Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

Granted Bristol, City of 26/P/1540/NMA Non Material Amendment

Relates to 26/P/0606/S73

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).

As published by the council, reference 26/P/1540/NMA

Application record

Reference
26/P/1540/NMA
Type
Non Material Amendment
Status
Decided
Decision
Approve
Received
23 Jul 2026
Validated
23 Jul 2026
Decided
31 Jul 2026
Ward
Long Ashton
Parish
Long Ashton
Decision by
Delegated Decision

Site history

Applications at this address on the Bristol, City of register

This site has had 14 applications since 2025: 13 approved, 0 refused.

  • 26/P/1355/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.

    Decided 22 Jul 2026 Conditions
  • 26/P/1283/NMA Awaiting decision

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP

    Submitted 18 Jun 2026 Amendments
  • 26/P/0765/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.

    Decided 17 Apr 2026 Amendments
  • 26/P/0609/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.

    Decided 20 May 2026 Conditions
  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments
  • 26/P/0340/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.

    Decided 20 Mar 2026 Conditions
  • 26/P/0273/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.

    Decided 23 Feb 2026 Conditions
  • 26/P/0043/NMA Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.

    Decided 14 Jan 2026 Amendments
  • 25/P/2656/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to discharge condition 23 (Loop Road Bridge Details) from application 25/P/1496/FU2.

    Decided 22 Jan 2026 Conditions
  • 25/P/2548/AOC Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Request to partially discharge conditions 8 (Large Scale Details) and 9 (Material Samples) from Phase 1 of application 25/P/1496/FU2.

    Decided 5 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 23 Jul 2026

    Received by Bristol, City of

  2. 31 Jul 2026

    Decision issued: Approve

  3. 31 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 26/P/0606/S73 Granted

    Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton

    Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.

    Decided 12 Jun 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Rapleys LLP Agent

705 applications on PlanIndex · across 125 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Epic Bristol Limited Applicant, registered in Salford

Active · incorporated 2016 · Salford

10 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • DECISION (NMA) APPROVE Decision Notice · 31 Jul 2026
  • NORTH SOMERSET OFFICER REPORT Delegated Report · 31 Jul 2026
  • APPLICATIONFORMREDACTED Application Form · 23 Jul 2026
  • SITE LOCATION PLAN OS Extract · 23 Jul 2026
  • PLANNING STATEMENT Planning Statement · 23 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Bristol, City of granted permission on 31 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Bristol, City of

  • 26/P/1118/S73 Granted

    47 Bristol Road Lower Weston-super-Mare BS23 2PX

    Section 73 application to vary condition 2 (Plans) and satisfy condition 7 (Arboricultural report) attached to permission 24/P/0365/FUL (Proposed roof extension to the rear roof section to increase room provision and the quality. Erection of a single storey extension to the laundry outbuilding to allow the relocation of administration office space and the provision of a staff training facility.) To allow for the proposed front outbuilding to be widened eastward by a few metres and slight adjustment to the roof pitch together with the introduction of solar panels to the west facing roof slope. Full Tree Protection Plan and Arboricultural Method Statement, superseding the requirement in Condition 7 of the original permission.

    27 May 2026 Amendments
  • 26/P/1736/NMA Granted

    71 Slade Road Portishead BS20 6AP

    Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.

    21 Aug 2026 Amendments
  • 26/P/1182/S73 Granted

    Purn Farm Industrial Estate Bridgwater Road Bleadon Weston-super-Mare BS24 0AN

    Section 73 application to vary condition 1 (plans) attached to 26/P/0103/S73 (Non-material amendment to application 07/P/2465/F (Erection of 18no purpose built industrial units for B1/B8 existing use following the demolition of existing buildings.) to enable a reduction in the approved height of the Block B building and to allow for Drawing 6D - Proposed Plans and Elevation to Phase 2 Block B to be replaced with Drawing 6E - Proposed Plans and Elevations to Phase 2 Block B with alterations to approved fenestration

    3 Jun 2026 Amendments
  • 26/P/1440/S73 Granted

    Watersmeet Bath Road Blagdon BS40 7SE

    Section 73 application to vary condition 2 (plans) and remove condition 4 (BNG requirement) attached to planning permission 25/P/2646/FUL (proposed demolition of existing dwelling with subsequent erection of 1no. new dwelling and detached carport. Expansion of existing hardstanding and associated landscaping) to allow for redesign of proposed dwelling and car port.

    9 Jul 2026 Amendments
  • 26/P/1314/S73 Withdrawn

    15 Bishops Road Cleeve BS49 4NQ

    Section 73 application to vary condition 2 (plans) attached to permission 25/P/1655/FUH (Proposed demolition of existing rear conservatory, front porch and side extension with subsequent erection of single storey front, rear and side extensions. Loft conversion and roofing alterations including the creation of front, side and rear gables, rear and side flat-roof dormers and an integrated rear balcony. Fenestration alterations throughout and creation of off-road parking with vehicular access via the removal and replacement of existing boundary wall.) to allow for the removal of the front bedroom extensions and large entrance overhanging porch and roof and retention of the existing bedroom bay window and kitchen window. Reduction and change of design for entrance porch, removal of approved first floor rear extension. Changes to loft conversion with dormer roof and windows to rear and re-alignment/reduction in footprint of side storage area to suit neighbouring boundary and minor fenestration changes.