Skip to content
PlanIndex Get alerts
Menu

Planning application

Cul Mhor Colintraive Argyll And Bute PA22 3AR

Awaiting decision Argyll and Bute 26/00469/PP Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Siting of self catering pod in place of existing domestic garage

As published by the council, reference 26/00469/PP

Application record

Reference
26/00469/PP
Type
Planning Permission
Status
Awaiting decision
Received
13 Mar 2026
Validated
6 May 2026
Ward
Cowal
Parish
Colintraive And Glendaruel CC
Postcode
PA22 3AR

Site history

Applications at this address on the Argyll and Bute register

This site has had 2 applications since 2024: 0 approved, 1 refused.

  • 24/00845/PP Refused

    Cul Mhor Colintraive Argyll And Bute PA22 3AR

    Siting of self catering pod in place of existing domestic garage

    Decided 18 Jul 2025 Full applications

Timeline

Dates from the published record

  1. 13 Mar 2026

    Received by Argyll and Bute

  2. 6 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Argyll and Bute took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Plans Planning and Design Agent, a planning consultancy

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Argyll and Bute for determination, against a statutory target of eight weeks. Over the last year Argyll and Bute decided full applications in a median of 107 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Cul Mhor Colintraive Argyll And Bute PA22 3AR

    24/00845/PP Submitted 8 May 2024 50 yards away

    Siting of self catering pod in place of existing domestic garage

    Refused Full applications 20 docs
  • Land At Colintraive Argyll And Bute

    26/01138/ELCNOT Submitted 2 Jul 2026 150 yards away

    100% historically approved · decision due ~27 Aug

    Installation of a new 33kV overhead spur

    Awaiting decision Other
  • Land North Of The Ferry Terminal Colintraive Argyll And Bute

    26/00659/SCREEN Submitted 20 Apr 2026 150 yards away

    90% historically approved · decision due ~15 Jun

    Screening Opinion for proposed 33kV overhead line

    Awaiting decision Outline
  • The Ferry Terminal Colintraive Argyll And Bute PA22 3AP

    26/01876/NMA Submitted 14 Oct 2026 300 yards away

    91% historically approved · decision due ~9 Dec

    Non Material Amendment relatvie to Planning Permission 25/02132/PP (Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging) Various changes

    Awaiting decision Amendments
  • The Ferry Terminal Colintraive Argyll And Bute PA22 3AP

    24/01514/PP Submitted 19 Aug 2024 350 yards away

    Erection of extension and alterations

    Granted Full applications Extension 25 docs
  • The Ferry Terminal Colintraive Argyll And Bute PA22 3AP

    25/02132/PP Submitted 22 Dec 2025 350 yards away

    Erection of SSEN Substation and LV Switchgear room. Installation of 6 subsurface cable ducts and installation of a shore power arm to enable ferry charging

    Granted Full applications

In Argyll and Bute

  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications
  • 25/01665/PP Withdrawn

    Land East Of Former Gunpowder Store Kames Argyll And Bute

    Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track

    Received 7 Oct, published by the council 28 Jul 2026 Full applications