Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00832/PNELEC

Ferry Terminal Colintraive Argyll And Bute

Awaiting decision Argyll and Bute Prior Notif. ELECTRICITY works

Proposal

Erection of 33kv substation and installation of associated underground cable

As published by the council, reference 26/00832/PNELEC

Timeline

Dates from the published record

  1. 14 May 2026

    Received by Argyll and Bute

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About other applications

How this application type works

This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.

More on other applications in our guide

Nearby applications

Within 500 metres

  • 25/02132/PP Granted

    The Ferry Terminal Colintraive Argyll And Bute PA22 3AP

    Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging

    22 Dec 2025 59m away Full applications
  • 26/00469/PP Awaiting decision

    Cul Mhor Colintraive Argyll And Bute PA22 3AR

    Siting of self catering pod in place of existing domestic garage

    13 Mar 2026 361m away Full applications
  • 26/00659/SCREEN Awaiting decision

    Land North Of The Ferry Terminal Colintraive Argyll And Bute

    Screening Opinion for proposed 33kV overhead line

    20 Apr 2026 365m away Outline
  • 26/01138/ELCNOT Awaiting decision

    Land At Colintraive Argyll And Bute

    Installation of a new 33kV overhead spur

    2 Jul 2026 379m away Other

In Argyll and Bute

  • 26/01220/PNELEC Awaiting decision

    Land At Strone Farm Minard Argyll And Bute

    24 New poles from existing line to connect the 2 new transmission substation buildings

    15 Jul 2026 Other
  • 26/01138/ELCNOT Awaiting decision

    Land At Colintraive Argyll And Bute

    Installation of a new 33kV overhead spur

    2 Jul 2026 Other
  • 26/00995/ELCNOT Awaiting decision

    Land West Of Clachan Farm Kilninver Argyll And Bute

    Installation of 11kV overhead line spur

    10 Jun 2026 Other
  • 26/00958/ELCNOT Decided

    Land At Clachaig Glen Clachaig Argyll And Bute

    Installation of 33kV overhead line

    4 Jun 2026 Other
  • 26/00939/PNELEC Awaiting decision

    Crossaig South Sub Station To High Constellation Wind Farm Skipness Argyll And Bute

    Installation of underground cable connecting Crossaig South Substation to High Constellation Project

    2 Jun 2026 Other