Airwork House 35 Piccadilly London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Detailed design and Risk Assessment Method Statement (RAMS) for all superstructure works (temporary and permanent) pursuant to condition 28 (3) of planning permission dated 12th June 2024 (RN: 23/05723) in association with London Underground/TfL.
As published by the council, reference 26/01720/ADFULL
Application record
- Reference
- 26/01720/ADFULL
- Type
- Approval of Details (Full PP)
- Status
- Pending
- Received
- 17 Mar 2026
- Validated
- 17 Mar 2026
- Ward
- West End
Site history
Applications at this address on the Westminster register
This site has had 5 applications since 2025: 1 approved, 0 refused.
-
26/05782/NMA Awaiting decision
Airwork House 35 Piccadilly London
Amendments to planning permission dated 12 June 2024 (RN: 23/05723/FULL) for which varied condition 1, 14 and 15 and removed condition 13 of planning permission (21/02681/FULL) dated 10 September 2021 which in turn permitted the removal of condition 12 and to vary conditions 5, 19 and 20 of planning permission dated 25 October 2018 (RN: 17/11171/FULL) for, 'Demolition and redevelopment of existing building to provide a new building comprising two sub-basement levels, ground and eight upper floors. Use of part basement and ground floor for retail (Class A1) purposes and use of part of rear ground floor as for either dual/alternative retail (Class A1) or restaurant (Class A3) purposes, use of the remainder of the building for office (Class B1) purposes. Installation of plant at sub-basement level -2, seventh, eighth and roof level. Creation of a terrace at eighth floor level'. NAMELY, to allow the omission of the biodiverse roof at ninth floor level.
-
26/03642/NMA Awaiting decision
Airwork House 35 Piccadilly London
Amendments to planning permission dated 12.06.2024 (RN: 23/05723/FULL) for: Variation of Condition 1, 14 and 15 and removal of Condition 13 of planning permission (21/02681/FULL) dated 10 September 2021 for: Demolition and redevelopment of existing building to provide a new building comprising two sub-basement levels, ground and eight upper floors. Use of part basement and ground floor for retail (Class A1) purposes and use of part of rear ground floor as for either dual/alternative retail (Class A1) or restaurant (Class A3) purposes, use of the remainder of the building for office (Class B1) purposes. Installation of plant at sub-basement level -2, seventh, eighth and roof level. Creation of a terrace at eighth floor level'; namley omission of a section of the brise soleil on the Piccadilly Place elevation and the reduction of photovoltaic panels at level 9.
-
26/00253/ADFULL Granted
Airwork House 35 Piccadilly London
Detailed drawings of the proposed fixed canopy on Swallow Street pursuant to condition 20 of planning permission dated 12th June 2024 (23/05723/FULL)
-
25/08169/ADV Awaiting decision
Airwork House 35 Piccadilly London
Display of non illuminated hoarding wrap measuring 2.44m x 14.67m, 2.44m x 6.72m to 33-35 Airwork House.
Timeline
Dates from the published record
-
17 Mar 2026
Received by Westminster
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 61 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
184 applications on PlanIndex · across 16 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Westminster
-
26/06024/FULL Awaiting decision
House Of Commons Palace Of Westminster Parliament Square London SW1A 0AA
Installation of new and replacement electronic equipment within Speaker. (Linked with 26/06025/LBC)
-
26/06017/FULL Awaiting decision
38 Lauderdale Mansions Lauderdale Road London W9 1NE
Installation of an external AC Unit / Heat Pump at roof level.
-
26/05938/FULL Awaiting decision
24 Vincent Square London SW1P 2NJ
Subdivision of existing residential property to create two self-contained 3-bedroom family homes, along with cycle parking and associated external alterations.
-
26/05935/FULL Awaiting decision
47 Hereford Road London W2 5AH
Installation of one number new external condenser unit to the southerly elevation service alley.
-
26/05959/FULL Awaiting decision
Basement And Ground Floor 50 New Bond Street London W1S 1BJ
Installation of three new condensers on the roof, within an existing designated plant area.