Planning application
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of extension and alterations
As published by the council, reference 24/01514/PP
Application record
- Reference
- 24/01514/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Application Approved
- Received
- 19 Aug 2024
- Validated
- 23 Sep 2024
- Decided
- 6 Dec 2024
- Ward
- Cowal
- Parish
- Colintraive And Glendaruel CC
- Decision by
- Local Delegated Decision
- Postcode
- PA22 3AP
Site history
Applications at this address on the Argyll and Bute register
This site has had 3 applications since 2024: 3 approved, 0 refused.
-
25/02132/PP Granted
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging
-
25/01189/PP Granted
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Erection of 8 metre high de mountable communications pole
Timeline
Dates from the published record
-
19 Aug 2024
Received by Argyll and Bute
-
23 Sep 2024
Validated
Checked as complete and ready for consideration.
-
6 Dec 2024
Decision issued: Application Approved
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 6 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging
Granted Full applications -
The Ferry Terminal Colintraive Argyll And Bute PA22 3AP
Erection of 8 metre high de mountable communications pole
Granted Full applications -
Ferry Terminal Colintraive Argyll And Bute
100% historically approved · decision due ~9 Jul
Erection of 33kv substation and installation of associated underground cable
Awaiting decision Other -
Cul Mhor Colintraive Argyll And Bute PA22 3AR
98% historically approved · decision due ~1 Jul
Siting of self catering pod in place of existing domestic garage
Awaiting decision Full applications -
Land North Of The Ferry Terminal Colintraive Argyll And Bute
99% historically approved · decision due ~15 Jun
Screening Opinion for proposed 33kV overhead line
Awaiting decision Outline
Other full applications
In Argyll and Bute
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track
-
25/00238/PP Granted
Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS
Erection of 2 pods for short term letting and associated works
-
26/00550/PP Granted
7 Duchess Drive Helensburgh Argyll And Bute G84 9PR
Erection of single storey front extension
-
26/00652/PP Granted
The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR
Demolition of existing extensions and bay window and erection of new single storey extensions