Skip to content
PlanIndex Get alerts
Menu

Planning application

Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

Granted Bristol, City of 26/P/0043/NMA Non Material Amendment

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.

As published by the council, reference 26/P/0043/NMA

Application record

Reference
26/P/0043/NMA
Type
Non Material Amendment
Status
Decided
Decision
Granted As published: Approve
Received
8 Jan 2026
Validated
8 Jan 2026
Decided
14 Jan 2026
Ward
Long Ashton
Parish
Long Ashton
Decision by
Delegated Decision

Site history

Applications at this address on the Bristol, City of register

This site has had 14 applications since 2025: 13 approved, 0 refused.

  • 26/P/1540/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

    Decided 31 Jul 2026 Amendments
  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/1283/NMA Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

    Submitted 18 Jun 2026 Amendments
  • 26/P/0765/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.

    Decided 17 Apr 2026 Amendments
  • 26/P/0609/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.

    Decided 20 May 2026 Conditions
  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments
  • 26/P/0340/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.

    Decided 20 Mar 2026 Conditions
  • 26/P/0273/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.

    Decided 23 Feb 2026 Conditions
  • 25/P/2656/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 23 (Loop Road Bridge Details) from application 25/P/1496/FU2.

    Decided 22 Jan 2026 Conditions
  • 25/P/2548/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge conditions 8 (Large Scale Details) and 9 (Material Samples) from Phase 1 of application 25/P/1496/FU2.

    Decided 5 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 8 Jan 2026

    Received by Bristol, City of

  2. 14 Jan 2026

    Decision issued: Approve

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Rapleys LLP Agent

834 applications on PlanIndex · across 131 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • DECISION (NMA) APPROVE Decision Notice · 15 Jan 2026
  • NORTH SOMERSET OFFICER REPORT Delegated Report · 15 Jan 2026
  • DECISION NOTICE 25P1496FU2 Application Support Info · 08 Jan 2026
  • SITE LOCATION PLAN OS Extract · 08 Jan 2026
  • DECISION NOTICE 23/P/2185/FU2 Application Support Info · 08 Jan 2026
  • APPLICATIONFORMREDACTED Amended Application Form · 08 Jan 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bristol, City of granted permission on 14 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Bristol, City of

  • 26/P/1513/S73 Refused

    82 Clevedon Road Tickenham Clevedon BS21 6RD

    Section 73 application to amend condition 6 (construction environmental management plan (CEMP)) attached to planning permission 25/P/2193/S73 (Section 73 application to vary condition 2 (plans) attached to planning permission 24/P/2543/FUL (erection of 4no. dwellings with private access drive, detached garages, demolition of domestic shed and associated works) (to allow for change of house types proposed.) To allow for an amendment to the wording removing reference to pre-commencement.

    Received 21 Jul, published by the council 31 Jul 2026 Amendments
  • 26/P/1640/S73 Granted

    Red Rock Barn Tickenham Hill Tickenham Clevedon BS21 6SW

    Section 73 application to vary Condition 2 (Plans) attached to permission 23/P/1676/FUL (Proposed conversion and extension by the erection of a single storey front and a single storey side extension and increase in height of existing builders store by 125mm to create 1no. three bed residential dwelling) to allow for the approved plans to be updated to reflect adjusted levels. The updated plans provide a unified internal floor level and safer external access without altering the approved footprint, ridge height or appearance

    Received 7 Aug, published by the council 19 Aug 2026 Amendments
  • 26/P/1447/S73 Granted

    Holiday Inn Red Hill Redhill Wrington BS40 5RB

    Section 73 application to vary condition 1 attached to planning permission 19/P/3160/MMA (minor material amendment to 17/P/0784/MMA (for extensions and alterations to the hotel)) to allow for revisions to external design of approved extension and car park/site layout, slight revision to footprint of extension's northern elevation, revision to roof appearance to include PV panels across existing and extended areas.

    Received 9 Jul, published by the council 31 Jul 2026 Amendments
  • 26/P/1118/S73 Granted

    47 Bristol Road Lower Weston-super-Mare BS23 2PX

    Section 73 application to vary condition 2 (Plans) and satisfy condition 7 (Arboricultural report) attached to permission 24/P/0365/FUL (Proposed roof extension to the rear roof section to increase room provision and the quality. Erection of a single storey extension to the laundry outbuilding to allow the relocation of administration office space and the provision of a staff training facility.) To allow for the proposed front outbuilding to be widened eastward by a few metres and slight adjustment to the roof pitch together with the introduction of solar panels to the west facing roof slope. Full Tree Protection Plan and Arboricultural Method Statement, superseding the requirement in Condition 7 of the original permission.

    Received 27 May, published by the council 21 Jul 2026 Amendments
  • 26/P/1522/NMA Granted

    17 - 21 High Street Weston-super-Mare BS23 1HA

    Non-material amendment to application 23/P/0985/FUL (Conversion of existing mixed use retail and residential building to create four ground floor retail units (Use Class E) and 40no. residential units above. Works to include demolition of existing third floor and erection of extended third floor; insertion of new and replacement of existing windows and doors; creation of balconies to flats.) to allow for the removal of the proposed ramp to the front elevation of the building.

    Received 21 Jul, published by the council 31 Jul 2026 Amendments