Planning application
Fourth Floor 40 New Bond Street London W1S 2RX
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03500/FULL]
As published by the council, reference 26/03501/LBC
Application record
- Reference
- 26/03501/LBC
- Type
- Listed Building Consent Application
- Status
- Pending
- Received
- 28 May 2026
- Validated
- 4 Jun 2026
- Ward
- West End
- Postcode
- W1S 2RX
Site history
Applications at this address on the Westminster register
This site has had 4 applications since 2026.
-
26/05587/ADFULL Decided
Fourth Floor 40 New Bond Street London W1S 2RX
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of planning permission dated 27th July 2026 (26/03500/FULL)
-
26/05688/ADLBC Decided
Fourth Floor 40 New Bond Street London W1S 2RX
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th July 2026 (26/03501/LBC)
-
26/03500/FULL Awaiting decision
Fourth Floor 40 New Bond Street London W1S 2RX
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
Timeline
Dates from the published record
-
28 May 2026
Received by Westminster
-
4 Jun 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Westminster took a median of 91 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/05688/ADLBC Decided
Fourth Floor 40 New Bond Street London W1S 2RX
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th July 2026 (26/03501/LBC)
Who's behind it
Company information only, from the register and Companies House
SM Planning Ltd Agent, a planning consultancy
114 applications on PlanIndex · across 24 councils · 81% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Westminster for determination, against a statutory target of eight weeks. Over the last year Westminster decided heritage and listed building applications in a median of 119 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Fourth Floor 40 New Bond Street London W1S 2RX
88% historically approved · decision due ~30 Jul
Reconfiguration and refurbishment of the existing office at level 4, installation of new air-conditioning unit within existing acoustic enclosure at roof level, new associated pipework and installation of new louvres within rear windows. [Linked to 26/03501/LBC]
Awaiting decision Full applications Windows or glazing 31 docs -
Fourth Floor 40 New Bond Street London W1S 2RX
89% historically approved · decision due ~12 Oct
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of planning permission dated 27th July 2026 (26/03500/FULL)
Decided Windows or glazing -
Fourth Floor 40 New Bond Street London W1S 2RX
89% historically approved · decision due ~12 Oct
Details of new louvres and how they relate to the existing window frame pursuant to Condition 5 of listed building consent dated 27th July 2026 (26/03501/LBC)
Decided Windows or glazing -
39 - 42 New Bond Street London W1S 2SQ
88% historically approved · decision due ~19 May
Installation of plant at roof level within existing acoustic enclosure, new intake and extract louvres within existing openings, and associated pipework and servicing infrastructure. Installation of new HVAC and M&E systems, raised access flooring, new lighting and fit-out, formation of meeting rooms, and refurbishment of the ground floor entrance lobby; together with external alterations comprising. Internal and external refurbishment works, including full internal strip-out and reconfiguration at Levels 3 and 5. (Linked with 26/01899/LBC)
Awaiting decision Full applications 62 docs -
41-42 New Bond Street London W1S 2RZ
Display of a non-illuminated advertising hoarding measuring 7.32m high x 8.62m wide x 3.1m deep, for temporary period from June 2011 to September 2011.
Refused Advertising 4 docs -
41-42 New Bond Street London W1S 2RZ
New shopfront and internal refurbishment of the basement, ground and first floors including relocation of the staircase and lift. Installation of 3 air conditioning units and alterations to the rear of the property.
Withdrawn Heritage and listed buildings Windows or glazing 4 docs
Other heritage and listed building applications
In Westminster
-
26/07529/LBC Awaiting decision
69 Eaton Place London SW1X 8DF
Installation of new cast iron water supply pipe on rear courtyard elevation. (Linked with 26/07528/FULL)
-
26/07509/LBC Awaiting decision
Buckingham Palace The Mall London SW1A 1AA
Replacement of existing security lighting to the Buckingham Palace Forecourt with 80 compact LED spotlights installed within the lantern clusters across 10 principal piers, with associated concealed cabling and reversible fixings. (Linked with 26/07508/FULL)
-
26/07473/LBC Awaiting decision
Flat 3 82 New Cavendish Street London W1G 9TA
Replacement windows to second floor level with vacuum, double glazing windows. (Linked with 26/07472/FULL)
-
26/07471/LBC Awaiting decision
12 Queen Anne's Gate London SW1H 9AA
Excavation of single-storey basement, internal reconfiguration and installation of modern services. (Linked with 26/07470/FULL)
-
26/07461/LBC Awaiting decision
1 Savile Row London W1S 3JR
Minor internal works comprising redecoration and upgrades to lighting, flooring and bathroom and kitchen facilities, together with external works including new lighting and signage.