Planning application
Bray Studios Down Place Water Oakley And Land At Water Oakley Farm Windsor Road Water Oakley Windsor
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Screening Opinion from the Council under Regulation 6 (1) of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in respect of Redevelopment to create new film and TV studios, incorporating demolition, retention of 2no. existing sound stages, rehearsal building, backlot and ancillary offices on a permanent basis, construction of further new production facilities including 7 no. additional sound stages, workshops, ancillary offices and other production facilities, totalling @ 30,000 m2 of commercial floorspace, the use of Waterford House and Steading as ancillary accommodation, parking, landscaping and new vehicular access off Windsor Road.
As published by the council, reference 21/01780/EIASCR
Application record
- Reference
- 21/01780/EIASCR
- Type
- EIA Screening
- Status
- Awaiting decision
- Decision
- Granted As published: No Objection
- Received
- 7 Jun 2021
- Validated
- 7 Jun 2021
- Decided
- 23 Jul 2021
- Ward
- Bray
- Parish
- Bray Parish
- Decision by
- Delegated
Timeline
Dates from the published record
-
7 Jun 2021
Received by Windsor and Maidenhead
-
23 Jul 2021
Decision issued: No Objection
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Windsor and Maidenhead granted permission on 23 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bray Studios And Land At Bray Studios Down Place Water Oakley Windsor
Details required by condition 13 (drainage strategy) of planning permission 19/03295 for Retention of existing temporary buildings and erection of new temporary buildings and structures at Bray Studios in connection with continued commercial filming use; and the change of use of (adjacent or other) land from commercial (B1/B2) storage, including open storage (B8), agricultural processing (sui generis) to temporary use for commercial filming, incorporating associated temporary buildings and structures (including earth bunds) and hardstanding for parking and storage.
Granted Conditions 8 docs -
Bray Studios And Land At Bray Studios Down Place Water Oakley Windsor
Details required by condition 10 (lighting) of planning permission 19/03295 for the retention of existing temporary buildings and erection of new temporary buildings and structures at Bray Studios in connection with continued commercial filming use; and the change of use of (adjacent or other) land from commercial (B1/B2) storage, including open storage (B8), agricultural processing (sui generis) to temporary use for commercial filming, incorporating associated temporary buildings and structures (including earth bunds) and hardstanding for parking and storage.
Granted Conditions 9 docs -
Bray Studios And Land At Bray Studios Down Place Water Oakley Windsor
Details required by condition 3 (details of outdoor filming) 14 (LLFA backlot) of planning permission 19/03295 for the retention of existing temporary buildings and erection of new temporary buildings and structures at Bray Studios in connection with continued commercial filming use; and the change of use of (adjacent or other) land from commercial (B1/B2) storage, including open storage (B8), agricultural processing (sui generis) to temporary use for commercial filming, incorporating associated temporary buildings and structures (including earth bunds) and hardstanding for parking and storage.
Decided Conditions 6 docs -
Bray Studios Down Place Water Oakley Windsor SL4 5UG
83% historically approved · decision due ~8 Sep
Consent for the restoration of Down Place House, including provision of lift, changes to plan form, restoration works, thermal upgrades, inclusion of MEP services, additional fenestration, fire exit to east wing, and new external staircase and balustrade on the northern elevation. (The Proposed Development).
Awaiting decision Heritage and listed buildings Windows or glazing 115 docs -
Bray Studios Down Place Water Oakley Windsor SL4 5UG
70% historically approved · decision due ~8 Sep
Redevelopment and expansion of the existing film and television studio incorporating demolition; restoration of Down Place House; retention of existing sound stages on a permanent basis and associated works; relocation of existing ancillary office and production facilities; construction of 6no. new sound stages, workshops, multi-storey car park (including security, café and cycle parking), and associated office and production facilities; backlot; landscaping; and new vehicular access and egress off Windsor Road.
Awaiting decision Full applications Demolition 344 docs -
Bray Studios Down Place Water Oakley Windsor SL4 5UG
Non material amendments to planning permission 21/02245 for alterations to electrical infrastructure including the removal, alteration and addition of electrical substations.
Granted Amendments 28 docs
Other outline applications
In Windsor and Maidenhead
-
26/02453/PIP Awaiting decision
Wych Elms Oakley Green Road Oakley Green Windsor SL4 4QF
Erection of dwellinghouse.
-
26/02369/EIASCR Awaiting decision
Land On The East Side of Royal Windsor Way Eton Windsor SL4 6DU
Screening Opinion from the Council under Regulation 6 of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in relation to the Construction and operation of an agri-photovoltaics facility up to 5 MWp capacity with associated works, equipment and infrastructure.
-
26/01966/PIP Refused
Snapper Holyport Road Maidenhead SL6 2HA
3 no. dwellings with landscaping and hardstanding following demolition of existing dwelling
-
26/02219/OUT Awaiting decision
Land Adjacent To Morland House Hungerford Lane Shurlock Row Reading
Outline application for Access only to be considered at this stage with all other matters to be reserved for the construction of 8 no. dwellings.
-
26/01442/EIASCO Decided
Horton Quarry And Landfill Horton Road Horton Slough
EIA Scoping Opinion Request letter and supporting EIA Scoping Report under Regulation 15 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in respect for further development of Horton Quarry and Landfill.