Planning application
26/03500/FULL
Fourth Floor 40 New Bond Street London W1S 2RX
Proposal
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
As published by the council, reference 26/03500/FULL
Timeline
Dates from the published record
-
28 May 2026
Received by Westminster
-
4 Jun 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Westminster for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/03501/LBC Awaiting decision
Fourth Floor 40 New Bond Street London W1S 2RX
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03500/FULL]
-
26/01898/FULL Awaiting decision
39 - 42 New Bond Street London W1S 2SQ
Installation of plant at roof level within existing acoustic enclosure, new intake and extract louvres within existing openings, and associated pipework and servicing infrastructure. Installation of new HVAC and M&E systems, raised access flooring, new lighting and fit-out, formation of meeting rooms, and refurbishment of the ground floor entrance lobby; together with external alterations comprising. Internal and external refurbishment works, including full internal strip-out and reconfiguration at Levels 3 and 5. (Linked with 26/01899/LBC)
-
04/09359/LBC Granted
49 Maddox Street London W1S 2PQ
Removal of existing flues, erection and installation of new extraction and ventilation equipment on rear roof and elevation.
-
04/09358/FULL Granted
49 Maddox Street London W1S 2PQ
Continued use of ground floor for cafe/restaurant purposes (Class A3) and installation of new ventilation duct at rear.
-
04/02758/FULL Withdrawn
49 Maddox Street London W1S 2PQ
Installation of extraction and ventilation equipment and removal of existing kitchen flues to rear.
-
04/02759/LBC Withdrawn
49 Maddox Street London W1S 2PQ
Installation of extraction and ventilation equipment and removal of existing flues at rear.
Other full applications applications
In Westminster
-
26/04824/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Detailed design and specification of new blinds to NZH based on mock-up trials on-site. pursuant to condition 32 (i) of planning permission dated 8th April 2024 (23/00571/FULL).
-
26/04829/ADFULL Granted
New Zealand House 80 Haymarket London SW1Y 4TE
Details of external and internal signage strategy pursuant to Condition 33(E) of planning permission dated 8th April 2024 (RN: 23/00571/FULL)
-
26/04841/ADFULL Granted
29 Henstridge Place London NW8 6QD
Details of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 5 of planning permission dated 18th November 2025 (RN:25/06159).
-
26/04989/FULL Awaiting decision
1 Kildare Terrace London W2 5JT
Erection of a mansard roof extending over the main house and side wing, replacement lower ground rear extension with roof terrace above, lowering of lower ground floor slab, installation of an air source heat pump in rear garden, new front boundary treatment, and new second floor window on the north elevation.
-
26/04986/FULL Awaiting decision
Inver Court Inverness Terrace London W2 6JB
Replacement of combustible materials in the render facades; timber decking and plastic soffits/ fascias to terraces with non-combustible materials on the 5th and 6th floors.