Planning application
Southampton To London Pipeline Woodlands Bramdean Hampshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Requirement Compliance Submission in respect of Requirement 9 (Surface Water and Foul Water Drainage) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
As published by the council, reference 21/01597/DIC
Application record
- Reference
- 21/01597/DIC
- Type
- Details in Compliance
- Status
- Decided
- Decision
- Granted As published: Application Permitted
- Received
- 4 Jun 2021
- Validated
- 4 Jun 2021
- Decided
- 9 Jul 2021
- Ward
- UPPER MEON VALLEY WARD
- Parish
- Bramdean And Hinton Ampner
- Decision by
- Delegated Decision
Site history
Applications at this address on the Winchester register
This site has had 5 applications since 2021: 5 approved, 0 refused.
-
21/01595/DIC Granted
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 7 (Construction Traffic) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
-
21/01599/DIC Granted
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 12 (Landscape and Ecology Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
-
21/01598/DIC Granted
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.
-
21/01594/DIC Granted
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
Timeline
Dates from the published record
-
4 Jun 2021
Received by Winchester
-
9 Jul 2021
Decision issued: Application Permitted
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Winchester granted permission on 9 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 7 (Construction Traffic) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
Granted Conditions 3 docs -
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 12 (Landscape and Ecology Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
Granted Conditions 2 docs -
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.
Granted Conditions 4 docs -
Southampton To London Pipeline Woodlands Bramdean Hampshire
Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.
Granted Conditions 14 docs
Other condition discharge and variation applications
In Winchester
-
26/01788/DIC Awaiting decision
Land East Of Darnel Road Waterlooville Hampshire
Discharge of conditions 7 (Site plan and access visibility splays), 8 (Drainage strategy and catchment layout), 9 (Construction Traffic Management Plan), 11 (Employment and skills plan), 13 (Proposed materials), 25 (Proposed On-Street Parking Control Plan), and 27 (Site sections and Topographic surveys) for application 21/01005/FUL
-
26/00171/DIC Granted
Shedfield House Dairy Sandy Lane Shedfield Hampshire
Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL
-
26/01730/DIC Awaiting decision
Sutton Scotney Services Southbound A34 Sutton Scotney Winchester Hampshire SO21 3JY
Discharge Condition 3 (External Sample Details), 4 (Construction Management Plan), 8 (Details of Chemical and Petrol Storage), 9 (Surface water disposal scheme), 10 (Foul water disposal scheme) for application 26/00072/FUL
-
26/01707/DIC Awaiting decision
Hangar Nurseries Thompsons Lane Owslebury Winchester Hampshire SO21 1JH
Discharge conditions 5 (Biodiversity gain plan), 6 (Habitat Management and Monitoring Plan), 10 (details of biodiversity enhancement measures) and 12 (Details of surface water drainage measures) for application 26/00036/FUL
-
26/01709/DIC Awaiting decision
The Happy Farm Winchester Road Waltham Chase Southampton Hampshire SO32 2LL
Discharge conditions 3 (Materials), 4 (Consult Southern Water), 6 (Construction Environmental Management Plan), 8 (Protective Measures), 11 (Supervision of Construction Activity) and 16 (Flood Resilience and Resistance Strategy) for applications 25/02530/FUL