Planning application
Fourth Floor 40 New Bond Street London W1S 2RX
Works: Windows or glazing
Relates to 26/03500/FULL
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of planning permission dated 27th July 2026 (26/03500/FULL)
As published by the council, reference 26/05587/ADFULL
Application record
- Reference
- 26/05587/ADFULL
- Status
- Decided
- Received
- 17 Aug 2026
- Validated
- 17 Aug 2026
- Postcode
- W1S 2RX
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2026.
-
26/05688/ADLBC Decided
Fourth Floor 40 New Bond Street London W1S 2RX
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th July 2026 (26/03501/LBC)
-
26/03500/FULL Awaiting decision
Fourth Floor 40 New Bond Street London W1S 2RX
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
-
26/03501/LBC Awaiting decision
Fourth Floor 40 New Bond Street London W1S 2RX
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03500/FULL]
Timeline
Dates from the published record
-
17 Aug 2026
Received by Westminster
-
22 Aug 2026
Added to PlanIndex
-
28 Aug 2026
Status changed to Decided
Previously Pending.
Related applications
Cases linked to this one on the register
-
26/03500/FULL Awaiting decision
Fourth Floor 40 New Bond Street London W1S 2RX
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
After the decision
Westminster has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Westminster's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Fourth Floor 40 New Bond Street London W1S 2RX
89% historically approved · decision due ~12 Oct
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th July 2026 (26/03501/LBC)
Decided Windows or glazing -
39 - 42 New Bond Street London W1S 2SQ
88% historically approved · decision due ~19 May
Installation of plant at roof level within existing acoustic enclosure, new intake and extract louvres within existing openings, and associated pipework and servicing infrastructure. Installation of new HVAC and M&E systems, raised access flooring, new lighting and fit-out, formation of meeting rooms, and refurbishment of the ground floor entrance lobby; together with external alterations comprising. Internal and external refurbishment works, including full internal strip-out and reconfiguration at Levels 3 and 5. (Linked with 26/01899/LBC)
Awaiting decision Full applications 62 docs -
Fourth Floor 40 New Bond Street London W1S 2RX
88% historically approved · decision due ~30 Jul
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
Awaiting decision Full applications Windows or glazing 31 docs -
Fourth Floor 40 New Bond Street London W1S 2RX
90% historically approved · decision due ~30 Jul
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03500/FULL]
Awaiting decision Heritage and listed buildings Windows or glazing 17 docs -
41-42 New Bond Street London W1S 2RZ
Display of a non-illuminated advertising hoarding measuring 7.32m high x 8.62m wide x 3.1m deep, for temporary period from June 2011 to September 2011.
Refused Advertising 4 docs -
41-42 New Bond Street London W1S 2RZ
New shopfront and internal refurbishment of the basement, ground and first floors including relocation of the staircase and lift. Installation of 3 air conditioning units and alterations to the rear of the property.
Withdrawn Heritage and listed buildings Windows or glazing 4 docs