Planning application
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Seek approval of a non-material amendment to planning consent 23/0427/DNS (Welsh Ministers Consent DNS/3272053) (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of conditions 08,17, 38 and 39
As published by the council, reference 25/0083/NMA
Application record
- Reference
- 25/0083/NMA
- Type
- Non-Material Amendments
- Status
- Awaiting decision
- Received
- 10 Feb 2025
- Validated
- 11 Feb 2025
- Ward
- Nelson
- Decision by
- Delegated
Site history
Applications at this address on the Caerphilly register
This site has had 7 applications since 2025.
-
26/0412/COND Awaiting decision
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 13 (TMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
26/0250/COND Decided
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 30 of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
26/0148/COND Decided
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 33 (Details of Turbines) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
-
25/0568/COND Decided
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 17 (Details of means of access ) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
-
25/0535/COND Awaiting decision
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge conditions 14 (Highways Condition Survey) and 15 (Remediation scheme for damage) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
-
25/0536/COND Decided
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 11 (Construction Transport Management Plan) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Timeline
Dates from the published record
-
10 Feb 2025
Received by Caerphilly
-
11 Feb 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 April 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Caerphilly took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
1,780 applications on PlanIndex · across 174 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Caerphilly for determination, against a statutory target of eight weeks. Over the last year Caerphilly decided amendment applications in a median of 25 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Twyn Hywel Energy Park Land North-West Of Caerphilly
85% historically approved · decision due ~22 Jan
Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to vary the wording of condition 18 (Habitat Management Plan) to change the trigger point
Awaiting decision Amendments 4 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
78% historically approved · decision due ~22 Jan
Discharge conditions 06 (CEMP) and 07 (CWMP) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Awaiting decision Conditions 15 docs -
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
Discharge condition 17 (Details of means of access ) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Decided Conditions 7 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
Discharge conditions 06 (CEMP) and 07 (CWMP) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)
Decided Conditions 17 docs -
Twyn Hywel Energy Park Land North-West Of Caerphilly
Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of condition 22 (Borrow Pit Restoration Plan) to allow the construction works which would not impact upon the borrow pits to commence
Granted Amendments 5 docs -
Mynydd Eglwysilan Common Bwlch Carnygelli Road Llanfabon
78% historically approved · decision due ~29 Sep
Discharge conditions 14 (Highways Condition Survey) and 15 (Remediation scheme for damage) of planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture)
Awaiting decision Conditions 7 docs
Other amendment applications
In Caerphilly
-
26/0547/NMA Awaiting decision
The Meadows Farm Village Retreat The Meadows Gypsy Lane Groeswen Cardiff CF15 7UN
Seek approval of a non material amendment to planning consent 25/0632/NCC (Vary conditions 04 (Cafe and coffee shop use restriction) and 05 (Hours General) of planning consent 24/0557/NCC (Vary Condition 4 & 5 of planning consent 22/0713/RET to amend opening hours)) to amend the initial wording of Conditions 8, 10 and 11 to require the details required by these conditions to be submitted, only to the Local Planning Authority within 9 months of the date of this permission, i.e. by the 17 September 2026 (rather than the currently stated 3 months)
-
26/0228/NMA Granted
Ffos Caerffili Park Lane Caerphilly
Seek approval of a non-material amendment to planning consent 23/0273/FULL to permit the construction of structural frame to north of existing building
-
26/0529/NMA Granted
187 - 189 High Street Blackwood NP12 1AA
Seek approval of a non-material amendment to planning consent 25/0106/COU (Change the use of commercial ground floor space and lower ground floor commercial storage to part commercial and part residential for two new dwellings and alterations to shop front) to change lower ground floor flat to a 1 Bed flat and increase the room sizes for both ground floor and lower ground floor flats
-
26/0477/NMA Granted
Unit 6 To 7 Blackwood Gate Retail Park Blackwood NP12 2FS
Seek approval of a non-material amendment planning permission 26/0260/FULL (Refurbish Unit 5 and Unit 6/7 including external amalgamation works to create 1 no. retail unit for continued use within Class A1, erect a rear extension, relocated customer entrance/exit, new condenser plant, new trolley shelters, and all associated works) to amend the wording of Condition 09
-
26/0527/NMA Awaiting decision
Land At Grid Ref 318897 198815 Syr Dafydd Avenue Oakdale Blackwood NP12 0LA
Seek approval of a non-material amendment to planning consent 23/0302/FULL (Erect detached residential dwelling with garage outbuilding, access track and associated landscaping) to amend site layout plan to reflect new curtilage of Penrhiw-bengi Farm and relocate proposed trees from western to northern boundary of site