Planning applicant

Twyn Hywel Energy Park Ltd

Registered in Cardiff. 38 planning applications on PlanIndex across 2 councils . Named as the applicant, not the agent. On the register from 2025 to 2026.

Where they work

What they file

  1. Conditions84%
  2. Amendments16%

Company record

From Companies House. Company information only; we never show personal contact details.

Registered name
TWYN HYWEL ENERGY PARK LIMITED
Company number
12576991
Status
Active
Incorporated
29 April 2020
Registered in
Cardiff

Track record

The 10 most recent applications naming this firm

  • 26/0530/DIS Awaiting decision

    Land 16km North Of Cardiff, On The Border Of Caerphilly And Rhondda Cynon Taf (on Mynydd Eglwysilan)

    Discharge of Condition 13 (AIL) of planning permission 25/0619/RVOC.

    Submitted 17 Jun 2026
  • 26/0395/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 26 (SI stability) of planning consent 25/0342/NCC(Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 31 Jul 2026 Conditions
  • 26/0279/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 22 (Borrow pits) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 29 Jun 2026 Conditions
  • 26/0250/COND Decided

    Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon

    Discharge condition 30 of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 1 Jun 2026 Conditions
  • 26/0156/COND Decided

    Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 11 (Noise Complaints) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    Decided 14 Jul 2026 Conditions
  • 26/0148/COND Decided

    Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon

    Discharge condition 33 (Details of Turbines) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 24 Apr 2026 Conditions
  • 26/0103/COND Decided

    Land At Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 13 (Lighting) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    Decided 20 Apr 2026 Conditions
  • 26/0105/COND Decided

    Land At Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge condition 12 (Tree info) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    Decided 13 Apr 2026 Conditions
  • 26/0106/COND Decided

    Land At Cilfynydd Substation Craig-evan-leyshon Common Road Llanfabon

    Discharge conditions 04 (Ecological Enhancement) and 15 (Details - major dev) of planning consent 25/0243/FULL (Install and operate electrical infrastructure and associated infrastructure, including a grid connection)

    Decided 24 Apr 2026 Conditions
  • 26/0107/COND Decided

    Twyn Hywel Energy Park Land North-West Of Caerphilly

    Discharge condition 25 (Hydrogeological) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

    Decided 17 Apr 2026 Conditions

28 more applications on record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.