Skip to content
PlanIndex Get alerts
Menu

Planning application

Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

Awaiting decision Bristol, City of 26/P/1283/NMA Non Material Amendment

Relates to 26/P/0606/S73

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

As published by the council, reference 26/P/1283/NMA

Application record

Reference
26/P/1283/NMA
Type
Non Material Amendment
Status
Registered
Received
18 Jun 2026
Validated
18 Jun 2026
Ward
Long Ashton
Parish
Long Ashton

Site history

Applications at this address on the Bristol, City of register

This site has had 14 applications since 2025: 13 approved, 0 refused.

  • 26/P/1540/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

    Decided 31 Jul 2026 Amendments
  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/0765/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.

    Decided 17 Apr 2026 Amendments
  • 26/P/0609/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.

    Decided 20 May 2026 Conditions
  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments
  • 26/P/0340/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.

    Decided 20 Mar 2026 Conditions
  • 26/P/0273/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.

    Decided 23 Feb 2026 Conditions
  • 26/P/0043/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.

    Decided 14 Jan 2026 Amendments
  • 25/P/2656/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 23 (Loop Road Bridge Details) from application 25/P/1496/FU2.

    Decided 22 Jan 2026 Conditions
  • 25/P/2548/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge conditions 8 (Large Scale Details) and 9 (Material Samples) from Phase 1 of application 25/P/1496/FU2.

    Decided 5 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 18 Jun 2026

    Received by Bristol, City of

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 13 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bristol, City of took a median of 55 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Agent on file

638 applications on PlanIndex · across 117 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file, registered in Salford

6 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • CEMP REV 8 Application Support Info · 02 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 18 Jun 2026
  • BRS-STL-00-XX-ZZ-DR-AR-090001-LOCATION PLAN OS Extract · 18 Jun 2026
  • PLANNING STATEMENT: NON MATERIAL AMENDMENT Planning Statement · 18 Jun 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Bristol, City of for determination, against a statutory target of eight weeks. Over the last year Bristol, City of decided amendment applications in a median of 50 days. More in our guide to how long planning decisions take.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Bristol, City of

  • 26/P/1314/S73 Withdrawn

    15 Bishops Road Cleeve BS49 4NQ

    Section 73 application to vary condition 2 (plans) attached to permission 25/P/1655/FUH (Proposed demolition of existing rear conservatory, front porch and side extension with subsequent erection of single storey front, rear and side extensions. Loft conversion and roofing alterations including the creation of front, side and rear gables, rear and side flat-roof dormers and an integrated rear balcony. Fenestration alterations throughout and creation of off-road parking with vehicular access via the removal and replacement of existing boundary wall.) to allow for the removal of the front bedroom extensions and large entrance overhanging porch and roof and retention of the existing bedroom bay window and kitchen window. Reduction and change of design for entrance porch, removal of approved first floor rear extension. Changes to loft conversion with dormer roof and windows to rear and re-alignment/reduction in footprint of side storage area to suit neighbouring boundary and minor fenestration changes.

    22 Jun 2026 Amendments
  • 26/P/1329/S73 Granted

    Plot A5 At Junction Of Beaufighter Road And Cross Road Weston Business Quarter Weston-super-Mare BS24 8EE

    Section 73 application to vary conditions 2,3,5,6,15 & 19 attached to permission 21/P/1208/FUL (Full application for the construction of 4no. industrial buildings (Class E(g) and/or B8) and associated access roads, parking and landscaping.) as amended by 26/P/1080/NMA. For the construction of industrial buildings (Class E(g) and/or B8) and associated access roads, parking and landscaping to show the amalgamation of two approved buildings, creation of an additional unit, along with associated elevational, floor plan and site layout amendments, and all associated development.

    24 Jun 2026 Amendments
  • 26/P/1740/S73 Awaiting decision

    Argentum Lodge 81 Silver Street Nailsea BS48 2DS

    Section 73 application to vary condition 2 (Plans) attached to permission 26/P/0129/FUL (Erection of two storey extension to east elevation with dormer to north elevation roof, associated modifications to car parking areas, relocation of refuse store, to increase the number of bedrooms, improve the quality of internal communal spaces, and to create a dedicated servicing bay.) To allow for minor amendments to the external landscaping design that have resulted from post consent technical design stages.

    24 Aug 2026 Amendments
  • 26/P/1736/NMA Awaiting decision

    71 Slade Road Portishead Bristol BS20 6AP

    Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.

    21 Aug 2026 Amendments
  • 26/P/1086/S73 Granted

    Court House Farm Marsh Lane Easton-in-Gordano BS20 0NE

    Section 73 application to vary condition 9 attached to permission 23/P/0563/FUL (Application to remove condition 19 (access - highways safety) attached to planning permission 16/P/1987/F (development of the site for port related uses. Provision of hardstanding for storage of cargo in transit (e.g. motor vehicles) through Royal Portbury Docks,with associated infrastructure, including a crossing over the disused railway by a crossing at grade and or vehicle bridge between the current Royal Portbury Dock estate and the proposed site) to allow for the wording of condition 9 (Condition 16) to be amended to reflect the uncertain requirement for, and timing of, the construction of the vehicular bridge across the railway line.

    22 May 2026 Amendments