Planning application

Airwork House 35 Piccadilly London

Awaiting decision Westminster 26/06358/ADFULL

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details of demolition in associated with phase 2 of the development; detailed design and Risk Assessment Method Statement (RAMS) for all demolition works associated with phase 2 of the development; TfL Infrastructure Protection pursuant to condition 28 of planning permission dated 28th October 2024 (RN 23/05723/FULL)

As published by the council, reference 26/06358/ADFULL

Application record

Reference
26/06358/ADFULL
Status
Pending
Received
17 Sep 2026
Validated
17 Sep 2026

Site history

Applications at this address on the Westminster register

This site has had 6 applications since 2025: 2 approved, 0 refused.

  • 26/05782/NMA Awaiting decision

    Airwork House 35 Piccadilly London

    Amendments to planning permission dated 12 June 2024 (RN: 23/05723/FULL) for which varied condition 1, 14 and 15 and removed condition 13 of planning permission (21/02681/FULL) dated 10 September 2021 which in turn permitted the removal of condition 12 and to vary conditions 5, 19 and 20 of planning permission dated 25 October 2018 (RN: 17/11171/FULL) for, 'Demolition and redevelopment of existing building to provide a new building comprising two sub-basement levels, ground and eight upper floors. Use of part basement and ground floor for retail (Class A1) purposes and use of part of rear ground floor as for either dual/alternative retail (Class A1) or restaurant (Class A3) purposes, use of the remainder of the building for office (Class B1) purposes. Installation of plant at sub-basement level -2, seventh, eighth and roof level. Creation of a terrace at eighth floor level'. NAMELY, to allow the omission of the biodiverse roof at ninth floor level.

    Submitted 24 Aug 2026 Amendments
  • 26/03642/NMA Awaiting decision

    Airwork House 35 Piccadilly London

    Amendments to planning permission dated 12.06.2024 (RN: 23/05723/FULL) for: Variation of Condition 1, 14 and 15 and removal of Condition 13 of planning permission (21/02681/FULL) dated 10 September 2021 for: Demolition and redevelopment of existing building to provide a new building comprising two sub-basement levels, ground and eight upper floors. Use of part basement and ground floor for retail (Class A1) purposes and use of part of rear ground floor as for either dual/alternative retail (Class A1) or restaurant (Class A3) purposes, use of the remainder of the building for office (Class B1) purposes. Installation of plant at sub-basement level -2, seventh, eighth and roof level. Creation of a terrace at eighth floor level'; namley omission of a section of the brise soleil on the Piccadilly Place elevation and the reduction of photovoltaic panels at level 9.

    Submitted 4 Jun 2026 Amendments
  • 26/01720/ADFULL Awaiting decision

    Airwork House 35 Piccadilly London

    Detailed design and Risk Assessment Method Statement (RAMS) for all superstructure works (temporary and permanent) pursuant to condition 28 (3) of planning permission dated 12th June 2024 (RN: 23/05723) in association with London Underground/TfL.

    Submitted 17 Mar 2026 Full applications
  • 26/00253/ADFULL Granted

    Airwork House 35 Piccadilly London

    Detailed drawings of the proposed fixed canopy on Swallow Street pursuant to condition 20 of planning permission dated 12th June 2024 (23/05723/FULL)

    Decided 26 Mar 2026 Full applications
  • 25/08169/ADV Granted

    Airwork House 35 Piccadilly London

    Display of advertising on a hoarding measuring 2.44m x 14.67m, 2.44m x 6.72m and 2.44m x 14.45m for a temporary period from 01/01/2026 until 01/01/2029.

    Decided 18 Mar 2026 Advertising

Timeline

Dates from the published record

  1. 17 Sep 2026

    Received by Westminster

  2. 24 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 12 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Westminster took a median of 86 days over the applications it decided in the last year.

What happens while it is decided

This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster's median decision took 86 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.