Skip to content
PlanIndex Get alerts
Menu

Planning application

Southampton To London Pipeline Woodlands Bramdean Hampshire

Granted Winchester 21/01595/DIC Details in Compliance

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Requirement Compliance Submission in respect of Requirement 7 (Construction Traffic) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

As published by the council, reference 21/01595/DIC

Application record

Reference
21/01595/DIC
Type
Details in Compliance
Status
Decided
Decision
Application Permitted
Received
4 Jun 2021
Validated
4 Jun 2021
Decided
9 Jul 2021
Ward
UPPER MEON VALLEY WARD
Parish
Bramdean And Hinton Ampner
Decision by
Delegated Decision

Site history

Applications at this address on the Winchester register

This site has had 5 applications since 2021: 5 approved, 0 refused.

  • 21/01599/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 12 (Landscape and Ecology Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 13 Jul 2021 Conditions
  • 21/01598/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.

    Decided 9 Jul 2021 Conditions
  • 21/01597/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 9 (Surface Water and Foul Water Drainage) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 9 Jul 2021 Conditions
  • 21/01594/DIC Granted

    Southampton To London Pipeline Woodlands Bramdean Hampshire

    Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Decided 13 Jul 2021 Conditions

Timeline

Dates from the published record

  1. 4 Jun 2021

    Received by Winchester

  2. 9 Jul 2021

    Decision issued: Application Permitted

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Winchester granted permission on 9 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01599/DIC Submitted 4 Jun 2021 0m away

    Requirement Compliance Submission in respect of Requirement 12 (Landscape and Ecology Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 2 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01598/DIC Submitted 4 Jun 2021 0m away

    Requirement Compliance Submission in respect of Requirement 11 (Archaeology) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between (451 208E, 114 388N) and (451 561E, 114 713N), in the District of Winchester City.

    Granted Conditions 4 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01597/DIC Submitted 4 Jun 2021 0m away

    Requirement Compliance Submission in respect of Requirement 9 (Surface Water and Foul Water Drainage) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 5 docs
  • Southampton To London Pipeline Woodlands Bramdean Hampshire

    21/01594/DIC Submitted 4 Jun 2021 0m away

    Requirement Compliance Submission in respect of Requirement 6 ( Construction Environmental Management Plan) of Schedule 2 of the Southampton to London Pipeline Development Consent Order 2020 , Nationally Significant Infrastructure Project. This submission specifically applies to the section of works between OS grid reference points (451 561E, 114 713N) and (453 773E, 118 368N), in the District of Winchester City.

    Granted Conditions 14 docs

In Winchester

  • 26/00833/DIC Granted

    13 & 14 Woodman Close Sparsholt Hampshire

    Discharge of condition 3 (Planning Approval Materials), 7 (Landscape Management Plan) and 8 (Boundary Treatments) of application 21/02640/FUL

    21 Apr 2026 Conditions
  • 26/00557/DIC Granted

    Taylors Mead Woodman Lane Sparsholt Winchester Hampshire SO21 2NR

    Original application: 24/00705/LIS Condition: 9 Emptying of water and filling existing underground brick cistern with well-compacted granular fill. Please refer to drawing '6328 002 Cistern' submitted as part of this application.

    17 Mar 2026 Conditions
  • 26/00171/DIC Granted

    Shedfield House Dairy Sandy Lane Shedfield Hampshire

    Discharge of conditions 4 (drainage) and 5A (Partial discharge of archaeology) of planning application 25/01056/FUL

    29 Jan 2026 Conditions
  • 26/01523/S106 Granted

    Land At Southwick Road And School Road Wickham Hampshire

    Discharge Planning Obligation 1.2 (Open Space Land Scheme) of Schedule 3 of the S106 (dated 17/10/2025) for planning application ref: 24/02803/FUL

    23 Jul 2026 Conditions
  • 26/01689/DIC Awaiting decision

    Studland House Deane Down Drove Littleton Winchester Hampshire SO22 6PP

    Discharge condition 5 (Biodiversity Enhancement and Mitigation Plan) for application 26/00277/HOU

    13 Aug 2026 Conditions