Planning application

Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

Granted Bristol, City of 26/P/0606/S73 Section 73 - vary/remove conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

As published by the council, reference 26/P/0606/S73

Application record

Reference
26/P/0606/S73
Type
Section 73 - vary/remove conditions
Status
Decided
Decision
Granted As published: Approve
Received
16 Mar 2026
Validated
16 Mar 2026
Decided
12 Jun 2026
Ward
Long Ashton
Parish
Long Ashton
Decision by
Delegated Decision

Site history

Applications at this address on the Bristol, City of register

This site has had 14 applications since 2025: 13 approved, 0 refused.

  • 26/P/1540/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

    Decided 31 Jul 2026 Amendments
  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/1283/NMA Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

    Submitted 18 Jun 2026 Amendments
  • 26/P/0765/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.

    Decided 17 Apr 2026 Amendments
  • 26/P/0609/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.

    Decided 20 May 2026 Conditions
  • 26/P/0340/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.

    Decided 20 Mar 2026 Conditions
  • 26/P/0273/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.

    Decided 23 Feb 2026 Conditions
  • 26/P/0043/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.

    Decided 14 Jan 2026 Amendments
  • 25/P/2656/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 23 (Loop Road Bridge Details) from application 25/P/1496/FU2.

    Decided 22 Jan 2026 Conditions
  • 25/P/2548/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge conditions 8 (Large Scale Details) and 9 (Material Samples) from Phase 1 of application 25/P/1496/FU2.

    Decided 5 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Bristol, City of

  2. 12 Jun 2026

    Decision issued: Approve

  3. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 26/P/1540/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

    Decided 31 Jul 2026 Amendments
  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/1283/NMA Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

    Submitted 18 Jun 2026 Amendments
  • Application: 25/P/1496/FU2 (Decided)

Who's behind it

Company information only, from the register and Companies House

Rapleys LLP Agent

834 applications on PlanIndex · across 131 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Epic Bristol Limited Applicant, registered in Salford

Active · incorporated 2016 · Salford

25 applications on PlanIndex · across 2 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

214 documents on file for this application

  • DISCHARGE LETTER - CONDITION 12 Discharge of Conditions · 22 Jul 2026
  • S73 DECISION LETTER Decision Notice · 12 Jun 2026
  • NORTH SOMERSET OFFICER REPORT Delegated Report · 12 Jun 2026
  • MINISTRY OF HOUSING COMMUNITIES AND LOCAL GOVERNMENT Application Support Info · 03 Jun 2026
  • ARBORICULTURAL ASSESSMENT & METHOD STATEMENT Arboricultural statement · 01 Jun 2026
  • HRA ADDENDUM Other · 15 May 2026
  • LLFA COMMENTS Consultation Reply · 11 May 2026
  • COVERING LETTER - UPDATED Application Support Info · 11 May 2026
  • SURFACE WATER DRAINAGE LONG SECTIONS SHEET 3 Plan · 11 May 2026
  • SURFACE WATER DRAINAGE LONG SECTIONS SHEET 2 Plan · 11 May 2026
  • SURFACE WATER DRAINAGE AREAS CATCHMENT PLAN Plan · 11 May 2026
  • SURFACE WATER DRAINAGE DETAILED LAYOUT SHEET 3 Plan · 11 May 2026
  • SURFACE WATER DRAINAGE DETAILED LAYOUT SHEET 2 Plan · 11 May 2026
  • SURFACE WATER DRAINAGE DETAILED LAYOUT SHEET 1- Plan · 11 May 2026
  • SURFACE WATER DRAINAGE SITE PLAN Plan · 11 May 2026
  • CEMP - APPENDIX 1 SITE WASTE MANAGEMENT PLAN Application Support Info · 08 May 2026
  • CEMP - APPENDIX 2 AQDMP Application Support Info · 08 May 2026
  • CEMP - APPENDIX 3 BIODIVERSITY CONSTRUCTION MANAGEMENT PLAN Application Support Info · 08 May 2026
  • ENVIRONMENT AGENCY COMMENTS Consultation Reply · 06 May 2026
  • TREE OFFICER REQUEST FOR AMENDED ARB. REPORT 16/04/26 Email · 27 Apr 2026
  • NETWORK RAIL COMMENTS Consultation Reply · 14 Apr 2026
  • SPORT ENGLAND COMMENTS Consultation Reply · 13 Apr 2026
  • HISTORIC ENGLAND COMMENTS Consultation Reply · 13 Apr 2026
  • THE COAL AUTHORITY COMMENTS Consultation Reply · 31 Mar 2026
  • PRESS ADVERT FOR 25/03/26 Press Advert · 20 Mar 2026
  • PART 1 Design and access statement · 19 Mar 2026
  • PART 2 Design and access statement · 19 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 1 Environment Statement · 18 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 2 Environment Statement · 18 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 3 Environment Statement · 18 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 4 Environment Statement · 18 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 5 Environment Statement · 18 Mar 2026
  • APPENDIX A - REVISED SCHEME DRAWINGS - PART 6 Environment Statement · 18 Mar 2026
  • APPENDIX B - CUMULATIVE SCHEMES UPDATE Environment Statement · 18 Mar 2026
  • APPENDIX C ? CONSTRUCTION NOISE PREDICTION DATA Environment Statement · 18 Mar 2026
  • APPENDIX D ? UPDATED BAT SURVEY REPORT Environment Statement · 18 Mar 2026
  • APPENDIX E ? SHADOW HABITAT REGULATIONS ASSESSMENT ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX F ? BIODIVERSITY NET GAIN REPORT ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX G ? FLOOD RISK ASSESSMENT ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX H ? DRAINAGE STRATEGY ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX I ? WATER FRAMEWORK DIRECTIVE ASSESSMENT ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX J ? TYPICAL LIGHTING CALCULATIONS Environment Statement · 18 Mar 2026
  • APPENDIX K ? ARCHAEOLOGICAL AND BUILT HERITAGE TECHNICAL APPENDIX ADDENDUM Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 1 Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 2 Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 3 Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 4 Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 5 Environment Statement · 18 Mar 2026
  • APPENDIX L ? REPRESENTATIVE VIEWPOINTS AND VERIFIED VIEW MONTAGES - PART 6 Environment Statement · 18 Mar 2026
  • STATEMENT OF CONFORMITY Environment Statement · 18 Mar 2026
  • APPLICATIONFORMREDACTED Application Form · 17 Mar 2026
  • CIL FORM 1 - ADDITIONAL INFORMATION FORM CIL Notices · 17 Mar 2026
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - REV 7 Report · 17 Mar 2026
  • UTILITY STATEMENT ADDENDUM - PART 1 OF 2 Report · 17 Mar 2026
  • UTILITY STATEMENT ADDENDUM - PART 2 OF 2 Report · 17 Mar 2026
  • GROUNDWATER MONITORING REPORT Report · 17 Mar 2026
  • SUSTAINABILITY STATEMENT ADDENDUM Report · 17 Mar 2026
  • ENERGY STRATEGY ADDENDUM Report · 17 Mar 2026
  • SAFETY, HEALTH & ENVIRONMENT NOTES Plan · 17 Mar 2026
  • BULK EARTHWORKS EXISTING GROUND LEVELS Plan · 17 Mar 2026
  • BULK EARTHWORKS FINISHED GROUND LEVELS Plan · 17 Mar 2026
  • BULK EARTHWORKS FORMATION LEVELS Plan · 17 Mar 2026
  • BULK EARTHWORKS SECTIONS SHEET 1 Plan · 17 Mar 2026
  • HIGHWAYS INTERNAL ACCESS ROAD SITE PLAN Plan · 17 Mar 2026
  • HIGHWAYS INTERNAL ACCESS ROAD DETAILED LAYOUT SHEET 1 Plan · 17 Mar 2026
  • HIGHWAYS INTERNAL ACCESS ROAD DETAILED LAYOUT SHEET 2 Plan · 17 Mar 2026
  • HIGHWAYS INTERNAL ACCESS ROAD DETAILED LAYOUT SHEET 3 Plan · 17 Mar 2026
  • HIGHWAYS INTERNAL ACCESS ROAD LONG SECTION SHEET 1 Plan · 17 Mar 2026
  • VEHICLE TRACKING SITE WIDE FIRE TENDER ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING OFFICE 1 COMPACTOR CONTAINER COLLECTION Plan · 17 Mar 2026
  • VEHICLE TRACKING OFFICE 1 REAR LOADED BIN COLLECTION Plan · 17 Mar 2026
  • VEHICLE TRACKING OFFICE 1 LARGE ARTICULATED LORRY ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING OFFICE 1 RIGID LORRY ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING AUDITORIUM LOADING DOCK LARGE ARTICULATED LORRY ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING AUDITORIUM LOADING DOCK REAR LOADED BIN COLLECTION Plan · 17 Mar 2026
  • VEHICLE TRACKING BUS ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING COACH ACCESS Plan · 17 Mar 2026
  • VEHICLE TRACKING FOUL WATER PUMP STATION Plan · 17 Mar 2026
  • PUBLIC FOOTPATH DIVERSIONS INTERNAL LAYOUT Plan · 17 Mar 2026
  • SURFACE WATER DRAINAGE DETAILED LAYOUT SHEET 3 Plan · 17 Mar 2026
  • SURFACE WATER DRAINAGE EXCEEDANCE & OVERLAND FLOW ROUTES Plan · 17 Mar 2026
  • SURFACE WATER DRAINAGE MANHOLE SCHEDULE Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE SITE PLAN Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE DETAILED LAYOUT SHEET 1 Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE DETAILED LAYOUT SHEET 2 Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE DETAILED LAYOUT SHEET 3 Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE LONG SECTIONS SHEET 1 Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE LONG SECTIONS SHEET 2 Plan · 17 Mar 2026
  • FOUL WATER DRAINAGE MANHOLE SCHEDULE Plan · 17 Mar 2026
  • TYPICAL DRAINAGE DETAILS SHEET 1 Plan · 17 Mar 2026
  • TYPICAL DRAINAGE DETAILS SHEET 2 Plan · 17 Mar 2026
  • TYPICAL DRAINAGE DETAILS SHEET 3 Plan · 17 Mar 2026
  • COMBINED UTILITIES CORRIDOR SITE PLAN Plan · 17 Mar 2026
  • COMBINED UTILITIES CORRIDOR TYPICAL DETAILS SHEET 1 Plan · 17 Mar 2026
  • COMBINED UTILITIES CORRIDOR TYPICAL DETAILS SHEET 2 Plan · 17 Mar 2026
  • COMBINED UTILITIES CORRIDOR TYPICAL DETAILS SHEET 3 Plan · 17 Mar 2026
  • SITEWIDE PV FIELD ARRAY MASTERPLAN OVERALL - SITE Plan · 17 Mar 2026
  • OPERATIONAL WASTE MANAGEMENT STRATEGY STATEMENT OF CONFORMITY Report · 17 Mar 2026
  • SITE WASTE MANAGEMENT PLAN - STATEMENT OF CONFORMITY Report · 17 Mar 2026
  • BIODIVERSITY CONSTRUCTION MANAGEMENT PLAN AND METHOD STATEMENTS FOR PRECAUTIONAR Report · 17 Mar 2026
  • OVERALL BIODIVERSITY GAIN PLAN: FORM FOR PHASED DEVELOPMENTS Ecological report · 17 Mar 2026
  • PHASE BIODIVERSITY GAIN PLAN: FORM FOR INDIVIDUAL PHASES OF A PHASED DEVELOPMENT Ecological report · 17 Mar 2026
  • WIND DESKTOP ASSESSMENT ADDENDUM Report · 17 Mar 2026
  • EPIC PHASING PLAN Report · 17 Mar 2026
  • AIR QUALITY AND DUST MANAGEMENT PLAN Report · 17 Mar 2026
  • ART STRATEGY REPORT Report · 17 Mar 2026
  • CGI VISUALS Report · 17 Mar 2026
  • LVIA REPRESENTATIVE VIEWS 1 OF 5 Report · 17 Mar 2026
  • LVIA REPRESENTATIVE VIEWS 5 OF 5 Report · 17 Mar 2026
  • LVIA REPRESENTATIVE VIEWS 4 OF 5 Report · 17 Mar 2026
  • LVIA REPRESENTATIVE VIEWS 3 OF 5 Report · 17 Mar 2026
  • LVIA REPRESENTATIVE VIEWS 2 OF 5 Report · 17 Mar 2026
  • SITE - GA LOWER BASEMENT PLAN Plan · 17 Mar 2026
  • SITE - GA LOWER COURTYARD PLAN Plan · 17 Mar 2026
  • SITE - GA UPPER COURTYARD PLAN Plan · 17 Mar 2026
  • SITE - GA UPPER LEVELS PLAN Plan · 17 Mar 2026
  • SITE - GA ROOF PLAN Plan · 17 Mar 2026
  • ILLUSTRATIVE SITE SECTIONS 1 Plan · 17 Mar 2026
  • ILLUSTRATIVE SITE SECTIONS 2 Plan · 17 Mar 2026
  • LOCATION PLAN Plan · 17 Mar 2026
  • SITE BLOCK PLAN Plan · 17 Mar 2026
  • LANDSCAPE PHASING PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - GROUND FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - FIRST FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - SECOND FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - BASEMENT FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - ROOF GA PLAN Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - GA ELEVATIONS 1 OF 3 Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - GA ELEVATIONS 2 OF 3 Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - GA ELEVATIONS 3 OF 3 Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - LONG SECTIONS Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - SHORT SECTIONS Plan · 17 Mar 2026
  • OFFICE 01 AND EMPLOYEE SERVICES - DETAIL ELEVATIONS Plan · 17 Mar 2026
  • OFFICE 03 - GROUND FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 03 - FIRST FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 03 - BASEMENT FLOOR GA PLAN Plan · 17 Mar 2026
  • OFFICE 03 - ROOF GA PLAN Plan · 17 Mar 2026
  • OFFICE 03 - GA ELEVATIONS 1 OF 2 Plan · 17 Mar 2026
  • OFFICE 03 - GA ELEVATIONS 2 OF 2 Plan · 17 Mar 2026
  • OFFICE 03 - LONG GA SECTIONS Plan · 17 Mar 2026
  • OFFICE 03 - SHORT GA SECTIONS Plan · 17 Mar 2026
  • OFFICE 03 - DETAIL ELEVATIONS Plan · 17 Mar 2026
  • CAR PARK - LEVEL B1 GA PLAN Plan · 17 Mar 2026
  • CAR PARK - LEVEL B2 GA PLAN Plan · 17 Mar 2026
  • CAR PARK - COURTYARD LEVEL GA PLAN Plan · 17 Mar 2026
  • CAR PARK - GA SECTIONS Plan · 17 Mar 2026
  • TRAINING FACILITY - GROUND FLOOR GA PLAN Plan · 17 Mar 2026
  • TRAINING FACILITY - BASEMENT FLOOR GA PLAN Plan · 17 Mar 2026
  • TRAINING FACILITY - ROOF GA PLAN Plan · 17 Mar 2026
  • TRAINING FACILITY - GA ELEVATIONS 1 OF 2 Plan · 17 Mar 2026
  • TRAINING FACILITY - GA ELEVATIONS 2 OF 2 Plan · 17 Mar 2026
  • TRAINING FACILITY - GA SECTIONS Plan · 17 Mar 2026
  • TRAINING FACILITY - DETAIL ELEVATIONS Plan · 17 Mar 2026
  • UTILITY BUILDINGS - GROUND FLOOR GA PLAN Plan · 17 Mar 2026
  • UTILITY BUILDINGS - ROOF GA PLAN Plan · 17 Mar 2026
  • UTILITY BUILDINGS - GA ELEVATIONS - NORTH BUILDING Plan · 17 Mar 2026
  • UTILITY BUILDINGS - GA ELEVATIONS - SOUTH BUILDING Plan · 17 Mar 2026
  • UTILITY BUILDINGS - GA SECTIONS Plan · 17 Mar 2026
  • UTILITY BUILDINGS - DETAIL SECTIONS Plan · 17 Mar 2026
  • LANDSCAPE PLANTING PALETTE Landscaping Strategy · 17 Mar 2026
  • LANDSCAPE HARDWORKS PALETTE Landscaping Strategy · 17 Mar 2026
  • OUTLINE SOFT LANDSCAPE SPECIFICATION Landscaping Strategy · 17 Mar 2026
  • LANDSCAPE SITE MASTERPLAN Plan · 17 Mar 2026
  • LANDSCAPE SITE GENERAL ARRANGEMENT PLAN Plan · 17 Mar 2026
  • HARD LANDSCAPE WORKS GENERAL ARRANGEMENT PLAN Plan · 17 Mar 2026
  • SOFT LANDSCAPE WORKS GENERAL ARRANGEMENT PLAN Plan · 17 Mar 2026
  • BOUNDARY TREATMENT PLAN Plan · 17 Mar 2026
  • SITE SECTIONS Plan · 17 Mar 2026
  • SITE SECTIONS - SHEET 2 Plan · 17 Mar 2026
  • HARD LANDSCAPE PLAN - SHEET 1 OF 4 Plan · 17 Mar 2026
  • HARD LANDSCAPE PLAN - SHEET 2 OF 4 Plan · 17 Mar 2026
  • HARD LANDSCAPE PLAN - SHEET 3 OF 4 Plan · 17 Mar 2026
  • HARD LANDSCAPE PLAN - SHEET 4 OF 4 Plan · 17 Mar 2026
  • PLANTING STRATEGY PLAN - SHEET 1 OF 4 Plan · 17 Mar 2026
  • PLANTING STRATEGY PLAN - SHEET 2 OF 4 Plan · 17 Mar 2026
  • PLANTING STRATEGY PLAN - SHEET 3 OF 4 Plan · 17 Mar 2026
  • PLANTING STRATEGY PLAN - SHEET 4 OF 4 Plan · 17 Mar 2026
  • SOFT LANDSCAPE DETAILS - SHEET 1 OF 2 Plan · 17 Mar 2026
  • SOFT LANDSCAPE DETAILS - SHEET 2 OF 2 Plan · 17 Mar 2026
  • BROOK RELOCATION PLAN AND SECTIONS Plan · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 1 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 2 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 3 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 4 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 31 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 30 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 29 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 28 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 27 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 26 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 25 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 24 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 23 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 22 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 21 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 20 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 19 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 18 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 17 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 16 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 15 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 14 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 13 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 12 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 11 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 10 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 9 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 8 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 7 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 6 OF 31 Landscaping Strategy · 17 Mar 2026
  • PLANTING SCHEDULE - SHEET 5 OF 31 Landscaping Strategy · 17 Mar 2026
  • BIODIVERSITY NET GAIN (BNG) METRIC Ecological report · 17 Mar 2026
  • BIODIVERSITY NET GAIN (BNG) METRIC Ecological report · 17 Mar 2026
  • PLANNING STATEMENT Planning Statement · 17 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bristol, City of granted permission on 12 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Bristol, City of

  • 26/P/1513/S73 Refused

    82 Clevedon Road Tickenham Clevedon BS21 6RD

    Section 73 application to amend condition 6 (construction environmental management plan (CEMP)) attached to planning permission 25/P/2193/S73 (Section 73 application to vary condition 2 (plans) attached to planning permission 24/P/2543/FUL (erection of 4no. dwellings with private access drive, detached garages, demolition of domestic shed and associated works) (to allow for change of house types proposed.) To allow for an amendment to the wording removing reference to pre-commencement.

    Received 21 Jul, published by the council 31 Jul 2026 Amendments
  • 26/P/1640/S73 Granted

    Red Rock Barn Tickenham Hill Tickenham Clevedon BS21 6SW

    Section 73 application to vary Condition 2 (Plans) attached to permission 23/P/1676/FUL (Proposed conversion and extension by the erection of a single storey front and a single storey side extension and increase in height of existing builders store by 125mm to create 1no. three bed residential dwelling) to allow for the approved plans to be updated to reflect adjusted levels. The updated plans provide a unified internal floor level and safer external access without altering the approved footprint, ridge height or appearance

    Received 7 Aug, published by the council 19 Aug 2026 Amendments
  • 26/P/1447/S73 Granted

    Holiday Inn Red Hill Redhill Wrington BS40 5RB

    Section 73 application to vary condition 1 attached to planning permission 19/P/3160/MMA (minor material amendment to 17/P/0784/MMA (for extensions and alterations to the hotel)) to allow for revisions to external design of approved extension and car park/site layout, slight revision to footprint of extension's northern elevation, revision to roof appearance to include PV panels across existing and extended areas.

    Received 9 Jul, published by the council 31 Jul 2026 Amendments
  • 26/P/1118/S73 Granted

    47 Bristol Road Lower Weston-super-Mare BS23 2PX

    Section 73 application to vary condition 2 (Plans) and satisfy condition 7 (Arboricultural report) attached to permission 24/P/0365/FUL (Proposed roof extension to the rear roof section to increase room provision and the quality. Erection of a single storey extension to the laundry outbuilding to allow the relocation of administration office space and the provision of a staff training facility.) To allow for the proposed front outbuilding to be widened eastward by a few metres and slight adjustment to the roof pitch together with the introduction of solar panels to the west facing roof slope. Full Tree Protection Plan and Arboricultural Method Statement, superseding the requirement in Condition 7 of the original permission.

    Received 27 May, published by the council 21 Jul 2026 Amendments
  • 26/P/1522/NMA Granted

    17 - 21 High Street Weston-super-Mare BS23 1HA

    Non-material amendment to application 23/P/0985/FUL (Conversion of existing mixed use retail and residential building to create four ground floor retail units (Use Class E) and 40no. residential units above. Works to include demolition of existing third floor and erection of extended third floor; insertion of new and replacement of existing windows and doors; creation of balconies to flats.) to allow for the removal of the proposed ramp to the front elevation of the building.

    Received 21 Jul, published by the council 31 Jul 2026 Amendments