Planning application
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge conditions 14 (Highways Condition Survey) and 15 (Remediation scheme for damage) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
As published by the council, reference 25/0535/COND
Application record
- Reference
- 25/0535/COND
- Type
- Condition Discharge
- Status
- Awaiting decision
- Received
- 31 Jul 2025
- Validated
- 4 Aug 2025
- Ward
- Nelson
- Decision by
- Delegated
Site history
Applications at this address on the Caerphilly register
This site has had 7 applications since 2025: 4 approved, 0 refused.
-
26/0412/COND Awaiting decision
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 13 (TMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
26/0250/COND Granted
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 30 of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
26/0148/COND Granted
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 33 (Details of Turbines) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
25/0568/COND Granted
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 17 (Details of means of access ) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
-
25/0536/COND Granted
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 11 (Construction Transport Management Plan) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
-
25/0083/NMA Awaiting decision
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Seek approval of a non-material amendment to planning consent 23/0427/DNS (Welsh Ministers Consent DNS/3272053) (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of conditions 08,17, 38 and 39
Timeline
Dates from the published record
-
31 Jul 2025
Received by Caerphilly
-
4 Aug 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Caerphilly took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Savills (UK) Ltd Agent, registered in London
Active · incorporated 1991 · London
1,138 applications on PlanIndex · across 155 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordTwyn Hywel Energy Park Ltd Applicant, registered in Cardiff
Active · incorporated 2020 · Cardiff
38 applications on PlanIndex · across 2 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
- WELSH GOVERNMENT NETWORK MANAGEMENT DIVISION COMMENTS
- AMENDED CONDITION REVIEW & REMEDIATION PLAN
- WG DEVELOPMENT CONTROL COMMENTS
- WG DEVELOPMENT CONTROLS
- LOCATION PLAN
- DECISION DNS/3272053
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided condition discharge and variation applications in a median of 55 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
86% historically approved · decision due ~8 Apr
Seek approval of a non-material amendment to planning consent 23/0427/DNS (Welsh Ministers Consent DNS/3272053) (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of conditions 08,17, 38 and 39
Awaiting decision Amendments 3 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
86% historically approved · decision due ~22 Jan
Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to vary the wording of condition 18 (Habitat Management Plan) to change the trigger point
Awaiting decision Amendments 4 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
100% historically approved · decision due ~22 Jan
Discharge conditions 06 (CEMP) and 07 (CWMP) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Awaiting decision Conditions 15 docs -
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 17 (Details of means of access ) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Granted Conditions 7 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
Discharge conditions 06 (CEMP) and 07 (CWMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
Granted Conditions 17 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of condition 22 (Borrow Pit Restoration Plan) to allow the construction works which would not impact upon the borrow pits to commence
Granted Amendments 6 docs
Other condition discharge and variation applications
In Caerphilly
-
26/0519/COND Granted
Land Within Curtilage Of 44 Brynavon Terrace Hengoed CF82 7NA
Discharge conditions 06 (Parking materials) 09 (Hard and Soft Landscaping) and 10 (Hedgerow protection) of planning consent 26/0179/FULL (Erect 2 No. 2.5 storey semi-detached dwellings)
-
26/0644/COND Awaiting decision
Y Fron Mountain View Pwllypant Caerphilly CF83 3HW
Discharge condition 07 (Landscaping) of planning consent 25/0382/NCC (Vary conditions 02 (Plans) and 03 (Approval of the Proposed Amendments of Some of External Materials) of planning consent 20/0634/COU (Change use and erect extension at Y Fron from Guest House (C1) to HMO to be used for Emergency Housing/Move on Accommodation (Sui Generis) and associated works) to amend plans)
-
26/0506/COND Granted
12 Waunfach Street Caerphilly CF83 3HL
Discharge Condition 02 (Parking area materials) of planning consent 26/0314/NCC (Removal of condition 03 (Temporary Permission (12 Months)) of planning consent 25/0063/COU (Change the use of garage (from domestic use to business use) including use of drive in, double gates, single gate and single fence panel))
-
26/0641/COND Awaiting decision
Fairbank Park Lane Tredomen Hengoed CF82 7BX
Discharge conditions 03 (Biodiversity) and 04 (Roof tiles) of planning consent 26/0357/HH(Replace existing profiled sheeting flat roof on garage with new pitched roof with recessed integrated solar panels)
-
26/0535/COND Granted
Castle Court Silver Street Pontywaun Newport NP11 7DY
Discharge condition 04 (Construction Method Statement) of planning consent 24/0875/LA (Erect 16 residential units and associated highway, drainage and landscape infrastructure)