Planning application

Southampton To London Pipeline Woodlands Bramdean Hampshire

Granted Winchester 21/01599/DIC Details in Compliance

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Requirement Compliance Submission in respect of Requirement 12 (Landscape and Ecology Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

As published by the council, reference 21/01599/DIC

Application record

Reference
21/01599/DIC
Type
Details in Compliance
Status
Decided
Decision
Granted As published: Application Permitted
Received
4 Jun 2021
Validated
4 Jun 2021
Decided
13 Jul 2021
Ward
UPPER MEON VALLEY WARD
Parish
Bramdean And Hinton Ampner
Decision by
Delegated Decision

Site history

Applications at this address on the Winchester register

This site has had 5 applications since 2021: 5 approved, 0 refused.

  • 21/01595/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 7 (Construction Traffic) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 9 Jul 2021 Conditions
  • 21/01598/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.

    Decided 9 Jul 2021 Conditions
  • 21/01597/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 9 (Surface Water and Foul Water Drainage) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 9 Jul 2021 Conditions
  • 21/01594/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 13 Jul 2021 Conditions

Timeline

Dates from the published record

  1. 4 Jun 2021

    Received by Winchester

  2. 13 Jul 2021

    Decision issued: Application Permitted

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Winchester granted permission on 13 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01595/DIC Submitted 4 Jun 2021 50 yards away

    Requirement Compliance Submission in respect of Requirement 7 (Construction Traffic) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 3 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01598/DIC Submitted 4 Jun 2021 50 yards away

    Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.

    Granted Conditions 4 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01597/DIC Submitted 4 Jun 2021 50 yards away

    Requirement Compliance Submission in respect of Requirement 9 (Surface Water and Foul Water Drainage) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 5 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01594/DIC Submitted 4 Jun 2021 50 yards away

    Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 14 docs

In Winchester

  • 26/01788/DIC Awaiting decision

    Land East Of Darnel Road Waterlooville Hampshire

    Discharge of conditions 7 (Site plan and access visibility splays), 8 (Drainage strategy and catchment layout), 9 (Construction Traffic Management Plan), 11 (Employment and skills plan), 13 (Proposed materials), 25 (Proposed On-Street Parking Control Plan), and 27 (Site sections and Topographic surveys) for application 21/01005/FUL

    Received 27 Aug, published by the council 29 Sep 2026 Conditions
  • 26/00171/DIC Granted

    Shedfield House Dairy Sandy Lane Shedfield Hampshire

    Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL

    Received 29 Jan, published by the council 26 Jul 2026 Conditions
  • 26/01730/DIC Awaiting decision

    Sutton Scotney Services Southbound A34 Sutton Scotney Winchester Hampshire SO21 3JY

    Discharge Condition 3 (External Sample Details), 4 (Construction Management Plan), 8 (Details of Chemical and Petrol Storage), 9 (Surface water disposal scheme), 10 (Foul water disposal scheme) for application 26/00072/FUL

    Received 20 Aug, published by the council 27 Aug 2026 Conditions
  • 26/01707/DIC Awaiting decision

    Hangar Nurseries Thompsons Lane Owslebury Winchester Hampshire SO21 1JH

    Discharge conditions 5 (Biodiversity gain plan), 6 (Habitat Management and Monitoring Plan), 10 (details of biodiversity enhancement measures) and 12 (Details of surface water drainage measures) for application 26/00036/FUL

    Received 18 Aug, published by the council 26 Aug 2026 Conditions
  • 26/01709/DIC Awaiting decision

    The Happy Farm Winchester Road Waltham Chase Southampton Hampshire SO32 2LL

    Discharge conditions 3 (Materials), 4 (Consult Southern Water), 6 (Construction Environmental Management Plan), 8 (Protective Measures), 11 (Supervision of Construction Activity) and 16 (Flood Resilience and Resistance Strategy) for applications 25/02530/FUL

    Received 18 Aug, published by the council 1 Sep 2026 Conditions