Planning application
26/00832/PNELEC
Ferry Terminal Colintraive Argyll And Bute
Proposal
Erection of 33kv substation and installation of associated underground cable
As published by the council, reference 26/00832/PNELEC
Timeline
Dates from the published record
-
14 May 2026
Received by Argyll and Bute
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Argyll and Bute for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About other applications
How this application type works
This application sits outside the common categories, which can include county matters such as minerals and waste, works by statutory undertakers, demolition notifications and other less frequent procedures. The council record linked below sets out the specific procedure that applies, and the description above is taken directly from the published register.
Nearby applications
Within 500 metres
-
25/02132/PP Granted
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging
-
26/00469/PP Awaiting decision
Cul Mhor Colintraive Argyll And Bute PA22 3AR
Siting of self catering pod in place of existing domestic garage
-
26/00659/SCREEN Awaiting decision
Land North Of The Ferry Terminal Colintraive Argyll And Bute
Screening Opinion for proposed 33kV overhead line
-
26/01138/ELCNOT Awaiting decision
Land At Colintraive Argyll And Bute
Installation of a new 33kV overhead spur
Other other applications
In Argyll and Bute
-
26/01220/PNELEC Awaiting decision
Land At Strone Farm Minard Argyll And Bute
24 New poles from existing line to connect the 2 new transmission substation buildings
-
26/01138/ELCNOT Awaiting decision
Land At Colintraive Argyll And Bute
Installation of a new 33kV overhead spur
-
26/00995/ELCNOT Awaiting decision
Land West Of Clachan Farm Kilninver Argyll And Bute
Installation of 11kV overhead line spur
-
26/00958/ELCNOT Decided
Land At Clachaig Glen Clachaig Argyll And Bute
Installation of 33kV overhead line
-
26/00939/PNELEC Awaiting decision
Crossaig South Sub Station To High Constellation Wind Farm Skipness Argyll And Bute
Installation of underground cable connecting Crossaig South Substation to High Constellation Project