Planning application
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to allow for an alteration to the approved phasing plan governed by condition 7 by moving the Auditorium Loop Road from Phase One of the development to Phase Three of the development.
As published by the council, reference 25/P/2536/NMA
Application record
- Reference
- 25/P/2536/NMA
- Type
- Non Material Amendment
- Status
- Decided
- Decision
- Approve
- Received
- 5 Dec 2025
- Validated
- 5 Dec 2025
- Decided
- 11 Dec 2025
- Ward
- Long Ashton
- Parish
- Long Ashton
- Decision by
- Delegated Decision
Site history
Applications at this address on the Bristol, City of register
This site has had 14 applications since 2025: 13 approved, 0 refused.
-
26/P/1540/NMA Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Non-Material amendment to application 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.) to alter the wording of condition 35 (Landscaping).
-
26/P/1355/AOC Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request to discharge condition 12 (Coal Mining) on application 26/P/0606/S73.
-
26/P/1283/NMA Awaiting decision
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Non-material amendment to amend conditions 20 (CEMP) and 22 (working hours) of planning permission 26/P/0606/S73 (Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for; extended working hours on Saturdays, 07:00 to 17:00; for working hours on Sunday, between the hours of 08:00 and 17:00, relating exclusively to site maintenance and general repairs; and updated CEMP
-
26/P/0765/NMA Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Non-Material amendment to application 25/P/1496/FU2 (Section 73 application to amend application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to Office Building One, both utility buildings, the basement car park, sitewide landscaping, the solar PV field, the borefield and sitewide lighting.) to amend Condition 22 (Working Hours) to allow a temporary deviation from the agreed construction hours.
-
26/P/0609/AOC Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request to partially discharge condition 35 (Landscaping Scheme) in relation to Zone 1 of application 25/P/1496/FU2.
-
26/P/0606/S73 Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Section 73 application to amend application 25/P/1496/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works) to allow for amendments to the Training Centre, Culinary Centre, Office Building One and Office Building Three, both utilities buildings, the basement car park and wider access infrastructure, utilities/drainage, and site wide landscaping.
-
26/P/0340/AOC Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request to Discharge conditions 20 (Construction Environmental Management Plan), 21 (Air Quality and Dust Management Plan), 26 (Groundwater), 32 (Biodiversity Net Gain Phasing Plan), 42 (Biodiversity Construction Management Plan), 45 (Precautionary Method of Working) and 49 (Highway Condition Survey) from application 25/P/1496/FU2.
-
26/P/0273/AOC Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request to discharge conditions 47 (Gurney Roundabout Details) and 48 (Brook Gate/Colliters Way Details) from application 25/P/1496/FU2.
-
26/P/0043/NMA Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Non-material amendment to application 23/P/2185/FU2 (Hybrid planning application (full and outline elements) with Environmental Statement for the construction of new office campus (Use (Class E(g)(i)) with associated external and below ground works. Full application (on a phased basis) comprising three office buildings, culinary building, training centre and auditorium. New accesses from the public highway, internal site roads and footpaths, public realm works, site drainage, landscaping, solar PV field, ancillary plant, servicing and other associated works. Below ground works including ancillary plant, car and cycle parking and geothermal borefield. Outline application comprising two further office buildings (access, layout, scale and landscaping for approval, appearance to be reserved for subsequent approval) [amended description].) To allow for an amendment to the description by replacing the word 'building' in the phrase culinary building to 'centre', so that it reads 'culinary centre', to ensure conformity between the description of uses relating to culinary and training activities.
-
25/P/2656/AOC Granted
Land SW Of Long Ashton Park And Ride Off Gurney Roundabout (A370) And Colliters Way Long Ashton
Request to discharge condition 23 (Loop Road Bridge Details) from application 25/P/1496/FU2.
Timeline
Dates from the published record
-
5 Dec 2025
Received by Bristol, City of
-
11 Dec 2025
Decision issued: Approve
-
21 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
638 applications on PlanIndex · across 117 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Bristol, City of granted permission on 11 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Bristol, City of
-
26/P/1314/S73 Withdrawn
15 Bishops Road Cleeve BS49 4NQ
Section 73 application to vary condition 2 (plans) attached to permission 25/P/1655/FUH (Proposed demolition of existing rear conservatory, front porch and side extension with subsequent erection of single storey front, rear and side extensions. Loft conversion and roofing alterations including the creation of front, side and rear gables, rear and side flat-roof dormers and an integrated rear balcony. Fenestration alterations throughout and creation of off-road parking with vehicular access via the removal and replacement of existing boundary wall.) to allow for the removal of the front bedroom extensions and large entrance overhanging porch and roof and retention of the existing bedroom bay window and kitchen window. Reduction and change of design for entrance porch, removal of approved first floor rear extension. Changes to loft conversion with dormer roof and windows to rear and re-alignment/reduction in footprint of side storage area to suit neighbouring boundary and minor fenestration changes.
-
26/P/1329/S73 Granted
Plot A5 At Junction Of Beaufighter Road And Cross Road Weston Business Quarter Weston-super-Mare BS24 8EE
Section 73 application to vary conditions 2,3,5,6,15 & 19 attached to permission 21/P/1208/FUL (Full application for the construction of 4no. industrial buildings (Class E(g) and/or B8) and associated access roads, parking and landscaping.) as amended by 26/P/1080/NMA. For the construction of industrial buildings (Class E(g) and/or B8) and associated access roads, parking and landscaping to show the amalgamation of two approved buildings, creation of an additional unit, along with associated elevational, floor plan and site layout amendments, and all associated development.
-
26/P/1740/S73 Awaiting decision
Argentum Lodge 81 Silver Street Nailsea BS48 2DS
Section 73 application to vary condition 2 (Plans) attached to permission 26/P/0129/FUL (Erection of two storey extension to east elevation with dormer to north elevation roof, associated modifications to car parking areas, relocation of refuse store, to increase the number of bedrooms, improve the quality of internal communal spaces, and to create a dedicated servicing bay.) To allow for minor amendments to the external landscaping design that have resulted from post consent technical design stages.
-
26/P/1736/NMA Awaiting decision
71 Slade Road Portishead Bristol BS20 6AP
Non-material amendment to application 26/P/0423/FUH (Proposed demolition of existing single storey lean-to and erection of a single storey rear extension.) to allow for the removal of an approved rooflight.
-
26/P/1086/S73 Granted
Court House Farm Marsh Lane Easton-in-Gordano BS20 0NE
Section 73 application to vary condition 9 attached to permission 23/P/0563/FUL (Application to remove condition 19 (access - highways safety) attached to planning permission 16/P/1987/F (development of the site for port related uses. Provision of hardstanding for storage of cargo in transit (e.g. motor vehicles) through Royal Portbury Docks,with associated infrastructure, including a crossing over the disused railway by a crossing at grade and or vehicle bridge between the current Royal Portbury Dock estate and the proposed site) to allow for the wording of condition 9 (Condition 16) to be amended to reflect the uncertain requirement for, and timing of, the construction of the vehicular bridge across the railway line.