANNING STATEMENT Delete Doc · 17 Sep 2024
  • REPRESENTATION - FLEET STREET QUARTER Public Comment · 17 Sep 2024
  • COMMENTS - NATS Consultee Comment · 16 Sep 2024
  • TIPPERARYPROPOSEDSECTION02-S2-P03 Drawing · 11 Sep 2024
  • TIPPERARYLEVEL00COMPOSITEDEMOLITIONPLANNINGPLAN-PL-P03 Drawing · 11 Sep 2024
  • TIPPERARYDEMOLITIONSECTION03-S2-P02 Drawing · 11 Sep 2024
  • TIPPERARYPROPOSEDSECTION03-S2-P02-S2-P02 Drawing · 11 Sep 2024
  • TIPPERARYEXISTINGSECTION02-S2-P03 Drawing · 11 Sep 2024
  • TIPPERARYLEVEL00PLANNINGPLANS-S2-P05 Drawing · 11 Sep 2024
  • SUBMISSION ADDENDUM LETTER 29.08.24 Correspondence In · 11 Sep 2024
  • COMMENTS-HEALTH AND SAFETY EXECUTIVE Consultee Comment · 11 Sep 2024
  • REPRESENTATION - DR JOHNSON?S HOUSE Public Comment · 11 Sep 2024
  • HTVIA ADDITIONAL IMAGES 9 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 8 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 7 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 6 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 5 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 4 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 3 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 2 Photograph · 10 Sep 2024
  • HTVIA ADDITIONAL IMAGES 1 Photograph · 10 Sep 2024
  • REPRESENTATION - GUILDHALL SCHOOL OF MUSIC & DRAMA Public Comment · 09 Sep 2024
  • DESIGN & ACCESS STATEMENT ADDENDUM Report - Design & Access Statement/Report · 30 Aug 2024
  • SUBMISSION ADDENDUM LETTER Correspondence In · 30 Aug 2024
  • REVISED HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 30 Aug 2024
  • INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT Report - Daylight/Sunlight Report · 30 Aug 2024
  • FIRE STATEMENT FORM Accompanying report · 30 Aug 2024
  • PLANNING FIRE STATEMENT FORM Accompanying report · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 01 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 03 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 05 BOUVERIE STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 06 COURTYARD Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 08 PASSAGEWAY ELEVATIONS Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 01 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 02 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 03 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 05 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 06 BOUVERIE STREET Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 07 COURTYARD Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 08 MAGPIE ALLEY-ASHENTREE CT Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 03 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 04 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 06 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 07 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 02 FLEET STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 04 WHITEFRIARS STREET Superseded drawing · 30 Aug 2024
  • PROPOSED NORTH BLOCK BAY STUDY 07 PASSAGEWAY ELEVATIONS Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK BAY STUDY 09 ASHENTREE CT LOOKING N Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 01 PLANNING PLAN Drawing · 30 Aug 2024
  • LEVEL 02 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 08 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 09 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LANDSCAPE PLANNING STATEMENT Accompanying report · 30 Aug 2024
  • LEVEL 00 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL B1 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Superseded drawing · 30 Aug 2024
  • LEVEL 05 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL 10 PLANNING PLAN Superseded drawing · 30 Aug 2024
  • LEVEL LG PLANNING PLAN Superseded drawing · 30 Aug 2024
  • COMMENTS - TFL Consultee Comment · 28 Aug 2024
  • REPRESENTATION -RUBY KAUR Public Comment · 21 Aug 2024
  • COMMENTS-THE GARDENS TRUST General Comment · 20 Aug 2024
  • REPRESENTATION-ASHLEY GRANT Public Comment · 14 Aug 2024
  • REPRESENTATION - CHARLIE O'DONNELL Public Comment · 08 Aug 2024
  • REPRESENTATION-KISHAN THAWRANI Public Comment · 08 Aug 2024
  • REPRESENTATION-MARTIN BARNETT Public Comment · 08 Aug 2024
  • REPRESENTATION-KENDAL ATHERTON Public Comment · 08 Aug 2024
  • COMMENTS - THAMES WATER Consultee Comment · 08 Aug 2024
  • COMMENTS - THAMES WATER Consultee Comment · 08 Aug 2024
  • REPRESENTATION - NAJIB HAQQI Public Comment · 08 Aug 2024
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 05 Aug 2024
  • AGENT - RESPONSE Accompanying report · 01 Aug 2024
  • REPRESENTATION-ANDY CONWAY Public Comment · 31 Jul 2024
  • REPRESENTATION-JAMES LI Public Comment · 31 Jul 2024
  • REPRESENTATION-ARTUR MIHALCEAN Public Comment · 31 Jul 2024
  • REPRESENTATION-ARDIT GJOKA Public Comment · 31 Jul 2024
  • REPRESENTATION-MATT RYAN Public Comment · 31 Jul 2024
  • REPRESENTATION-TEODORA BAKARDZHIEVA Public Comment · 31 Jul 2024
  • REPRESENTATION-GILLIAN JUPP Public Comment · 31 Jul 2024
  • REPRESENTATION-ASHLEY GRANT Public Comment · 31 Jul 2024
  • REPRESENTATION - CELAL KANIDAGLI Public Comment · 31 Jul 2024
  • COMMENTS - HEALTH AND SAFETY EXECUTIVE Consultee Comment · 30 Jul 2024
  • TIPPERARYEXISTINGSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYDEMOLITIONSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION03 Drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION02 Drawing · 25 Jul 2024
  • TIPPERARYPROPOSEDSECTION01 Drawing · 25 Jul 2024
  • TIPPERARYEXISTINGSECTION03 Drawing · 25 Jul 2024
  • TIPPERARYEXISTINGSECTION02 Drawing · 25 Jul 2024
  • TIPPERARYLEVEL0405DEMOLITIONPLANS Drawing · 17 Jul 2024
  • PART 1 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 4 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 5 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 6 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 7 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 8 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • LEVEL01EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVEL00DEMOLITIONPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVEL00EXISTINGPLANS Drawing · 15 Jul 2024
  • LEVEL06DEMOLITIONPLAN Drawing · 15 Jul 2024
  • LEVEL06PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL05DEMOLITIONPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVELB1DEMOLITIONPLANS Drawing · 15 Jul 2024
  • TIPPERARYLEVELB1PLANNINGPLANS Drawing · 15 Jul 2024
  • LEVELB1PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL07PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL07EXISTINGPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVEL0203EXISTINGPLANS Drawing · 15 Jul 2024
  • LEVELLGDEMOLITIONPLAN Drawing · 15 Jul 2024
  • PART 2 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • TIPPERARYLEVEL00DEMOLITIONPLANS Superseded drawing · 15 Jul 2024
  • LEVEL02PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL02EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVELB1EXISTINGPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVEL0405PLANNINGPLANS Drawing · 15 Jul 2024
  • TIPPERARYLEVEL0203PLANNINGPLANS Drawing · 15 Jul 2024
  • TIPPERARYLEVEL0405EXISTINGPLANS Drawing · 15 Jul 2024
  • LEVELLGPLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVELLGEXISTINGPLAN Drawing · 15 Jul 2024
  • PART 3 - DESIGN & ACCESS STATEMENT Report - Design & Access Statement/Report · 15 Jul 2024
  • PART 1 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 15 Jul 2024
  • LEVEL01DEMOLITIONPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVEL01DEMOLITIONPLANS Drawing · 15 Jul 2024
  • LEVEL01PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • TIPPERARYLEVEL01EXISTINGPLANS Drawing · 15 Jul 2024
  • TIPPERARYLEVEL00PLANNINGPLANS Superseded drawing · 15 Jul 2024
  • LEVEL00PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL00EXISTINGPLAN Drawing · 15 Jul 2024
  • SITELOCATIONPLAN Drawing · 15 Jul 2024
  • LEVEL06EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVEL05PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL05EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVEL04DEMOLITIONPLAN Drawing · 15 Jul 2024
  • LEVEL04DEMOLITIONPLAN Superseded drawing · 15 Jul 2024
  • LEVEL04EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVEL03DEMOLITIONPLAN Drawing · 15 Jul 2024
  • LEVEL03PLANNINGPLAN Drawing · 15 Jul 2024
  • LEVEL03EXISTINGPLAN Drawing · 15 Jul 2024
  • LEVELRFPLANNINGPLAN Drawing · 15 Jul 2024
  • LEVEL10PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL09PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL08ROOFDEMOLITIONPLAN Drawing · 15 Jul 2024
  • LEVEL08PLANNINGPLAN Superseded drawing · 15 Jul 2024
  • LEVEL07DEMOLITIONPLAN Drawing · 15 Jul 2024
  • PART 2 - HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Accompanying report · 15 Jul 2024
  • TIPPERARYLEVEL01PLANNINGPLANS Drawing · 15 Jul 2024
  • LEVEL02DEMOLITIONPLAN Drawing · 15 Jul 2024
  • LEVELB1DEMOLITIONPLAN Drawing · 15 Jul 2024
  • TIPPERARYLEVELB1EXISTINGPLANS Drawing · 15 Jul 2024
  • TIPPERARYLEVEL0203DEMOLITIONPLANS Drawing · 15 Jul 2024
  • PART O ASSESSMENT REPORT PART O ASSESSMENT REPORT Accompanying report · 01 Jul 2024
  • ENERGY AND SUSTAINABILITY ASSESSMENT Accompanying report · 01 Jul 2024
  • SUSTAINABILITY STATEMENT WITH BREEAM SCORECARD Accompanying report · 01 Jul 2024
  • FIRE STATEMENT FORM Accompanying report · 01 Jul 2024
  • FLEET STREET UTILITY INFRASTRUCTURE REPORT Accompanying report · 21 Jun 2024
  • OUTDOOR THERMAL COMFORT REPORT Accompanying report · 21 Jun 2024
  • WIND MICROCLIMATE ASSESSMENT (CFD) Accompanying report · 21 Jun 2024
  • CULTURAL PLAN Accompanying report · 21 Jun 2024
  • EQUALITIES IMPACT STATEMENT Accompanying report · 21 Jun 2024
  • HEALTH IMPACT ASSESSMENT Accompanying report · 21 Jun 2024
  • SOCIO-ECONOMIC STATEMENT FINAL 17.06.24 Accompanying report · 21 Jun 2024
  • STUDENT MANAGEMENT PLAN (1) Accompanying report · 21 Jun 2024
  • STUDENT NEED ASSESSMENT 12.06.2024V2 Accompanying report · 21 Jun 2024
  • CONSTRUCTION MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • CONSTRUCTION LOGISTICS PLAN Accompanying report · 21 Jun 2024
  • FRAMEWORK TRAVEL PLAN Accompanying report · 21 Jun 2024
  • DELIVERY AND SERVICING MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • OPERATION WASTE MANAGEMENT PLAN Accompanying report · 21 Jun 2024
  • TRANSPORT ASSESSMENT Accompanying report · 21 Jun 2024
  • VENTILATION STRATEGY REVA Accompanying report · 21 Jun 2024
  • STATEMENT OF COMMUNITY INVOLVEMENT Accompanying report · 21 Jun 2024
  • FINANCIAL VIABILITY ASSESSMENT - 31.05.24 (2) Accompanying report · 21 Jun 2024
  • DAYLIGHT & SUNLIGHT SOLAR GLARE ASSESSMENT Accompanying report · 21 Jun 2024
  • INTERNAL DAYLIGHT, SUNLIGHT AND OVERSHADOWING REPORT Report - Daylight/Sunlight Report · 21 Jun 2024
  • DAYLIGHT & SUNLIGHT REPORT Accompanying report · 21 Jun 2024
  • SECURITY DAS Accompanying report · 21 Jun 2024
  • LIGHT CONCEPT FOR PLANNING Accompanying report · 21 Jun 2024
  • PLANNING ACCESS STATEMENT Accompanying report · 21 Jun 2024
  • DRAWING REGISTER Drawings Schedule · 21 Jun 2024
  • DEMOLITION NORTH BLOCK FLEET STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION SOUTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • DEMOLITION NORTH & SOUTH BLOCK SECTION A A Drawing · 21 Jun 2024
  • DEMOLITION NORTH AND SOUTH BLOCK SECTIONS BB & CC Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED PASSAGEWAY ELEVATIONS Superseded drawing · 21 Jun 2024
  • PROPOSED PASSAGEWAY ELEVATIONS Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 3) Accompanying report · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 4) Accompanying report · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 5) Accompanying report · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 6) Accompanying report · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 1) Accompanying report · 21 Jun 2024
  • LANDSCAPE PLANNING STATEMENT (PART 2) Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT A AND DRAINAGE STRATEGY PART 1 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 2 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 3 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 4 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 5 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 6 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 7 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 8 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 9 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY (1) (1)_PART10 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART11 Accompanying report · 21 Jun 2024
  • GATEWAY 1 FIRE STATEMENT FORM Accompanying report · 21 Jun 2024
  • R1 ISSUE 3 - PLANNING FIRE STATEMENT FORM Accompanying report · 21 Jun 2024
  • WHOLE LIFE CARBON ASSESSMENT Accompanying report · 21 Jun 2024
  • WLCA_ASSESSMENT_65_FLEET_STREET_PLANNING_-_25_MARCH_2022_01 Accompanying report · 21 Jun 2024
  • CIRCULAR ECONOMY STATEMENT - PLANNING STATEMENT Accompanying report · 21 Jun 2024
  • DEMOLITION SOUTH BLOCK ASHENTREE COURT ELEVATIONS Drawing · 21 Jun 2024
  • EXISTING NORTH BLOCK FLEET STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Drawing · 21 Jun 2024
  • EXISTING SOUTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • EXISTING SOUTH BLOCK ASHENTREE COURT ELEVATIONS Drawing · 21 Jun 2024
  • EXISTING NORTH BLOCK COURTYARD ELEVATION Drawing · 21 Jun 2024
  • EXISTING NORTH & SOUTH BLOCK SECTION AA Drawing · 21 Jun 2024
  • EXISTING NORTH & SOUTH BLOCK SECTION BB & CC Drawing · 21 Jun 2024
  • PROPOSED NORTH BLOCK FLEET STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH & SOUTH BLOCK WHITEFRIARS STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH & SOUTH BLOCK BOUVERIE STREET ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED SOUTH BLOCK COURTYARD ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED SOUTH BLOCK ASHENTREE COURT ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH BLOCK COURTYARD ELEVATION Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH & SOUTH BLOCK SECTION AA Drawing · 21 Jun 2024
  • PROPOSED NORTH & SOUTH BLOCK SECTIONS BB & CC Drawing · 21 Jun 2024
  • PROPOSED NORTH BUILDING CENTRAL LIGHTWELL ELEVATIONS Drawing · 21 Jun 2024
  • PROPOSED SOUTH BUILDING ATRIUM ELEVATIONS Drawing · 21 Jun 2024
  • TIPPERARY DEMOLITION SECTION 02 Drawing · 21 Jun 2024
  • TIPPERARY DEMOLITION SECTION 03 Drawing · 21 Jun 2024
  • EXISTINGSITEPLAN-PL-P02 Site Plan · 21 Jun 2024
  • SITEPLAN-PL-P02 Site Plan · 21 Jun 2024
  • LEVEL 00 PLANNING PLAN Superseded drawing · 21 Jun 2024
  • TRANSMITTAL RECORD Other · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • PROPOSED NORTH ELEVATION FLEET STREET Superseded drawing · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART12 Accompanying report · 21 Jun 2024
  • FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY PART 13 Accompanying report · 21 Jun 2024
  • ARCHAELOGICAL DESK BASED ASSESSMENT Accompanying report · 21 Jun 2024
  • ARCHAELOGICAL DESK BASED ASSESSMENT PART 2 Agreements · 21 Jun 2024
  • PLANNING STATEMENT Report - Planning Statement/Report · 21 Jun 2024
  • COVER LETTER Cover Letter · 21 Jun 2024
  • ENERGY STRATEGY REPORT REVA_PART1 Accompanying report · 21 Jun 2024
  • ENERGY STRATEGY REPORT REVA_PART 2 Accompanying report · 21 Jun 2024
  • ENERGY STRATEGY REPORT REVA_PART3 Accompanying report · 21 Jun 2024
  • THE TIPPERARY_VISION Accompanying report · 21 Jun 2024
  • ACOUSTIC PLANNING REPORT Report - Acoustic/Noise Report · 21 Jun 2024
  • GIA AREA PLANS SCHEDULES Drawing · 21 Jun 2024
  • GEA AREA PLANS SCHEDULES Drawings Schedule · 21 Jun 2024
  • AIR QUALITY ASSESSMENT Accompanying report · 21 Jun 2024
  • AIR QUALITY ASSESSMENT PART 2 Accompanying report · 21 Jun 2024
  • ECOLOGICAL APPRAISAL Accompanying report · 21 Jun 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 18 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 65 Fleet Street London EC4Y 1HT

    24/00756/MDC Submitted 16 Jul 2024 50 yards away

    Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 5 of planning permission 21/00709/FULMAJ dated 17/05/2022.

    Granted Conditions 45 docs
  • 65 Fleet Street London EC4Y 1HT

    24/00757/MDC Submitted 16 Jul 2024 50 yards away

    Submission of a Deconstruction Logistics Plan to manage all freight vehicle movements to and from the site during deconstruction of the existing building(s) pursuant to condition 4 of planning permission 21/00709/FULMAJ dated 17/05/2022.

    Granted Conditions 46 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01605/LDC Submitted 17 Nov 2025 50 yards away

    Submission of details to ensure that precautions are taken to secure and protect original external and internal features of the remains of the former Whitefriars Convent during the building work pursuant to condition 5 of planning permission 24/00649/LBC dated 20/12/2024.

    Granted Lawful development 3 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01611/MDC Submitted 17 Nov 2025 50 yards away

    Submission of a disabled access and management plan pursuant to condition 18 of planning permission 24/00648/FULMAJ dated 18/12/2024.

    Granted Conditions 11 docs
  • 65 Fleet Street London EC4Y 1HT

    25/01765/PODC Submitted 5 Dec 2025 50 yards away

    99% historically approved · decision due ~30 Jan

    Submission of Public Realm Specifications pursuant to Schedule 3, Paragraph 10.2 of the S106 Agreement dated 18.12.2024 (Planning Ref: 24/00648/FULMAJ).

    Awaiting decision 3 docs
  • 65 Fleet Street London EC4Y 1HT

    24/00649/LBC Submitted 21 Jun 2024 50 yards away

    External and Internal alterations to The Tipperary Pub including part demolition of the rear of the pub; erection of 1 storey roof extension containing student accommodation with associated expansion into northern block of 65 Fleet Street at fifth floor level. Works to improve access to Whitefriars Crypt with changes to the surrounding structure of the Crypt to allow for presentation and interpretation of the asset.

    Granted Heritage and listed buildings Extension Demolition 304 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications